Planning application
46 BELFAST ROAD MILECROSS NEWTOWNARDS DOWN BT23 4TU
Works: Extension
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Carpark Extension for EV Charging
As published by the council, reference LA06/2023/2345/F
Application record
- Reference
- LA06/2023/2345/F
- Type
- Full
- Status
- Determined
- Decision
- Granted
- Received
- 25 Oct 2023
- Validated
- 9 Nov 2023
- Decided
- 9 Oct 2024
- Ward
- Scrabo
- Postcode
- BT23 4TU
Timeline
Dates from the published record
-
25 Oct 2023
Received by Ards and North Down
-
9 Nov 2023
Validated
Checked as complete and ready for consideration.
-
9 Oct 2024
Decision issued: Granted
-
27 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, an architecture practice
46 applications on PlanIndex · across 4 councils · 92% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
16 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Ards and North Down granted permission on 9 October 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Lands to the NW of Kiltonga Industrial Estate SW of Belfast Road and South of Milecross Road Newtownards
96% historically approved · decision due ~3 Oct
Discharge of Condition 24 of previously approved application LA06/2021/1476/F which states - No development activity, including ground preparation or vegetation clearance, shall take place until a Badger Mitigation Plan (BMP) has been submitted to and approved in writing by the Council. The approved BMP shall be implemented in accordance with the approved details, and all works on site shall conform to the approved BMP, unless otherwise approved in writing by the Council. As a minimum the BMP shall include the following: a) Details of updated surveys for badgers; b) Provision of 25m buffers between all development activity and all retained badger setts; c) Details of wildlife corridors to allow movement of badgers to and from setts and/or foraging areas; d) Details of appropriate fencing to protect badgers and their setts/wildlife corridors; e) Details of appropriate measures to protect badgers from harm during the construction phase; f) Details of the appointment of a competent ecologist to oversee the implementation of badger mitigation measures during the construction phase, including their roles, responsibilities and timing of visits. A Badger Mitigation Plan (BMP)
Awaiting decision Conditions 3 docs -
Lands to the NW of Kiltonga Industrial Estate SW of Belfast Road and South of Milecross Road Newtownards
96% historically approved · decision due ~19 Aug
Discharge of condition 23 or previously approved application LA06/2021/1476/F which states: A final Construction Environmental Management Plan (CEMP) shall be submitted to and approved in writing by the Council prior to the commencement of development or ground preparation or vegetation clearance. The CEMP shall be implemented in accordance with the approved details, and all works on site shall conform to the approved CEMP, unless otherwise approved in writing by the Council. The CEMP shall include details of: a) All mitigation detailed in Document 4: Outline CEMP (updated March 2024) and Document 5: Pond Restoration and Newt Mitigation Plan (updated August 2024); b) Construction methodology and timings of works; c) Pollution Prevention Plan; including suitable buffers between the location of all construction works, storage of excavated spoil and construction materials, any refuelling, storage of oil/fuel, concrete mixing and washing areas and any watercourses or surface drains present on or adjacent to the site; d) Site Drainage Management Plan; including Sustainable Drainage Systems (SuDS), foul water disposal and silt management measures; e) Environmental Emergency Plan; f) Final Protected Species Management and Lighting Plan; g) Final Pond Restoration and Newt Mitigation Plan including timetable for implementation of pond restoration works.
Awaiting decision Conditions 9 docs -
Lands to the NW of Kiltonga Industrial Estate SW of Belfast Road and South of Milecross Road Newtownards
Discharge of Condition 27 & 28 from approval LA06/2021/1476/F - 27. No site works of any nature or development shall take place until a programme of archaeological work (POW) has been prepared by a qualified archaeologist, submitted to and been approved in writing by the Council. The POW shall provide for: • The identification and evaluation of archaeological remains within the site; • Mitigation of the impacts of development through licensed excavation recording or by preservation of remains in-situ; • Post-excavation analysis sufficient to prepare an archaeological report, to publication standard if necessary; and • Preparation of the digital, documentary and material archive for deposition. Reason: To ensure that archaeological remains within the application site are properly identified and protected or appropriately recorded. 28. No site works of any nature or development shall take place other than in accordance with the programme of archaeological work approved under condition 27. Reason: To ensure that archaeological remains within the application site are properly identified and protected or appropriately recorded Discharge of Condition 27 and 28 A programme of archaeological work approved under condition 27 to discharge condition 28. It has been found out analysis was done on this site in 2017 and archaeological works are not required.
Decided Conditions 6 docs -
Lands to the NW of Kiltonga Industrial Estate SW of Belfast Road and South of Milecross Road Newtownards
Discharge of Condition for previous approval LA06/2021/1476/F - Condition 16 -In the event that piling is required, no development or piling work shall commence on this site until a piling risk assessment, undertaken in full accordance with the methodology contained within the Environment Agency document on "Piling and Penetrative Ground Improvement Methods on Land Affected by Contamination: Guidance on Pollution Prevention", has been submitted to and agreed in writing with the Council. All piling methods shall be in accordance with the agreed risk assessment. Discharge of condition no.16 - Piling risk assessment, undertaken in full accordance with the methodology contained within the Environment Agency document on "Piling and Penetrative Ground Improvement Methods on Land Affected by Contamination: Guidance on Pollution Prevention"
Decided Conditions 10 docs -
Lands to the NW of Kiltonga Industrial Estate SW of Belfast Road and South of Milecross Road Newtownards
Discharge of Condition 29 of previously approved application LA06/2021/1476/F which states: A programme of post-excavation analysis, preparation of an archaeological report, dissemination of results and preparation of the excavation archive shall be undertaken in accordance with the programme of archaeological work approved under condition 27. These measures shall be implemented, and a final archaeological report shall be submitted to the Council within 12 months of the completion of archaeological site works, or as otherwise agreed in writing with the Council. Submitting a POW report which states discovery that there was an archaeological evaluation carried out in 2017 across the site which didn’t encounter any archaeology. This should mean no further archaeological works are required on site
Decided Conditions 6 docs -
Lands to the NW of Kiltonga Industrial Estate SW of Belfast Road and South of Milecross Road Newtownards
Discharge of condition 27 of Planning Approval LA06/2021/1476/F which states: No site works of any nature or development shall take place until a programme of archaeological work (POW) has been prepared by a qualified archaeologist, submitted to and been approved in writing by the Council. The POW shall provide for: • The identification and evaluation of archaeological remains within the site; • Mitigation of the impacts of development through licensed excavation recording or by preservation of remains in-situ; • Post-excavation analysis sufficient to prepare an archaeological report, to publication standard if necessary; and • Preparation of the digital, documentary and material archive for deposition.
Withdrawn Conditions 3 docs
Other full applications
In Ards and North Down
-
LA06/2026/0432/F Granted
9 Marine Drive Donaghadee BT21 0HS
Single-storey extensions (front, side and rear) including car port; demolition of garage and lean-to structure
-
LA06/2026/0129/F Granted
104 Princetown Road, Bangor, BT20 3TG
Demolition of existing rear return: two-storey side-to-rear extension; single-storey side extension; relocation of access and all associated works
-
LA06/2026/0261/F Granted
Marine Biology Station 12-13 The Strand, Portaferry, BT22 1PF
Demolition of ''lean to' shed and erection of open sided canopies to be erected over new research tanks
-
LA06/2026/0417/F Granted
79a Whinney Hill, Dundonald, BT16 1UA
Single storey side sunroom and double garage with link to main dwelling.
-
LA06/2026/0454/F Granted
62 Jackson's Road, Holywood, BT18 9EZ
Roofspace conversion including rear dormer