Planning application
25/02045/DVCMAJ
Greystones Residential Development Stump Cross To Aldborough Boroughbridge North Yorkshire
Proposal
Application to vary conditions 4, 5 and 20 of HGT19/02980/DVCMAJ - (Variation of condition 27 (play area) to allow for revised construction start to play area of planning permission 17/02937/FULMAJ - Erection of 184 no. dwellings with associated landscaping and access - Amended details received - including proposal to increase ground levels across the site.), to incorporate changes to the approved surface water drainage system by removing one swale and replacing it with another in a different location.
As published by the council, reference 25/02045/DVCMAJ
Timeline
Dates from the published record
-
16 Jun 2025
Received by Yorkshire Dales National Park
-
7 Jul 2025
Validated
Checked as complete and ready for consideration.
-
16 Apr 2026
Decision issued: Application Permitted
-
3 Aug 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About conditions applications
How this application type works
This type of application deals with conditions attached to an existing permission, either by supplying the details a condition requires, called discharging it, or by asking to vary or remove one. It does not reopen the principle of the permission itself. Building often cannot lawfully start, or continue past a set stage, until the named conditions are discharged.
Nearby applications
Within 500 metres
-
HGTZC24/02083/AMENDS Granted
Taylor Wimpey Greystones Residential Development Boroughbridge North Yorkshire
Application for non-material amendments to 17/02937/FULMAJ to allow changes to the surface treatment replacing the proposed charcoal block paving with brindle block paving and to remove an area of block paving at the front and rear of the site.
-
25/02045/DVCMAJ Granted
Greystones Residential Development Stump Cross To Aldborough Boroughbridge North Yorkshire
Application to vary conditions 4, 5 and 20 of HGT19/02980/DVCMAJ - (Variation of condition 27 (play area) to allow for revised construction start to play area of planning permission 17/02937/FULMAJ - Erection of 184 no. dwellings with associated landscaping and access - Amended details received - including proposal to increase ground levels across the site.), to incorporate changes to the approved surface water drainage system by removing one swale and replacing it with another in a different location.
-
HGTZC24/02083/AMENDS Granted
Taylor Wimpey Greystones Residential Development Boroughbridge North Yorkshire
Application for non-material amendments to 17/02937/FULMAJ to allow changes to the surface treatment replacing the proposed charcoal block paving with brindle block paving and to remove an area of block paving at the front and rear of the site.
-
25/01537/DISCON Decided
Aldborough Gate Land Off Wetherby Road Boroughbridge YO51 9HT
Approval of details under condition 4 (Surface Water Drainage), 5 (Engineering Drawings) and 20 (Landscaping) of planning permission HGT17/02937/FULMAJ - Erection of 184 no. dwellings with associated landscaping and access - Amended details received - including proposal to increase ground levels across the site.
-
25/01537/DISCON Decided
Aldborough Gate Land Off Wetherby Road Boroughbridge YO51 9HT
Approval of details under condition 4 (Surface Water Drainage), 5 (Engineering Drawings) and 20 (Landscaping) of planning permission HGT17/02937/FULMAJ - Erection of 184 no. dwellings with associated landscaping and access - Amended details received - including proposal to increase ground levels across the site.
-
25/02146/SCOPE Decided
Land Comprising Field At 440067 465867 Stump Cross To Aldborough Boroughbridge North Yorkshire
Environmental Impact Assessment Scoping Opinion for construction of a Health and Leisure Centre, 3 x informal Multi Use Grass Sports Pitches, 2 x Multi Use Game Areas MUGAs, Childrens Play Park, 4 x 100m Sprint Track, Childrens Pump Bike track, 1km Exercise track with associated car parking.
Other conditions applications
In Yorkshire Dales National Park
-
NY/2026/0034/73 Granted
Knapton Landfill Site, Village Street, East Knapton, YO17 8JA
Variation of condition No. 31 of planning permission reference C3/12/00997/CPO to allow for the importation of additional material and the removal of part of the existing waste transfer building and weighbridge
-
26/02727/DVCON Granted
All Saints Church Otley Road Harrogate North Yorkshire
Section 73 application for Variation of Condition No. 2 (detailed drawings) of Planning Permission HGT22/03825/FUL (Change of use of Grade II listed Church to 1 no. dwelling, including external works and erection of detached workshop) to allow for alterations to the approved plans.
-
ZB25/00135/DCN Granted
Former Shorthorn Inn Hornby Road Appleton Wiske North Yorkshire DL6 2AL
Discharge of conditions 3, 4 and 5 to previously approved application ZB25/00135/FUL
-
ZE26/00382/DISCON Decided
Manor Farm Ganton Road Foxholes North Yorkshire YO25 3QH
Discharge of conditions 04, 05, 07, 08, 09 & 13 of approval ZE24/00524/FUL dated 23.12.2024
-
26/02839/DISCON Decided
Beck Farm Cundall To Bat Bridge Cundall North Yorkshire YO61 2RN
Approval of details under Condition 8 (Construction Management Plan) of planning permission ZC24/03831/FUL Demolition of existing rear extension on house and lean-to out building on barn. Erection of two storey rear and side extension, single storey rear and side extensions and detached double carport in rear garden, relocation of vehicular access and installation of boundary wall and gates.