Planning application

66 Castle Lane, Newtownards, BT23 5EB

Granted Ards and North Down LA06/2024/0695/DC Discharge of Condition

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Discharge of Condition 5 from previously approved application LA06/2023/2277/O which states: No site works of any nature or development shall take place until a programme of archaeological work, has been implemented in accordance with a written scheme and programme prepared by a qualified archaeologist, submitted by the applicant and approved by the Council. The programme should provide for the identification and evaluation of archaeological remains within the site, for mitigation of the impacts of development, through evacuation recording or by preservation of remains and for preparation of an archaeological report.

As published by the council, reference LA06/2024/0695/DC

Application record

Reference
LA06/2024/0695/DC
Type
Discharge of Condition
Status
Determined
Decision
Granted As published: Condition Partially Discharged
Received
13 Aug 2024
Validated
20 Aug 2024
Decided
21 Oct 2024
Ward
Comber West
Postcode
BT23 5EB

Timeline

Dates from the published record

  1. 13 Aug 2024

    Received by Ards and North Down

  2. 20 Aug 2024

    Validated

    Checked as complete and ready for consideration.

  3. 21 Oct 2024

    Decision issued: Condition Partially Discharged

  4. 27 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

3 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Ards and North Down granted permission on 21 October 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 66 Castle Lane, Comber, BT23 5EB

    LA06/2026/0285/S54 Submitted 2 Apr 2026 50 yards away

    Erection of 20 dwellings (renewal of outline approval LA06/2016/0253/O). Variation of Condition 11 of planning permission LA06/2023/2277/O to amend the remediation and verification requirements to prior to occupation, to reflect the Updated Remediation Strategy dated March 2026. (Full proposal description available on the NI Planning Portal).

    Granted 11 docs
    Major scheme
  • Lands at 66 Castle Lane, Mount Alexander, Comber, BT23 5EB

    LA06/2025/0718/RM Submitted 14 Aug 2025 50 yards away

    Demolition of existing buildings and erection of 20no. dwellings with associated landscaping, site works, car parking and access arrangements from Castle Lane

    Granted Reserved matters Demolition 87 docs
    Major scheme
  • 2 Meadow Brook Comber BT23 5ED

    LA06/2026/0221/F Submitted 14 Mar 2026 150 yards away

    Porch, 1m fence to the side and conversion of attached garage into living space

    Granted Full applications Extension 19 docs
    Small domestic
  • Lands adjoining and NE of 1-16 Castlelodge Park Comber BT23 5DW

    LA06/2023/1516/DC Submitted 27 Feb 2023 250 yards away

    Discharge of condition 14 of LA06/2022/0459/F, which states "An invasive species management plan (ISMP) shall be submitted to and agreed in writing by the Council prior to the commencement of development. The ISMP shall be subsequently implemented as approved to the satisfaction of the Council. The plan shall detail the measures to be used to eradicate Himalayan Balsam. There are several options for dealing with Himalayan Balsam outlined in the Invasive Species Ireland “Best Practice Management Guidelines Himalayan Balsam” document. For further information please see, http://invasivespeciesireland.com/toolkit/invasive-plant-management/terrestrialplants/himalayan-balsam"

    Granted Conditions 11 docs
  • Directly North of 61 Castle Street, Comber, BT23 5DY

    LA06/2026/0354/F Submitted 25 Apr 2026 400 yards away

    1no. shipping container to be used as self-tanning booth (Sui Generis use class) and 1no. retrospective self-service parcel collection unit (Amended Plans/Description)

    Granted Full applications 16 docs
  • 68 Belfast Road, Comber, Newtownards, BT23 5QP

    LA06/2025/1118/NMC Submitted 12 Dec 2025 400 yards away

    Changes to roof design and minor window adjustments.

    Granted Amendments Windows or glazing 3 docs

In Ards and North Down

  • LA06/2026/0884/DC Awaiting decision

    Vacant site North of Balloo Road, West of Bangor Grammar sports pitches and to the rear of nos 1-13 Rowan Glen, Balloo Road, Bangor, BT19 7UU

    Discharge of Condiition 10 of previously approved application LA06/2022/0873/F which states - Prior to the construction of the drainage network, the applicant shall submit a Drainage Assessment, compliant with Policy FLD 3 & Annex D of PPS 15, to be agreed in writing with the Council, which demonstrates the safe management of any out of sewer flooding emanating from the surface water drainage network, agreed under Article 161 under the Water and Sewerage Services Act (Northern Ireland) 2016, in a 1 in 100 year event. Reason: In order to safeguard against surface water flood risk

    Received 25 Sep, published by the council 1 Oct 2026 Conditions
  • LA06/2026/0887/DC Awaiting decision

    Former Juvenile Justice Services Centre site (169 Rathgael Road) and surrounding lands which lie to the north of the Rathgael Road and west of the Rathgael Road/Balloo Road/Newtownards Road roundabout junction Bangor

    Discharge of Condition 9 of previously approved application LA06/2016/0596/F which states - Prior to the occupation of the proposed development, the applicant shall provide to the Council, for approval, a Verification Report. This report must demonstrate that all the measures outlined in Section 10 of the RPS report entitled Proposed Residential Development, Rathgael Road, Bangor, Remedial Strategy referenced IBR0736 and bearing the Council date stamp 17th June 2016 have been fully implemented. The Verification Report shall demonstrate the successful completion of the remediation works and that the site is now fit for end-use. It must demonstrate that the identified potential pollutant linkages are effectively broken. The Verification Report shall be in accordance with current best practice and guidance as outlined by the Environment Agency. In particular, this Verification Report must demonstrate: a) Full Details of the installation and depths of the clean cover barriers have been confirmed as per layout. b) All fuel transfer lines and all associated pipework have been traced and removed in accordance with PPG 2 Above Ground Oil Storage Tanks. All remaining soils (or base and side-walls of all excavations) have been sampled and proven suitable for the proposed end-use. c) The hotspots of heavy metal and hydrocarbon contamination have been removed by excavation to a depth of 0.5m below the depth of the exceedance. All remaining soils (or base and side-walls of all excavations) have been sampled and demonstrably proven suitable for the proposed end-use. d) All imported soil brought on to the site has been accompanied by traceability documentation and has been demonstrably proven to be suitable for the end use. Reason: In the interests of living conditions of residents of the proposed development. Remedial Verification Report

    Received 25 Sep, published by the council 1 Oct 2026 Conditions
  • LA06/2026/0879/DC Awaiting decision

    Royal Hotel and Windsor Bar, 22-28 Quay Street, Bangor, BT20 5ED

    Discharge of Condition 6 of previously approved application LA06/2021/1477/F which states - Prior to the construction of the drainage network, a Drainage Assessment, compliant with FLD 3 & Annex D of PPS 15, shall be submitted to and agreed in writing by the Council which demonstrates the safe management of any out of sewer flooding emanating from the surface water drainage network, in a 1 in 100 year event with an additional allowance for climate change. Reason: To safeguard against flood risk to the development and from the development to elsewhere. Drainage Assessment produced by Design ID ref 19053-DID-ZZ-XX-RP-0002

    Received 23 Sep, published by the council 1 Oct 2026 Conditions
  • LA06/2026/0878/DC Awaiting decision

    Royal Hotel and Windsor Bar, 22-28 Quay Street, Bangor, T20 5ED

    Discharge of Condition 5 of previously approved application LA06/2021/1477/F which states - No development shall take place on-site until the method of sewage disposal has been agreed in writing with Northern Ireland Water (NIW) or a consent to discharge has been granted under the terms of the Water (NI) Order 1999. Reason: To ensure there will be no adverse impact on the environment. NI Water agreement

    Received 23 Sep, published by the council 1 Oct 2026 Conditions
  • LA06/2026/0873/DC Awaiting decision

    Lands South of 37-77 Court Street and 1-11 Canal Row, situated within Bawn Wall and bounded by the canal, Newtowards

    Discharge of Condition 15 of previously approved application LA06/2023/2434/F which states - On completion of the remediation and prior to the occupation of any dwelling hereby approved, the applicant shall provide to the Council, for approval in writing, a Verification Report. This report shall demonstrate that the remediation measures outlined in the report titled; ‘Contaminated Land Assessment (Phase 1 PRA, Phase 2 GQRA and Outline Remediation Strategy) Lands within the Bawn Wall, Newtownards, referenced P3098-1 and dated November 2023, have been fully implemented. This report shall demonstrate the successful completion of remediation works and demonstrate that the site is now fit for end-use and include details of: • Capping system • The methodology and programme of the capping system • Photographs and records of any excavation works within the source area including photographs showing depths to accommodate the capping layer • Photographs of the clean material being used and placed on the source area, also showing depths being placed • Records and photographs showing the depth of the capping system as required • Details of the materials that were used for the capping system along with laboratory certificates and results which confirm that the materials are suitable for use. Reason: Protection of human health. VERIFICATION REPORT FOR PHASE 5 (UNITS 1-6 AND 34-41)

    Received 23 Sep, published by the council 1 Oct 2026 Conditions