Planning application
DC/26/0906/EIA
Field 1 Km North East Of Bentwaters Airbase Orford Road Tunstall Suffolk
Proposal
EIA Screening Opinion - A balanced cut and fill earth moving operation to create an irrigation reservoir for the storage of water from the Butley Marsh Hydrocycle. The water stored will be from the IDB pump which would otherwise be pumped into Butley Creek a tidal saline creek. The hydraulic containment will require a High Density Poly Ethylene (HDPE) membrane as ground investigations across the farm were unable to identify a suitable natural clay resource.
As published by the council, reference DC/26/0906/EIA
Timeline
Dates from the published record
-
6 Mar 2026
Received by East Suffolk
-
27 Mar 2026
Decision issued: EIA Not Required
-
24 Jul 2026
Added to PlanIndex
After the decision
The process from here
The council has decided this application; the published outcome sits in the record above and the decision notice on the council portal carries the detail, including any conditions.
If permission was granted, work must normally begin within three years of the decision. If it was refused, the applicant can appeal within the statutory time limit or submit a revised scheme.
About outline applications
How this application type works
An outline application tests the principle of developing a site before the detail is worked up. Some or all of the particulars, such as appearance, layout, scale, access and landscaping, are held back as reserved matters for later approval. Permission at outline stage does not by itself allow building to start; the reserved matters must be approved first.
Other outline applications
In East Suffolk
-
DC/26/2670/CON Awaiting decision
Joseph Conrad Unit 2 18 - 32 London Road North Lowestoft Suffolk NR32 1BA
Consultation - Use of the furniture by other persons for the purpose of consuming food or drink supplied from, or in connection with relevant use of, the premises e.g. table and chairs
-
DC/26/2669/CON Awaiting decision
CS 115616 / VMO2 72405 / VF 39653 Junction Of Lowestoft Road And Long Road Carlton Colville Suffolk NR33 8SR
Consultation - Removal of the existing 20m monopole, 6 no. antennas, 2 no. equipment cabinets, and installation of a new 20m monopole, 9 no. antennas, 2 no. equipment cabinets and ancillary development thereto.
-
DC/26/2627/CON Awaiting decision
50 The Walk Felixstowe Suffolk IP11 9DA
Consultation - install fixed line broadband electronic communications apparatus
-
DC/26/2623/EIA Awaiting decision
Land North Of Kettleburgh Road Easton And Land South Of The Street Letheringham Suffolk
EIA Screening - For the installation and operation of a solar development and battery energy storage system with associated equipment and necessary infrastructure.
-
DC/26/2590/CON Awaiting decision
Proposed Substation Site At Raydon Hall Farm Raydon Lane Orford Woodbridge Suffolk IP12 2BT
Consultation - Eastern Power Networks plc is proposing to establish an electricity substation at the above location