Salamander Offshore Wind Farm 35 Km East Of Peterhead North Sea

Decided Aberdeen City 250872/S36 Consultation (S.36 Electricity Act)

Decided. The decision notice on the council portal carries the outcome in full, including any conditions.

Proposal

Construction and operation of an offshore generating station and offshore transmission infrastructure, comprising of up to seven wind turbine generators, with an anticipated generating capacity of 100 megawatts

As published by the council, reference 250872/S36

Application record

Reference
250872/S36
Type
Consultation (S.36 Electricity Act)
Status
Determined
Decision
No Observations
Received
28 Jul 2025
Validated
28 Jul 2025
Decided
18 Aug 2025
Decision by
No Decision

Timeline

Dates from the published record

  1. 28 Jul 2025

    Received by Aberdeen City

  2. 18 Aug 2025

    Decision issued: No Observations

  3. 22 Jul 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

10 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

After the decision

Aberdeen City has decided this application; the outcome above is the register's own wording and the decision notice on the council portal carries the detail. More in our guide to what happens after a planning decision.

About outline applications

An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Green Volt Offshore Windfarm East Of Aberdeenshire Coast

    250930/S36 Submitted 27 Aug 2025 411m away

    94% historically approved · decision due ~22 Oct

    Variation to S36 and marine licence for the windfarm and offshore transmission infrastructure for the export cable to landfall

    Awaiting decision Outline 16 docs

In Aberdeen City

  • 260550/S36 Awaiting decision

    Bowdun Offshore Wind Farm 38 Kilometres To The East Of The Aberdeenshire Coast

    Construction and operation of generating station

    7 May 2026 Outline
  • 260495/S37 Awaiting decision

    Peterhead, Persley And Kintore

    Reconductoring of approximately 51 kilometres (km) of an existing 275 kilovolt (kV) overhead line (OHL), connecting substations between Peterhead and Kintore to enable operation at 400 kV, and approximately 12 km of existing 132 kV OHL connecting the existing Persley Tee to Persley Substation to enable operation at 275 kV

    29 Apr 2026 Outline
  • 260211/ESC Decided

    Cityview Craigshaw Drive Aberdeen AB12 3BE

    Proposed demolition of offices and associated structures

    27 Feb 2026 Outline
  • 260033/ESC Decided

    Old Wellington Road/Old Stonehaven Road/Cove Road Aberdeen

    Proposed upgraded travel facilities to include footway, cycle track and all associated works

    20 Jan 2026 Outline
  • 260070/S36 Awaiting decision

    MarramWind Ltd 75 And 110 Kilometres Off The North-east Coast Of Scotland

    Construction and operation of generating station comprise up to 225 wind turbines, associated floating units (including mooring lines and anchors), array cables, subsea distribution centres and cable and scour protection

    20 Jan 2026 Outline