Planning application
Buchan Offshore Wind Approximately 75 Km Off The Coast Of Aberdeenshire North Sea
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Construction and operation of offshore generating station and offshore transmission infrastructure
As published by the council, reference 250924/S36
Application record
- Reference
- 250924/S36
- Type
- Consultation (S.36 Electricity Act)
- Status
- Pending
- Received
- 27 Aug 2025
- Validated
- 27 Aug 2025
Timeline
Dates from the published record
-
27 Aug 2025
Received by Aberdeen City
-
22 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 22 October 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Aberdeen City took a median of 53 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
89 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Aberdeen City for determination, against a statutory target of eight weeks. Over the last year Aberdeen City's median decision took 53 days. More in our guide to how long planning decisions take.
About outline applications
An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.
Other outline applications
In Aberdeen City
-
260550/S36 Awaiting decision
Bowdun Offshore Wind Farm 38 Kilometres To The East Of The Aberdeenshire Coast
Construction and operation of generating station
-
260495/S37 Awaiting decision
Peterhead, Persley And Kintore
Reconductoring of approximately 51 kilometres (km) of an existing 275 kilovolt (kV) overhead line (OHL), connecting substations between Peterhead and Kintore to enable operation at 400 kV, and approximately 12 km of existing 132 kV OHL connecting the existing Persley Tee to Persley Substation to enable operation at 275 kV
-
260211/ESC Decided
Cityview Craigshaw Drive Aberdeen AB12 3BE
Proposed demolition of offices and associated structures
-
260033/ESC Decided
Old Wellington Road/Old Stonehaven Road/Cove Road Aberdeen
Proposed upgraded travel facilities to include footway, cycle track and all associated works
-
260070/S36 Awaiting decision
MarramWind Ltd 75 And 110 Kilometres Off The North-east Coast Of Scotland
Construction and operation of generating station comprise up to 225 wind turbines, associated floating units (including mooring lines and anchors), array cables, subsea distribution centres and cable and scour protection