Hunmanby Grange Cans Dale To The Grange Wold Newton Filey North Yorkshire YO25 3HS

Granted Yorkshire Dales National Park 26/02453/PPV Prior Notif Solar Equip on non-domestic

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

The proposed development comprises the installation of a roof-mounted solar PV and battery storage system to provide on-site renewable energy generation. The solar PV system will consist of 448 panels rated at 595Wp each, providing a total installed capacity of 266.56kWp. The panels will be mounted on the existing buildings using a rail mounting system specifically designed for the roof type, fixed in accordance with manufacturer guidance and relevant British Standards. All associated electrical equipment, including inverters, cabling and protection devices, will be installed to meet current UK regulations and standards. The system is intended to reduce the site's carbon footprint and improve energy self-sufficiency through increased use of on-site renewable energy.

As published by the council, reference 26/02453/PPV

Application record

Reference
26/02453/PPV
Type
Prior Notif Solar Equip on non-domestic
Status
Decided
Decision
Granted As published: Prior approval not required
Received
13 May 2026
Validated
13 May 2026
Decided
24 Jun 2026
Ward
Hunmanby & Sherburn
Parish
Hunmanby (Scarborough)
Decision by
Chief Planner
Postcode
YO25 3HS

Timeline

Dates from the published record

  1. 13 May 2026

    Received by Yorkshire Dales National Park

  2. 24 Jun 2026

    Decision issued: Prior approval not required

  3. 3 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

NerG Ltd Agent, registered in Lincoln

Active · incorporated 2014 · Lincoln

4 applications on PlanIndex · across 4 councils

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Yorkshire Dales National Park granted permission on 24 June 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About this record

The published feed does not state which type of application this is; the register entry on Yorkshire Dales National Park's portal will say. Our guide explains the common types.

Nearby applications

Within 0.3 miles

  • Hunmanby Grange Cans Dale To The Grange Wold Newton Filey North Yorkshire YO25 3HS

    26/02453/PPV Submitted 13 May 2026 50 yards away

    The proposed development comprises the installation of a roof-mounted solar PV and battery storage system to provide on-site renewable energy generation. The solar PV system will consist of 448 panels rated at 595Wp each, providing a total installed capacity of 266.56kWp. The panels will be mounted on the existing buildings using a rail mounting system specifically designed for the roof type, fixed in accordance with manufacturer guidance and relevant British Standards. All associated electrical equipment, including inverters, cabling and protection devices, will be installed to meet current UK regulations and standards. The system is intended to reduce the site's carbon footprint and improve energy self-sufficiency through increased use of on-site renewable energy.

    Granted 6 docs
  • Hunmanby Grange Cans Dale To The Grange Wold Newton Filey North Yorkshire YO25 3HS

    26/02453/PPV Submitted 13 May 2026 50 yards away

    The proposed development comprises the installation of a roof-mounted solar PV and battery storage system to provide on-site renewable energy generation. The solar PV system will consist of 448 panels rated at 595Wp each, providing a total installed capacity of 266.56kWp. The panels will be mounted on the existing buildings using a rail mounting system specifically designed for the roof type, fixed in accordance with manufacturer guidance and relevant British Standards. All associated electrical equipment, including inverters, cabling and protection devices, will be installed to meet current UK regulations and standards. The system is intended to reduce the site's carbon footprint and improve energy self-sufficiency through increased use of on-site renewable energy.

    Granted 6 docs