Planning application
Land At Evesham Road Broadway
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Outline application with all matters reserved for up to 17 dwellings
As published by the council, reference W/24/02531/OUT
Application record
- Reference
- W/24/02531/OUT
- Type
- Outline Application
- Status
- Pending Decision
- Received
- 13 Dec 2024
- Validated
- 19 Dec 2024
- Ward
- Broadway, Sedgeberrow & Childswickham Ward
- Parish
- Childswickham
- Decision by
- Committee
Timeline
Dates from the published record
-
13 Dec 2024
Received by Wychavon
-
19 Dec 2024
Validated
Checked as complete and ready for consideration.
-
23 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 13 February 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Wychavon took a median of 58 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
91 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Wychavon for determination, against a statutory target of eight weeks. Over the last year Wychavon decided outline applications in a median of 64 days. More in our guide to how long planning decisions take.
About outline applications
An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.
Other outline applications
In Wychavon
-
W/26/01799/OL Decided
Land At Os 9797 5525 Alcester Road Kington Flyford Flavell
Upgrading 185m of high voltage overhead line from single phase (2 wire) to three phase (3 wire).
-
W/26/01515/PIP Refused
Sunrise Leasowes Road Offenham WR11 8RQ
Permission in principle for residential development of five additional dwellings and retention of existing agricultural dwelling
-
W/26/02086/SCR Decided
Land At Os 0516 4970 Alcester Road Harvington
Environmental Impact Assessment (EIA) Screening Opinion in relation to Outline application for the development of up to 150 dwellings with all matters reserved except access on land at Evesham Road, Harvington.
-
W/26/01724/OL Decided
Rectory Farm Rectory Lane Upton Warren Bromsgrove B61 7EL
Works to Existing Overhead Electricity Lines - erecting two new H-poles into an existing span of the overhead line. The H-poles facilitate the transition from the underground cable, from the BESS site substation, to connect to the existing overhead electricity wires. Rectory Farm Battery Energy Storage System (“BESS”) Project – W/22/02326/FUL
-
W/26/01639/PIP Refused
Fanday Brandheath Lane New End Astwood Bank Redditch B96 6NG
Permission in Principle for proposed residential development for between 1-5 dwellings