Planning application
Lands south east of Copelands Link Roundabout at the Comber By Pass, Comber, BT23 5BS
Decided. The decision notice on the council portal carries the outcome in full, including any conditions.
Proposal
Discharge of Condition 10 of planning application reference LA06/2019/0568/RM which states: No site works of any nature or development shall take place until a programme of archaeological work (POW) has been prepared by a qualified archaeologist, submitted by the applicant and approved by the council in consultation with Historic Environment Division, Department for the Communities. The POW shall provide for : - the identification and evaluation of archaeological remains within the site - mitigation of the impacts of development through licensed excavation recording or by preservation of remains in situ - post excavation analysis sufficient to prepare an archaeological report, to publication standard if necessary; and - preparation of the digital documentary and material archive for deposition”
As published by the council, reference LA06/2024/1017/DC
Application record
- Reference
- LA06/2024/1017/DC
- Type
- Discharge of Condition
- Status
- Determined
- Decision
- Condition Discharged
- Received
- 29 Nov 2024
- Validated
- 11 Dec 2024
- Decided
- 20 Dec 2024
- Ward
- Comber South
- Postcode
- BT23 5BS
Timeline
Dates from the published record
-
29 Nov 2024
Received by Ards and North Down
-
11 Dec 2024
Validated
Checked as complete and ready for consideration.
-
20 Dec 2024
Decision issued: Condition Discharged
-
3 Sep 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, an architecture practice registered in Hinckley
32 applications on PlanIndex · across 8 councils
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
6 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsAfter the decision
Ards and North Down has decided this application; the outcome above is the register's own wording and the decision notice on the council portal carries the detail. More in our guide to what happens after a planning decision.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Lands south east of the Copelands Link Roundabout at the Comber Bypass
Discharge of Condition No. 13 of planning approval LA06/2019/0568/RM which states: 'Prior to the commencement of development, a phased landscape plan will be submitted to and agreed in writing with the Council. This phased plan will show the landscaping of the site to be in general conformity with Stamped Approval Drawing Numbers 02 REV C, 06 REV C and 6D date stamped 24 February 2022. Reason: To ensure that the public open space provision and boundary details are completed in a timely matter in the interests of amenity.
Decided Conditions 6 docs -
Lands south east of the Copelands Link roundabout at the Comber By Pass, Comber, BT23 5BW
96% historically approved · decision due ~6 Feb
Discharge of condition 12 of approval LA06/2019/0568/RM Final Archaeological Report A programme of post-excavation analysis, preparation of an archaeological report, dissemination of results and preparation of an excavation archive shall be undertaken in accordance with the programme of archaeological work approved under condition 10. These measures shall be implemented and a final archaeological report shall be submitted to the local council within 12 months of the completion of archaeological site works, or as otherwise agreed in writing with council.
Awaiting decision Conditions 4 docs -
Lands South East of the Copelands Link Roundabout at the Comber Bypass, Comber
96% historically approved · decision due ~29 Jan
Discharge of Condition 12 of previously approved application LA06/2018/0997/RM which states:- A programme of post excavation analysis , preparation of an Archaeological Report dissemination of results and preparation of the excavation archive shall be undertaken in accordance with the programme of archaeological work approved under condition 10. These measures shall be implemented and a final archaeological report shall be submitted to local council within 12 months of the completion or archaeological site works , or as otherwise agreed in writing with council Submitted documentation: Final Archaeological Report
Awaiting decision Conditions 5 docs -
Lands SE of the Copelands Link roundabout at the Comber Bypass, Comber
Discharge of condition 10 to the planning approval LA06/2018/0997/RM, which states: No site works of any nature or development shall take place until a programme of archaeological work (POW) has been prepared by a qualified archaeologist, submitted by the applicant and approved in writing by the Council in consultation with Historic Environment Division, Department for Communities. The POW shall provide for - the identification and evaluation of archaeological remains within the site; - mitigation of the impacts of the development through licensed excavation recording or by preservation of remains in-situ post-excavation analysis sufficient to prepare an archaeological report, to publication standard if necessary; and – preparation of the digital, documentary and material archive for deposition .
Decided Conditions 5 docs -
Lands South East of the Copelands Link Roundabout at the Comber Bypass
Discharge of Condition 13 of approval LA06/2018/0997/RM which states 'Prior to the commencement of development, a phased landscape plan will be submitted to and agreed in writing with Council. This phased plan will show the landscaping of the site to be in general conformity with Stamped Approved Drawing Numbers 12 date stamped 07 September 2018 and 18 Rev C, date stamped 24 February 2022.'
Decided Conditions 4 docs -
Lands South East of Comber By-Pass
Discharge of Condition 16 of approval X/2012/0514/F Condition 16 of X/2012/0514/F - Monitoring reports shall be provided yearly to the Department on the anniversaryof the commencement of remediation operations, to include summaries of the leachate, gas, environmental monitoring data and stability/erosion observations and actions from the site over the previous 12 months, compared with the monitoring requirements in the Site Management Plan. The annual monitoring reports shall include details of the actions taken to maintain the site stability under the Stability, Erosion and Subsidence Monitoring and Management Action Plan. The annual monitoring reports shall continue to be submitted to the Department until such time that it can be demonstrated to the satisfaction of the Department that the risks have been managed.
Decided Conditions 7 docs
Other condition discharge and variation applications
In Ards and North Down
-
LA06/2026/0705/DC Decided
3 (The Square) Portaferry Road Cloughey BT22 1HR And lands adjoining 5,7 and 9 Portaferry Road, BT22 1HP and 2,12,18 and 22 Mill Lane Cloughey, BT22 1HT
Discharge of Condition 6 of previously approved application LA06/2019/0634/F which states:- The development herby permitted shall not be commenced until a Street Lighting scheme design has been submitted and approved by DFI Street Lighting Section Documents relating to Street Lighting Scheme Design that have been submitted to and Approved by the DFI Street Lighting Section
-
LA06/2026/0760/DC Decided
Lands to rear of 38 High Street Donaghadee with access adjacent to 11-13 New Street Donaghadee
Discharge of Condition 7 of previously approved application LA06/2017/0959/F which states:- No development shall take place until full details of all proposed tree and shrub planting and a programme of works, have been submitted to and approved in writing by the Council and all tree and shrub planting shall be carried out in accordance with those details and at those times. Reason: To ensure the provision, establishment, and maintenance of a high standard of landscape. Please describe which part of the condition this application relates to: This Landscape Proposal presents a design scheme prepared by a qualified landscape architect, and will provide for the provision and establishment of a high standard of landscape. TSA Covering Letter Landscaping Proposal Site Location Plan Decision Notice
-
LA06/2026/0780/DC Awaiting decision
Cordners,13 Conway Square, Newtownards, BT23 4DA
Discharge of Condition 2 of previously approved application LA06/2025/1089/F which states:- No site works of any nature or development shall take place until a programme of archaeological work (POW) has been prepared by a qualified archaeologist, submitted by the applicant and approved in writing by Ards and North Down Borough Council (ANDBC) in consultation with Historic Environment Division, Department for Communities. The POW shall provide for: • The identification and evaluation of archaeological remains within the site; • Mitigation of the impacts of development through licensed excavation recording or by preservation of remains in-situ; • Post-excavation analysis sufficient to prepare an archaeological report, to publication standard if necessary; and •Preparation of the digital, documentary and material archive for deposition. Reason: As required by Section 61 of the Planning Act (Northern Ireland) to ensure that archaeological remains within the application site are properly identified, and protected or appropriately recorded. Archaeological Impact assessment and Programme of Works proposed development works at Cordners, 13 Conway Square, Newtownards BT23 4DA
-
LA06/2026/0678/DC Decided
Lands to the rear of 38 High Street, Donaghadee
Partial Discharge of Condition 5 Of Planning Approval LA06/2017/0959/F No site works of any nature, or development shall take place until a programme of archaeological work has been implemented, in accordance with a written scheme and programme prepared by a qualified archaeologist, submitted by the applicant and approved by the Council. The programme should provide for the identification and evaluation of archaeological remains within the site, for mitigation of the impacts of development, through excavation recording or by preservation of remains, and for preparation of an archaeological report. Reason: to ensure that archaeological remains within the application site are properly identified and protected or appropriately recorded. This report presents a written scheme and programme prepared by a qualified archaeologist, and will provide for the identification and evaluation of any potential archaeological remains within the site. Documents provided: TSA Covering Letter Archaeological Programme of Works prepared by Alan Reilly, NAC Ltd. Site location Plan Decision Notice
-
LA06/2026/0656/DC Decided
Lands to and South of Nos 37-77 Court Street and Nos 1-11 Canal Row, situated within Bawn Wall and bounded by the Canal, Newtownards
Discharge of condition 15 of planning approval LA06/2023/2434/F Which States: "On completion of the remediation and prior to the occupation of any dwelling hereby approved, the applicant shall provide to the Council, for approval in writing, a Verification Report. This report shall demonstrate that the remediation measures outlined in the report titled; ‘Contaminated Land Assessment (Phase 1 PRA, Phase 2 GQRA and Outline Remediation Strategy) Lands within the Bawn Wall, Newtownards, referenced P3098-1 and dated November 2023, have been fully implemented. This report shall demonstrate the successful completion of remediation works and demonstrate that the site is now fit for end-use and include details of: • Capping system • The methodology and programme of the capping system • Photographs and records of any excavation works within the source area including photographs showing depths to accommodate the capping layer • Photographs of the clean material being used and placed on the source area, also showing depths being placed • Records and photographs showing the depth of the capping system as required • Details of the materials that were used for the capping system along with laboratory certificates and results which confirm that the materials are suitable for use."