Planning application
Midtown Strachan Banchory AB31 6LB
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
19 Span Overhead Lines (Retrospective)
As published by the council, reference APP/2025/1401
Application record
- Reference
- APP/2025/1401
- Type
- Hydro Electric Notification
- Status
- Decided
- Decision
- No Objection
- Received
- 25 Aug 2025
- Validated
- 25 Aug 2025
- Decided
- 4 Feb 2026
- Ward
- Banchory And Mid-Deeside
- Parish
- Feughside
- Decision by
- Delegated
- Postcode
- AB31 6LB
Timeline
Dates from the published record
-
25 Aug 2025
Received by Aberdeenshire
-
4 Feb 2026
Decision issued: No Objection
-
5 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
10 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Aberdeenshire granted permission on 4 February 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About less common application types
This application sits outside the common categories, and the council record linked on this page sets out the specific procedure that applies. More in our guide to planning application types.
Other less common application types
In Aberdeenshire
-
APP/2026/0761 Granted
Glendronach Distillery Forgue Huntly AB54 6DB
Erection of Overhead Line (Retrospective)
-
APP/2024/2146 Granted
Roemex Ltd Badentoy Crescent Badentoy Industrial Estate Portlethen Aberdeenshire AB12 4YD
Storage of Hazardous Substances
-
APP/2025/1786 Granted
132kV Overhead Line From Glendye Wind Farm To Fetteresso Substation
Consultation under Section 37 of The Electricity Act 1989 for the Installation of 132KV Overhead Line and Associated Infrastructure
-
APP/2025/1555 Granted
Land Approximately 1.2 Km To The South Of A950 Longside Peterhead Aberdeenshire AB42 0LY
Consultation under Section 36 of the Electricity Act 1989 for the Installation of Battery Energy Storage System (BESS) with an Installed Capacity of up to 400MW and Associated Works
-
APP/2026/0449 Granted
The Forkins Midmar AB51 7NR
Retrospective S37 Consent for Overhead Line