Planning application

Approximately 63 Km East Coast Of Peterhead

Awaiting decision Aberdeen City 260064/S36 Consultation (S.36 Electricity Act)

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Construction and operation of generating station

As published by the council, reference 260064/S36

Application record

Reference
260064/S36
Type
Consultation (S.36 Electricity Act)
Status
Pending
Received
16 Jan 2026
Validated
16 Jan 2026

Timeline

Dates from the published record

  1. 16 Jan 2026

    Received by Aberdeen City

  2. 22 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 13 March 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Aberdeen City took a median of 54 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

5 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Aberdeen City for determination, against a statutory target of eight weeks. Over the last year Aberdeen City's median decision took 54 days. More in our guide to how long planning decisions take.

About outline applications

An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • MarramWind Ltd 75 And 110 Kilometres Off The North-east Coast Of Scotland

    260070/S36 Submitted 20 Jan 2026 250 yards away

    93% historically approved · decision due ~17 Mar

    Construction and operation of generating station comprise up to 225 wind turbines, associated floating units (including mooring lines and anchors), array cables, subsea distribution centres and cable and scour protection

    Awaiting decision Outline 5 docs

In Aberdeen City

  • 260998/S37 Awaiting decision

    Kintore To Dyce Overhead Northern Circuit Aberdeen

    Reconductoring of approximately 10 km of the existing 132kV Kintore-Dyce overhead northern circuit, replacement of all associated fittings (including insulator sets) and the replacement of Tower KD37 with 2no new suspension towers

    Received 24 Aug, published by the council 27 Aug 2026 Outline
  • 260664/S36 Awaiting decision

    Morven South Offshore Wind Array Approximately 86 Km Off The Aberdeenshire Coast

    Construction and operation of generating station

    Received 3 Jun, published by the council 22 Jul 2026 Outline
  • 260663/S36 Awaiting decision

    Morven North Offshore Wind Array Approximately 61 Km Off The Aberdeenshire Coast

    Construction and operation of generating station

    Received 3 Jun, published by the council 22 Jul 2026 Outline
  • 260550/S36 Awaiting decision

    Bowdun Offshore Wind Farm 38 Kilometres To The East Of The Aberdeenshire Coast

    Construction and operation of generating station

    Received 7 May, published by the council 22 Jul 2026 Outline
  • 260495/S37 Awaiting decision

    Peterhead, Persley And Kintore

    Reconductoring of approximately 51 kilometres (km) of an existing 275 kilovolt (kV) overhead line (OHL), connecting substations between Peterhead and Kintore to enable operation at 400 kV, and approximately 12 km of existing 132 kV OHL connecting the existing Persley Tee to Persley Substation to enable operation at 275 kV

    Received 29 Apr, published by the council 22 Jul 2026 Outline