Awaiting decision Aberdeen City 260495/S37 Consultation (S.37 Electricity Act)

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Reconductoring of approximately 51 kilometres (km) of an existing 275 kilovolt (kV) overhead line (OHL), connecting substations between Peterhead and Kintore to enable operation at 400 kV, and approximately 12 km of existing 132 kV OHL connecting the existing Persley Tee to Persley Substation to enable operation at 275 kV

As published by the council, reference 260495/S37

Application record

Reference
260495/S37
Type
Consultation (S.37 Electricity Act)
Status
Pending
Received
29 Apr 2026
Validated
29 Apr 2026

Timeline

Dates from the published record

  1. 29 Apr 2026

    Received by Aberdeen City

  2. 22 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 24 June 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Aberdeen City took a median of 54 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

9 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Aberdeen City for determination, against a statutory target of eight weeks. Over the last year Aberdeen City's median decision took 54 days. More in our guide to how long planning decisions take.

About outline applications

An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

In Aberdeen City

  • 260998/S37 Awaiting decision

    Kintore To Dyce Overhead Northern Circuit Aberdeen

    Reconductoring of approximately 10 km of the existing 132kV Kintore-Dyce overhead northern circuit, replacement of all associated fittings (including insulator sets) and the replacement of Tower KD37 with 2no new suspension towers

    Received 24 Aug, published by the council 27 Aug 2026 Outline
  • 260664/S36 Awaiting decision

    Morven South Offshore Wind Array Approximately 86 Km Off The Aberdeenshire Coast

    Construction and operation of generating station

    Received 3 Jun, published by the council 22 Jul 2026 Outline
  • 260663/S36 Awaiting decision

    Morven North Offshore Wind Array Approximately 61 Km Off The Aberdeenshire Coast

    Construction and operation of generating station

    Received 3 Jun, published by the council 22 Jul 2026 Outline
  • 260550/S36 Awaiting decision

    Bowdun Offshore Wind Farm 38 Kilometres To The East Of The Aberdeenshire Coast

    Construction and operation of generating station

    Received 7 May, published by the council 22 Jul 2026 Outline
  • 250930/S36 Decided

    Green Volt Offshore Windfarm East Of Aberdeenshire Coast

    Variation to S36 and marine licence for the windfarm and offshore transmission infrastructure for the export cable to landfall

    Received 27 Aug, published by the council 22 Jul 2026 Outline