Planning application
Salamander Offshore Wind Farm 35 Km East Of Peterhead North Sea
Decided. The decision notice on the council portal carries the outcome in full, including any conditions.
Proposal
Construction and operation of an offshore generating station and offshore transmission infrastructure, comprising of up to seven wind turbine generators, with an anticipated generating capacity of 100 megawatts
As published by the council, reference 250872/S36
Application record
- Reference
- 250872/S36
- Type
- Consultation (S.36 Electricity Act)
- Status
- Determined
- Decision
- No Observations
- Received
- 28 Jul 2025
- Validated
- 28 Jul 2025
- Decided
- 18 Aug 2025
- Decision by
- No Decision
Timeline
Dates from the published record
-
28 Jul 2025
Received by Aberdeen City
-
18 Aug 2025
Decision issued: No Observations
-
22 Jul 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
10 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsAfter the decision
Aberdeen City has decided this application; the outcome above is the register's own wording and the decision notice on the council portal carries the detail. More in our guide to what happens after a planning decision.
About outline applications
An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Green Volt Offshore Windfarm East Of Aberdeenshire Coast
94% historically approved · decision due ~22 Oct
Variation to S36 and marine licence for the windfarm and offshore transmission infrastructure for the export cable to landfall
Awaiting decision Outline 16 docs
Other outline applications
In Aberdeen City
-
260550/S36 Awaiting decision
Bowdun Offshore Wind Farm 38 Kilometres To The East Of The Aberdeenshire Coast
Construction and operation of generating station
-
260495/S37 Awaiting decision
Peterhead, Persley And Kintore
Reconductoring of approximately 51 kilometres (km) of an existing 275 kilovolt (kV) overhead line (OHL), connecting substations between Peterhead and Kintore to enable operation at 400 kV, and approximately 12 km of existing 132 kV OHL connecting the existing Persley Tee to Persley Substation to enable operation at 275 kV
-
260211/ESC Decided
Cityview Craigshaw Drive Aberdeen AB12 3BE
Proposed demolition of offices and associated structures
-
260033/ESC Decided
Old Wellington Road/Old Stonehaven Road/Cove Road Aberdeen
Proposed upgraded travel facilities to include footway, cycle track and all associated works
-
260070/S36 Awaiting decision
MarramWind Ltd 75 And 110 Kilometres Off The North-east Coast Of Scotland
Construction and operation of generating station comprise up to 225 wind turbines, associated floating units (including mooring lines and anchors), array cables, subsea distribution centres and cable and scour protection