Planning application

Peterhead, Persley And Kintore

Awaiting decision Aberdeen City 260495/S37 Consultation (S.37 Electricity Act)

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Reconductoring of approximately 51 kilometres (km) of an existing 275 kilovolt (kV) overhead line (OHL), connecting substations between Peterhead and Kintore to enable operation at 400 kV, and approximately 12 km of existing 132 kV OHL connecting the existing Persley Tee to Persley Substation to enable operation at 275 kV

As published by the council, reference 260495/S37

Application record

Reference
260495/S37
Type
Consultation (S.37 Electricity Act)
Status
Pending
Received
29 Apr 2026
Validated
29 Apr 2026

Timeline

Dates from the published record

  1. 29 Apr 2026

    Received by Aberdeen City

  2. 22 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 24 June 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Aberdeen City took a median of 53 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

9 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with Aberdeen City for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About outline applications

How this application type works

An outline application tests the principle of developing a site before the detail is worked up. Some or all of the particulars, such as appearance, layout, scale, access and landscaping, are held back as reserved matters for later approval. Permission at outline stage does not by itself allow building to start; the reserved matters must be approved first.

More on outline applications in our guide

Nearby applications

Within 500 metres

In Aberdeen City

  • 260550/S36 Awaiting decision

    Bowdun Offshore Wind Farm 38 Kilometres To The East Of The Aberdeenshire Coast

    Construction and operation of generating station

    7 May 2026 Outline
  • 260211/ESC Decided

    Cityview Craigshaw Drive Aberdeen AB12 3BE

    Proposed demolition of offices and associated structures

    27 Feb 2026 Outline
  • 260033/ESC Decided

    Old Wellington Road/Old Stonehaven Road/Cove Road Aberdeen

    Proposed upgraded travel facilities to include footway, cycle track and all associated works

    20 Jan 2026 Outline
  • 260070/S36 Awaiting decision

    MarramWind Ltd 75 And 110 Kilometres Off The North-east Coast Of Scotland

    Construction and operation of generating station comprise up to 225 wind turbines, associated floating units (including mooring lines and anchors), array cables, subsea distribution centres and cable and scour protection

    20 Jan 2026 Outline
  • 260064/S36 Awaiting decision

    Approximately 63 Km East Coast Of Peterhead

    Construction and operation of generating station

    16 Jan 2026 Outline