Planning application
Hall Farm Church Lane Arborfield Reading RG2 9HX
Works: New dwelling Demolition
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Hybrid planning application (part in full, part in outline) comprising outline application for: up to 2,800 residential units to include up to 100 custom and self-build plots; 2 primary schools (up to 3 forms of entry) to include early years provision and 1 secondary school (up to 12 forms of entry); one District Centre, to incorporate up to 11,000m2 of Class E (Commercial, Business and Service, to include a food store of around 2,500m2), and Class F (Local Community and Learning); one Local Centre, to incorporate up to 2,400m2 of Class E; a Sports Hub to include sports pitches and pavilion space; up to 4,250m2 of further Class E, Class F, and sui generis development to include commercial, health care and public house; associated green infrastructure, landscaping, public open space, play areas, and ecological enhancement measures; 20 gypsy and traveller pitches; drainage and flood alleviation measures to include Sustainable Urban Drainage Systems (SUDS) and engineering measures within Loddon Valley for the River Loddon; associated highway / transport / supporting infrastructure including spine road, pedestrian and cycle connections; associated utilities, infrastructure, and engineering works, including the undergrounding of overhead lines and an electricity substation; up to 0.5ha of land adjoining St Bartholomewâs Church for use as cemetery. All matters reserved other than access, incorporating: access to highways, incorporating: a new pedestrian, cycle and vehicular access to Lower Earley Way via a new 4th arm to the Meldreth Way roundabout; a new pedestrian, cycle and vehicular bridge over the M4; a new pedestrian, cycle and vehicular bridge over the River Loddon; a new vehicular access to the A327 Reading Road, via a new arm to the Observer Way roundabout; a new pedestrian, cycle and vehicular access to Thames Valley Science Park; Phase 1 of internal roads including pedestrian / cycle routes, associated infrastructure, drainage and landscaping. Application includes full permission for the delivery of proposed 40.4 hectares of Suitable Natural Greenspace (SANG), 18.35 hectares of SANG link, and provision of Biodiversity Net Gain measures, the demolition and clearance of buildings and structures at the Centre for Dairy Research (CEDAR) and at Hall Farm, the demolition of 3 existing dwellings, and the retention of specified buildings at Hall Farm as specified by the applications drawings.
As published by the council, reference 252498
Application record
- Reference
- 252498
- Status
- Valid
- Received
- 14 Oct 2025
- Validated
- 24 Oct 2025
- Ward
- Barkham & Arborfield
- Parish
- Arborfield and Newland
- Postcode
- RG2 9HX
Timeline
Dates from the published record
-
14 Oct 2025
Received by Wokingham
-
24 Oct 2025
Validated
Checked as complete and ready for consideration.
-
27 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 19 December 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Wokingham took a median of 55 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
982 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Wokingham for determination, against a statutory target of eight weeks. Over the last year Wokingham's median decision took 55 days. More in our guide to how long planning decisions take.
About this record
The published feed does not state which type of application this is; the register entry on Wokingham's portal will say. Our guide explains the common types.
Nearby applications
Within 0.3 miles
-
Land At Hall Farm Church Lane Arborfield Reading Wokingham RG2 9HX
61% historically approved · decision due ~29 Dec
Hybrid planning application for up to 2,800 residential units, 2 primary schools and 1 secondary school, new District Centre, new Local Centre and Sports Hub with ancillary development (Application Ref 252498) PLEASE NOTE THE DECISION ON THIS APPLICATION IS MADE BY WOKINGHAM BOROUGH COUNCIL
Awaiting decision Outline 1 doc -
Centre For Dairy Research, Hall Farm Church Lane Arborfield Wokingham RG2 9HX
Application to vary condition 2 of planning consent 152726 for the construction of a new slurry tank and dry cow shed, to allow changes to improve drainage and ventilation, and the removal of condition 4 relating to archaeological work.
Granted Conditions 8 docsSmall domestic -
Hall Farm Church Lane Arborfield Wokingham RG2 9HX
Application for Listed Building consent for internal and external works to building to facilitate change of use from agricultural buildings (sui generis) to residential dwelling (C3) use.
Granted Heritage and listed buildings 17 docsDomestic -
HALL FARM, CHURCH LANE, ARBORFIELD, RG2 9HX (Loddon Garden Village)
Hybrid planning application 252498 (part in full, part in outline) comprising outline application for: up to 2,800 residential units to include up to 100 custom and selfbuild plots; 2 primary schools (up to 3 forms of entry) to include early years provision and 1 secondary school (up to 12 forms of entry); one District Centre, to incorporate up to 11,000m2 of Class E (Commercial, Business and Service, to include a food store of around 2,500m2), and Class F (Local Community and Learning); one Local Centre, to incorporate up to 2,400m2 of Class E; a Sports Hub to include sports pitches and pavilion space; up to 4,250m2 of further Class E, Class F, and sui generis development to include commercial, health care and public house; associated green infrastructure, landscaping, public open space, play areas, and ecological enhancement measures; 20 gypsy and traveller pitches; drainage and flood alleviation measures to include Sustainable Urban Drainage Systems (SUDS) and engineering measures within Loddon Valley for the River Loddon; associated highway / transport / supporting infrastructure including spine road, pedestrian and cycle connections; associated utilities, infrastructure, and engineering works, including the undergrounding of overhead lines and an electricity substation; up to 0.5ha of land adjoining St Bartholomew’s Church for use as cemetery. All matters reserved other than access, incorporating: access to highways, incorporating: a new pedestrian, cycle and vehicular access to Lower Earley Way via a new 4th arm to the Meldreth Way roundabout; a new pedestrian, cycle and vehicular bridge over the M4; a new pedestrian, cycle and vehicular bridge over the River Loddon; a new vehicular access to the A327 Reading Road, via a new arm to the Observer Way roundabout; a new pedestrian, cycle and vehicular access to Thames Valley Science Park; Phase 1 of internal roads including pedestrian / cycle routes, associated infrastructure, drainage and landscaping.
Decided Outline 6 docs -
Hall Farm Church Lane Arborfield RG2 9HX
Full application for the refurbishment and conversion of agricultural building (Sui generis) to residential dwellings (C3) use and associated works for landscaping and parking.
Granted Full applications 18 docs -
Hall Farm Church Lane Arborfield Reading RG2 9HX
Hybrid planning application (part in full, part in outline) comprising outline application for: up to 2,800 residential units to include up to 100 custom and selfbuild plots; 2 primary schools (up to 3 forms of entry) to include early years provision and 1 secondary school (up to 12 forms of entry); one District Centre, to incorporate up to 11,000m2 of Class E (Commercial, Business and Service, to include a food store of around 2,500m2), and Class F (Local Community and Learning); one Local Centre, to incorporate up to 2,400m2 of Class E; a Sports Hub to include sports pitches and pavilion space; up to 4,250m2 of further Class E, Class F, and sui generis development to include commercial, health care and public house; associated green infrastructure, landscaping, public open space, play areas, and ecological enhancement measures; 20 gypsy and traveller pitches; drainage and flood alleviation measures to include Sustainable Urban Drainage Systems (SUDS) and engineering measures within Loddon Valley for the River Loddon; associated highway / transport / supporting infrastructure including spine road, pedestrian and cycle connections; associated utilities, infrastructure, and engineering works, including the undergrounding of overhead lines and an electricity substation; up to 0.5ha of land adjoining St Bartholomews Church for use as cemetery. All matters reserved other than access, incorporating: access to highways, incorporating: a new pedestrian, cycle and vehicular access to Lower Earley Way via a new 4th arm to the Meldreth Way roundabout; a new pedestrian, cycle and vehicular bridge over the M4; a new pedestrian, cycle and vehicular bridge over the River Loddon; a new vehicular access to the A327 Reading Road, via a new arm to the Observer Way roundabout; a new pedestrian, cycle and vehicular access to Thames Valley Science Park; Phase 1 of internal roads including pedestrian / cycle routes, associated infrastructure, drainage and landscaping.
Decided Outline 3 docs