Skip to content
PlanIndex Get alerts
Menu

Planning application

11 Henry Fowler Drive Wolverhampton West Midlands WV6 8TN

Granted Wolverhampton 22/01517/FUL Full Application

Works: Loft or dormer

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Front dormer and roof lights to front gable to form loft conversion

As published by the council, reference 22/01517/FUL

Application record

Reference
22/01517/FUL
Type
Full Application
Status
Decided
Decision
Grant
Received
12 Dec 2022
Validated
17 Jan 2023
Decided
17 Feb 2023
Ward
Tettenhall Regis
Decision by
Delegated Decision
Postcode
WV6 8TN

Timeline

Dates from the published record

  1. 12 Dec 2022

    Received by Wolverhampton

  2. 17 Jan 2023

    Validated

    Checked as complete and ready for consideration.

  3. 17 Feb 2023

    Decision issued: Grant

  4. 24 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, an architecture practice

28 applications on PlanIndex · across 8 councils · 96% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

5 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 27 Birchfield Avenue Wolverhampton West Midlands WV6 8TE

    20/01515/FUL Submitted 15 Dec 2020 53m away

    First floor front extension over garage

    Granted Full applications Extension 6 docs
  • Adas Woodthorne Wergs Road Tettenhall Wolverhampton West Midlands WV6 7LB

    07/00613/FUL Submitted 27 Apr 2007 75m away

    Telecommunications development comprising the installation of 3 antennas 2 dishes and an equipment cabinet

    Granted Full applications 6 docs
  • 23 Birchfield Avenue Wolverhampton West Midlands WV6 8TE

    22/01573/FUL Submitted 3 Jan 2023 81m away

    Front and side 1.5m brick boundary treatment and entrance gates

    Granted Full applications 6 docs
  • 24 Henry Fowler Drive Wolverhampton West Midlands WV6 8TL

    26/00899/TR Submitted 22 Aug 2026 98m away

    86% historically approved · decision due ~17 Oct

    Hornbeam 1 (H1) Reduce the overall crown by approximately 50%, comprising a reduction of up to 4 metres in height and up to 5 metres from the lateral crown spread. Prune back branches extending towards or over neighbouring properties to provide up to approximately 1 metre clearance from the property boundaries, including if this requires a lateral reduction greater than 5 metres. Retain a balanced form where possible given the tree's existing irregular/misgrown form. Remove epicormic growth from the base and lower stems up to approximately 2 metres above ground level. Hornbeam 2 (H2) Remove epicormic growth from the base and lower stem up to approximately 2.5 metres above ground level. Prune back branches on the garage side to provide approximately 1 metre clearance from the building, maintaining the overall form of the tree.

    Awaiting decision Trees
  • 39 Henry Fowler Drive Wolverhampton West Midlands WV6 8TN

    21/00696/CPL Submitted 10 May 2021 99m away

    Widening of existing conservatory extension to include new foundations, cavity wall construction and mono-pitched roof. No-change to existing rainwater or foul drainage connections.

    Granted Lawful development Extension 2 docs
  • 72 Wergs Road Wolverhampton West Midlands WV6 8TH

    21/00424/TR Submitted 5 Mar 2021 100m away

    06/00642/TPO (G1) - False Acacia - Fell. Reason(s): Concerns about the lean and possible damage to garage. N.B. other works referred to on application form do not require permission due to nature of works or tree(s) not being protected.

    Granted Trees 2 docs

In Wolverhampton

  • 26/00370/FUL Refused

    146 Probert Road Wolverhampton West Midlands WV10 6UA

    Proposed single storey rear extension, roof alterations and loft conversion

    14 Apr 2026 Full applications
  • 25/00406/FUL Granted

    Garage Site Behind 6 To 20 Pace Crescent Wolverhampton West Midlands

    Five new dwellings.

    1 Apr 2025 Full applications
  • 26/00621/FUL Granted

    43 Marshall Road Wolverhampton West Midlands WV13 3PB

    Single storey side and rear extension with loft conversion and new dormer. (Amended description)

    4 Jun 2026 Full applications
  • 26/00536/FUL Granted

    24 Springfield Lane Wolverhampton West Midlands WV10 6PX

    Two storey side extension

    14 May 2026 Full applications
  • 26/00740/FUL Granted

    32 Danescourt Road Wolverhampton West Midlands WV6 9BG

    Single storey rear extension

    6 Jul 2026 Full applications