Planning application
36 Montagu Drive Wolverhampton West Midlands WV14 0UY
Works: Extension Windows or glazing Small domestic
Read from the description, not a valuation. How we read the register
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Removal of existing bay window to create hall way/corridor to out building in rear garden. Reusing windows and creating similar building characteristics to minimise the out of place exterior. Using the existing boundary wall for new extension building.
As published by the council, reference 24/01014/FUL
Application record
- Reference
- 24/01014/FUL
- Type
- Full Application
- Status
- Awaiting decision
- Received
- 27 Sep 2024
- Validated
- 7 May 2025
- Ward
- Bilston South
- Postcode
- WV14 0UY
Timeline
Dates from the published record
-
27 Sep 2024
Received by Wolverhampton
-
7 May 2025
Validated
Checked as complete and ready for consideration.
-
24 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 2 July 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Wolverhampton took a median of 51 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
8 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
The process from here
This application is with Wolverhampton for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
23 Broadmoor Road Bilston Wolverhampton West Midlands WV14 0RP
Single storey rear extension
Granted Full applications Extension 6 docsSmall domestic -
-
10 Chaman Lal Gardens Wolverhampton West Midlands WV14 0BB
Rear dormer loft conversion to add additional bedroom with a ensuite
Granted Lawful development Loft or dormer 6 docs -
36 Ambergate Road Wolverhampton West Midlands WV14 0SR
Ground floor rear extension
Granted Full applications Extension 6 docs -
27 Highfields Road Wolverhampton West Midlands WV14 0SD
Proposed B8 Un-heated Storage Unit
Granted Full applications 23 docs -
70, HIGHFIELDS ROAD, COSELEY, BILSTON, WV14 0SF
Lawful development certificate for an existing driveway
Granted Lawful development
Other full applications applications
In Wolverhampton
-
26/00370/FUL Refused
146 Probert Road Wolverhampton West Midlands WV10 6UA
Proposed single storey rear extension, roof alterations and loft conversion
-
26/00951/FUL Awaiting decision
158 Warstones Road Wolverhampton West Midlands WV4 4LH
First floor side extension.
-
25/00406/FUL Granted
Garage Site Behind 6 To 20 Pace Crescent Wolverhampton West Midlands
Five new dwellings.
-
26/00621/FUL Granted
43 Marshall Road Wolverhampton West Midlands WV13 3PB
Single storey side and rear extension with loft conversion and new dormer. (Amended description)
-
26/00956/FUL Awaiting decision
21 Field Head Place Wolverhampton West Midlands WV6 8XE
Replacement of windows