Planning agent
Hawes Associates
Registered in High Wycombe. 25 planning applications on PlanIndex across 11 councils . On the register from 2021 to 2026.
- 25 Applications on record
- 5 In the last 12 months
- 11 Councils
- 100% Granted of 18 decided
18 granted and 0 refused of 18 decided applications in our index. A record of decisions already made, not a forecast of the next one.
Where they work
What they file
-
Other36%
-
Prior approval28%
-
Full applications20%
-
Outline16%
Company record
From Companies House. Company information only; we never show personal contact details.
- Registered name
- HAWES ASSOCIATES LIMITED
- Company number
- 04820780
- Status
- Dissolved
- Incorporated
- 4 July 2003
- Registered in
- High Wycombe
Track record
The 10 most recent applications naming this firm
-
DC/26/02769 Granted
Land At Valley Road Little Blakenham Suffolk IP8 4LP
Application for Prior Approval for Construction of a below ground irrigation reservoir lined with engineered clay from the site (Stage 2 of Agricultural Determination DC/26/01277 under Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended) Schedule 2, Part 6, Class A)
-
DC/26/02769 Granted
Land At Valley Road Little Blakenham Suffolk IP8 4LP
Application for Prior Approval for Construction of a below ground irrigation reservoir lined with engineered clay from the site (Stage 2 of Agricultural Determination DC/26/01277 under Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended) Schedule 2, Part 6, Class A)
-
DC/26/0906/EIA Decided
Field 1 Km North East Of Bentwaters Airbase Orford Road Tunstall Suffolk
EIA Screening Opinion - A balanced cut and fill earth moving operation to create an irrigation reservoir for the storage of water from the Butley Marsh Hydrocycle. The water stored will be from the IDB pump which would otherwise be pumped into Butley Creek a tidal saline creek. The hydraulic containment will require a High Density Poly Ethylene (HDPE) membrane as ground investigations across the farm were unable to identify a suitable natural clay resource.
-
DC/26/0761/AGO Withdrawn
Field 400M South Of Grange Farm Cottages Ramsholt Road Alderton Suffolk
Prior Notification (Agricultural) - A balanced cut and fill earth moving operation to create an irrigation reservoir. The clay from beneath the site will be engineered into the water tight linning. The banks will be topsoiled and planted with grass. No materials will be brought onto or leave the site. Informal discussions with Suffolk County Archaeology suggests a trenching investigation will be requested. Why necessary for agriculture: Most of the farm is on light sand land which must have irrigation if it is to be used for vegeatable cropping. The Bawdsey Hydrocyle project will deliver water to a number of planned reservoirs on the peninsula, water that would otherwise be pumped to sea from the Internal Drainage Board pump at Bawdsey. There is extreme water pressure on existing direct summer abstraction licenses, all of which are expected to be cut back in the future, this will necessitate reservoir storage if high value vegetable cropping is to continue axcross the light lands of the Suffolk coast. Why designed for agriculture: The reservoir is situated close to the propsoed Hydrocyucle pipeline which will deliver water to a number of farm reservoirs in the area. A poweer supply is adjacent allowing high pressure distribution across the farm.
-
DC/26/0395/FUL Awaiting decision
Field 1 Km North East Of Bentwaters Airbase Orford Road Tunstall Suffolk
A balanced cut and fill earth moving operation to create an irrigation reservoir for the storage of water from the Butley Marsh Hydrocycle. The water stored will be from the IDB pump which would otherwise be pumped into Butley Creek a tidal saline creek. The hydraulic containment will require a High Density Poly Ethylene (HDPE) membrane as ground investigations across the farm were unable to identify a suitable natural clay resource.
-
2025/2863 Granted
Land West Of Sloe Lane Rackheath Norfolk
Construction of a balanced cut and fill earth moving operation to create a winter storage irrigation reservoir (prior notification)
-
2025/2863 Granted
Land West Of Sloe Lane Rackheath Norfolk
Construction of a balanced cut and fill earth moving operation to create a winter storage irrigation reservoir (prior notification)
-
25/01482/AGDET Awaiting decision
Land North West Of Junction Of Warboys Bridleway 16 And Millers Way Warboys
Application to determine if prior approval is required for a proposed: Excavations or Deposits of Waste Material reasonably necessary for the purposes of Agriculture
-
DC/25/2889/FUL Granted
Land North Of Grove Farm Vicarage Lane Mettingham Suffolk
A balanced cut and fill earth moving operation to create a clay lined cattle slurry lagoon.
-
DC/25/2180/FUL Granted
Land At Dumb Boy Cottage Shingle Street Hollesley Suffolk
A balanced cut and fill earth moving operation to create an irrigation reservoir.
15 more applications on record
Trade members see everything this firm has filed, filter it by council and outcome, and get an email the day it files again.
See the full track recordFrom council registers and Companies House. Counts describe the records we hold, not a firm's complete history. Request a correction or removal.