Planning application
Green Volt Offshore Windfarm East Of Aberdeenshire Coast
Decided. The decision notice on the council portal carries the outcome in full, including any conditions.
Proposal
Variation to S36 and marine licence for the windfarm and offshore transmission infrastructure for the export cable to landfall
As published by the council, reference 250930/S36
Application record
- Reference
- 250930/S36
- Type
- Consultation (S.36 Electricity Act)
- Status
- Pending
- Decision
- Decision made by Scottish Ministers
- Received
- 27 Aug 2025
- Validated
- 27 Aug 2025
- Decided
- 16 Apr 2026
Timeline
Dates from the published record
-
27 Aug 2025
Received by Aberdeen City
-
16 Apr 2026
Decision issued: Decision made by Scottish Ministers
-
22 Jul 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
16 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsAfter the decision
Aberdeen City has decided this application; the outcome above is the register's own wording and the decision notice on the council portal carries the detail. More in our guide to what happens after a planning decision.
About outline applications
An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Salamander Offshore Wind Farm 35 Km East Of Peterhead North Sea
Construction and operation of an offshore generating station and offshore transmission infrastructure, comprising of up to seven wind turbine generators, with an anticipated generating capacity of 100 megawatts
Decided Outline 10 docs
Other outline applications
In Aberdeen City
-
260998/S37 Awaiting decision
Kintore To Dyce Overhead Northern Circuit Aberdeen
Reconductoring of approximately 10 km of the existing 132kV Kintore-Dyce overhead northern circuit, replacement of all associated fittings (including insulator sets) and the replacement of Tower KD37 with 2no new suspension towers
-
260664/S36 Awaiting decision
Morven South Offshore Wind Array Approximately 86 Km Off The Aberdeenshire Coast
Construction and operation of generating station
-
260663/S36 Awaiting decision
Morven North Offshore Wind Array Approximately 61 Km Off The Aberdeenshire Coast
Construction and operation of generating station
-
260550/S36 Awaiting decision
Bowdun Offshore Wind Farm 38 Kilometres To The East Of The Aberdeenshire Coast
Construction and operation of generating station
-
260495/S37 Awaiting decision
Peterhead, Persley And Kintore
Reconductoring of approximately 51 kilometres (km) of an existing 275 kilovolt (kV) overhead line (OHL), connecting substations between Peterhead and Kintore to enable operation at 400 kV, and approximately 12 km of existing 132 kV OHL connecting the existing Persley Tee to Persley Substation to enable operation at 275 kV