Planning application
Spark York Piccadilly York
Works: Extension
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Replacement of two existing scaffold staircases with new steel stair structures incorporating intermediate landings and integrated lighting; relocation of existing passenger lift to the rear of the site; rationalisation and improvement of the entrance forecourt including resurfacing, removal of level changes, and replacement of existing double-leaf entrance gate with a single-leaf timber-clad door; extension of existing first-floor decking in two locations to provide additional unexposed external seating, introduction of one lightwell through existing first-floor deck; removal of fixed furniture from existing entrance hall to enable flexible community use; extension of timber cladding to southern site boundary with new access door with associated cosmetic repairs, re-finishing and upgrading of existing guarding and railing systems
As published by the council, reference 26/01909/FUL
Application record
- Reference
- 26/01909/FUL
- Category
- Full applications
- Status
- Awaiting decision
- Validated
- 26 Oct 2026
Site history
Applications at this address on the York register
This site has had 4 applications since 2022: 1 approved, 0 refused.
-
26/00922/FUL Decided
Spark York Piccadilly York
Alterations to existing entrance, replacement steel staircases, relocation of passenger lift to rear of the site, extension of decking to ground and first floors to provide additional seating, erection of canopy structure to first floor, installation of 2no. light wells and extension of timber cladding with new access door
-
AOD/26/00044 Awaiting decision
Spark York Piccadilly York
Conditions 3 and 4 (noise assessment and amplified noise management) of 25/01151/FUL
-
22/00195/FUL Granted
Spark York Piccadilly York
Variation of condition 2 of permitted application 17/00274/FUL to extend duration of permission to 30.09.2025
Timeline
Dates from the published record
-
26 Oct 2026
Validated
Checked as complete and ready for consideration.
-
2 Nov 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 21 December 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
York took a median of 59 days over the applications it decided in the last year.
What happens while it is decided
This application is with York for determination, against a statutory target of eight weeks. Over the last year York decided full applications in a median of 70 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Other full applications
In York
-
26/01884/FUL Awaiting decision
60 Irwin Avenue York YO31 7TU
Single storey rear extension and addition of pitched roof to existing two-storey side extension
-
26/01885/FUL Awaiting decision
104 Jute Road York YO26 5EW
Erection of 1no. dwelling to rear
-
26/01888/FUL Awaiting decision
Poplar Farm Moor End Acaster Malbis York YO23 2UQ
Single storey side extension and alterations to fenestration of porch
-
26/01946/FUL Awaiting decision
Inner Space Stations 339 - 341 Hull Road York YO10 3LE
Installation of a new car wash facility and associated works
-
26/01893/FUL Awaiting decision
21 Leven Road York YO24 2TL
Two storey side and single storey front/rear extensions and removal of existing garage and erection of a new shed.