Green Volt Offshore Windfarm East Of Aberdeenshire Coast

Decided Aberdeen City 250930/S36 Consultation (S.36 Electricity Act)

Decided. The decision notice on the council portal carries the outcome in full, including any conditions.

Proposal

Variation to S36 and marine licence for the windfarm and offshore transmission infrastructure for the export cable to landfall

As published by the council, reference 250930/S36

Application record

Reference
250930/S36
Type
Consultation (S.36 Electricity Act)
Status
Pending
Decision
Decision made by Scottish Ministers
Received
27 Aug 2025
Validated
27 Aug 2025
Decided
16 Apr 2026

Timeline

Dates from the published record

  1. 27 Aug 2025

    Received by Aberdeen City

  2. 16 Apr 2026

    Decision issued: Decision made by Scottish Ministers

  3. 22 Jul 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

16 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

After the decision

Aberdeen City has decided this application; the outcome above is the register's own wording and the decision notice on the council portal carries the detail. More in our guide to what happens after a planning decision.

About outline applications

An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Salamander Offshore Wind Farm 35 Km East Of Peterhead North Sea

    250872/S36 Submitted 28 Jul 2025 0.3 miles away

    Construction and operation of an offshore generating station and offshore transmission infrastructure, comprising of up to seven wind turbine generators, with an anticipated generating capacity of 100 megawatts

    Decided Outline 10 docs

In Aberdeen City

  • 260998/S37 Awaiting decision

    Kintore To Dyce Overhead Northern Circuit Aberdeen

    Reconductoring of approximately 10 km of the existing 132kV Kintore-Dyce overhead northern circuit, replacement of all associated fittings (including insulator sets) and the replacement of Tower KD37 with 2no new suspension towers

    Received 24 Aug, published by the council 27 Aug 2026 Outline
  • 260664/S36 Awaiting decision

    Morven South Offshore Wind Array Approximately 86 Km Off The Aberdeenshire Coast

    Construction and operation of generating station

    Received 3 Jun, published by the council 22 Jul 2026 Outline
  • 260663/S36 Awaiting decision

    Morven North Offshore Wind Array Approximately 61 Km Off The Aberdeenshire Coast

    Construction and operation of generating station

    Received 3 Jun, published by the council 22 Jul 2026 Outline
  • 260550/S36 Awaiting decision

    Bowdun Offshore Wind Farm 38 Kilometres To The East Of The Aberdeenshire Coast

    Construction and operation of generating station

    Received 7 May, published by the council 22 Jul 2026 Outline
  • 260495/S37 Awaiting decision

    Peterhead, Persley And Kintore

    Reconductoring of approximately 51 kilometres (km) of an existing 275 kilovolt (kV) overhead line (OHL), connecting substations between Peterhead and Kintore to enable operation at 400 kV, and approximately 12 km of existing 132 kV OHL connecting the existing Persley Tee to Persley Substation to enable operation at 275 kV

    Received 29 Apr, published by the council 22 Jul 2026 Outline