Planning application
7 Braddock Reach, Killinchy, BT23 6PY
Decided. The decision notice on the council portal carries the outcome in full, including any conditions.
Proposal
Discharge of condition 12 of previously approved application LA06/2022/1239/F which states - No development shall take place on-site until the method of sewage and surface water disposal has been agreed in writing with Northern Ireland Water (NIW) or a consent to discharge has been granted under the terms of the Water (NI) Order 1999. Reason: To ensure no adverse effect on the water environment. Statement dated 27/11/24 from Robert Gilmour Architects, Email from NIWater dated 27/11/24
As published by the council, reference LA06/2024/1010/DC
Application record
- Reference
- LA06/2024/1010/DC
- Type
- Discharge of Condition
- Status
- Determined
- Decision
- Condition Partially Discharged
- Received
- 27 Nov 2024
- Validated
- 27 Nov 2024
- Decided
- 16 Dec 2024
- Ward
- Killinchy
- Postcode
- BT23 6PY
Timeline
Dates from the published record
-
27 Nov 2024
Received by Ards and North Down
-
16 Dec 2024
Decision issued: Condition Partially Discharged
-
27 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, an architecture practice
52 applications on PlanIndex · across 6 councils · 100% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
3 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsAfter the decision
Ards and North Down has decided this application; the outcome above is the register's own wording and the decision notice on the council portal carries the detail. More in our guide to what happens after a planning decision.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Lands directly north of 107 Whiterock Road, Whiterock, Killinchy
Replacement NI Water Overground Control Kiosk and all associated site works.
Granted Full applications 37 docs -
6 Darragh, Whiterock, Killinchy
Single-storey extension to rear; new door/window at side; garden room/home office in front garden
Granted Full applications Extension Windows or glazing 11 docsSmall domestic -
16 Inisharoan, Killinchy, BT23 6QF
Boat House with a Store/Games Room over (additional info received)
Granted Full applications 21 docs
Other condition discharge and variation applications
In Ards and North Down
-
LA06/2026/0752/DC Decided
3 (The Square) Portaferry Road Cloughey BT22 1HR And lands adjoining No.s 5,7 and 9 Portaferry Road, BT22 1HP and No.s 2,12,18 and 22 Mill Lane Cloughey, BT22 1HT
Discharge of Condition 8 of Planning Approval: LA06/2019/0634/F - The drainage assessment states that it is proposed to attenuate more than the 30 year event in the drainage network. Therefore, prior to the commencement of any development hereby permitted, a final drainage assessment, containing a detailed drainage network design and compliant with Annex D of PPS 15 must be submitted to the Council for its consideration and written approval; or written confirmation from NIW stating that they will adopt a drainage network that will attenuate the 1 in 100 year storm event.
-
LA06/2026/0522/DC Decided
Lands to the NW of Kiltonga Industrial Estate SW of Belfast Road and South of Milecross Road Newtownards
Discharge of Condition 29 of previously approved application LA06/2021/1476/F which states: A programme of post-excavation analysis, preparation of an archaeological report, dissemination of results and preparation of the excavation archive shall be undertaken in accordance with the programme of archaeological work approved under condition 27. These measures shall be implemented, and a final archaeological report shall be submitted to the Council within 12 months of the completion of archaeological site works, or as otherwise agreed in writing with the Council. Submitting a POW report which states discovery that there was an archaeological evaluation carried out in 2017 across the site which didn’t encounter any archaeology. This should mean no further archaeological works are required on site
-
LA06/2026/0765/DC Decided
3 The Square, Portaferry Road, Cloughey, BT22 1HR and lands adjoining 5,7 and 9 Portaferry Road, BT22 1HP and 2,12,18 and 22 Mill Lane Cloughey, BT22 1HT
Discharge of Condition 3 of previously approved application LA06/2019/0634/F which states:- No other development hereby permitted shall be commenced until works necessary for the improvement of a public road have been completed in accordance with the details outlined in blue on Drawing 30 bearing the date stamp 09/06/2021. The council hereby attaches to the determination a requirement under Article 3 (4A) of the above Order that such works shall be carried out in accordance with an agreement under Article 3 (4C) Letter from DFI Roads / Southern condition confirming that following a recent site visit that the formation of the access and associated improvement works to the public road, as required as part of the Article 3(4c) have been completed in accordance withe approved Private Streets Determination drawings (under Planning Permission LA06/2019/0634/F) and to the required standard
-
LA06/2026/0420/DC Decided
Lands adjacent to and Northeast of 3 Warren Avenue Donaghadee, BT21 0PE. Access via Warren Avenue to Warren Road
Discharge of Condition 8 of Planning Approval LA06/2020/0558/F which states 'A final detailed Construction Environmental Management Plan (CEMP) shall be submitted to and approved by Council in consultation with the Shared Environmental Service (SES) prior to the commencement of development. The final CEMP shall reflect all the mitigation and avoidance measures detailed in the outline CEMP. The final CEMP shall be adhered to and implemented throughout the construction period and in accordance with the approved details, unless otherwise agreed in writing by the Council.'
-
LA06/2026/0705/DC Decided
3 (The Square) Portaferry Road Cloughey BT22 1HR And lands adjoining 5,7 and 9 Portaferry Road, BT22 1HP and 2,12,18 and 22 Mill Lane Cloughey, BT22 1HT
Discharge of Condition 6 of previously approved application LA06/2019/0634/F which states:- The development herby permitted shall not be commenced until a Street Lighting scheme design has been submitted and approved by DFI Street Lighting Section Documents relating to Street Lighting Scheme Design that have been submitted to and Approved by the DFI Street Lighting Section