Planning application
York Central Leeman Road York
Works: Trees
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Part Discharge Conditions 18 (Waste Storage), 25 (Tree Protection), 44 (Cycle Hub), 51 (BREEAM), 62 (Noise within Dwellings), 63 (Vibration), 74 (Surface Water Discharge to Holgate Beck) and 77 (Surface Water Drainage) of 18/01884/OUTM relating to RMA5
As published by the council, reference AOD/25/00359
Application record
- Reference
- AOD/25/00359
- Type
- Approval of Details
- Status
- Awaiting decision
- Received
- 1 Dec 2025
- Validated
- 1 Dec 2025
- Ward
- Holgate
- Parish
- Holgate Planning Panel
Site history
Applications at this address on the York register
This site has had 53 applications since 2021: 39 approved, 0 refused.
-
AOD/26/00223 Awaiting decision
York Central Leeman Road York
Condition 33 (self and custom build) of 18/01884/OUTM
-
AOD/26/00140 Awaiting decision
York Central Leeman Road York
Condition 4 (Severus Bridge Details) of 23/01631/REM
-
AOD/26/00141 Awaiting decision
York Central Leeman Road York
Condition 3 (ECML Bridge Detail) of 23/01631/REM
-
AOD/26/00081 Granted
York Central Leeman Road York
Condition 11 of 23/01506/REM
-
26/00308/REM Granted
York Central Leeman Road York
Variation of conditions 1, 7, 9, 12 and 15 of permitted application 23/01506/REM for the removal of access ramp from the north-west embankment; redesign and visual improvement of the north-west embankment following removal of access ramp; reconfiguration of the Network Rail Laydown area; connection to vehicular and pedestrian access from Landings Lane under Water End and Severus Road and foot bridges; provision for unhindered pedestrian access, for authorised personnel, from Millennium Green under the ECML Bridge; a 3m strip of land abutting the base of the north-west embankment for maintenance of the embankment, Severus Footbridge, Severus Road Bridge and the ECML Bridge; and provision for additional trees on the top of the embankment
-
25/02384/REMM Awaiting decision
York Central Leeman Road York
Reserved matters application for layout, scale, appearance, landscaping and access for erection of hotel with ground floor retail/leisure units (use class E) on Plot C4; new Western Station Entrance building, cycle hub and 1063 sq m (GEA) retail/leisure units (use class E) and 345 sq m (GEA) office use (use class E(g)(i and ii)) on Plot C3; 1no. office building (use class E c (i, ii and iii) and/or E g (i and ii) and 555 sq m (GEA) retail/leisure units (use class E) on Plot D; 144 dwellings and 357 sq m (GEA) retail/leisure units (use class E) on Plot E; 508 dwellings and 2985 sq m (GEA) retail/leisure units (use class E) on Plots F3 and F4; 362 dwellings and 1no. retail/leisure unit 430 sq m (GEA) (use class E (a) and/or (b)) on Plots K and L; new central park, public realm including public square at the former Coal Drops, with associated demolition and infrastructure pursuant to outline planning permission 18/01884/OUTM.
-
25/02379/REM Awaiting decision
York Central Leeman Road York
Section 73 application to vary Condition 1 (approved plans), Condition 2 (landscaping) and Condition 6 (parking) of permitted application 23/02255/REMM relating to the Government Hub
-
25/02350/NONMAT Granted
York Central Leeman Road York
Non-material amendment to permitted application 18/01884/OUTM to alter the wording of condition 6 (parameter plans)
-
25/02252/FUL Granted
York Central Leeman Road York
Construction of a new pedestrian and cycle bridge with associated infrastructure following demolition of existing bridge
-
AOD/25/00284 Granted
York Central Leeman Road York
Part Discharge Conditions 80 (Protecting Water Supply) and 81 (Protecting Public Sewers) relating to the Central Hall part of 18/01884/OUTM
Timeline
Dates from the published record
-
1 Dec 2025
Received by York
-
20 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 26 January 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
York took a median of 57 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Agent on file, a planning consultancy registered in London
207 applications on PlanIndex · across 35 councils · 91% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
73 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with York for determination, against a statutory target of eight weeks. Over the last year York decided condition discharge and variation applications in a median of 47 days. More in our guide to how long planning decisions take.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Other condition discharge and variation applications
In York
-
AOD/26/00082 Withdrawn
Axcel Hospitality (York) Limited 36 Piccadilly York YO1 9NX
Condition 5 (External Materials) of 24/01499/FUL
-
AOD/26/00093 Granted
Dean Court Hotel 1 - 6 Duncombe Place York YO1 7EF
Condition 3 (bats) of 22/01053/FUL
-
AOD/26/00089 Granted
The Milner Station Road York YO24 1AY
Condition 3 (materials) of 22/02629/FULM
-
AOD/26/00062 Granted
10 St Marys York YO30 7DD
Condition 3 of 25/02059/FUL
-
AOD/26/00090 Granted
Tang Hall Cp School Sixth Avenue York YO31 0UT
Conditions 3 (Bio-diversity Gain Plan), 4 (Habitat Management and Monitoring Plan), 7 (Detailed method of works/Construction Traffic Managment Plan), 8 (Construction Environmental Management Plan), 9 (Arboricultural Method Statement), and 22 (Remediation Strategy) of of 24/00857/FULM