Planning application
Sports Pavilion Brewery Road Horsell Woking Surrey GU21 4NQ
Works: Extension Small domestic
Read from the description, not a valuation. How we read the register
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Erection of a single storey extension to enlarge toilet block.
As published by the council, reference PLAN/2026/0507
Application record
- Reference
- PLAN/2026/0507
- Status
- Pending Consideration
- Validated
- 15 Sep 2026
- Ward
- Horsell
- Parish
- Not Available, if this is a comment please see the Documents Tab
- Decision by
- Not Available, if this is a comment please see the Documents Tab
- Postcode
- GU21 4NQ
Comment by 15 October 2026
The council is taking comments on this application until then. Comments go to Woking through their own planning portal.
Timeline
Dates from the published record
-
15 Sep 2026
Validated
Checked as complete and ready for consideration.
-
24 Sep 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 10 November 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Woking took a median of 56 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
18 documents on file for this application
- NEIGH. NOTIF. - STANDARD - LIST
- WORKSHEET FOR PLANNING APPLICATION
- APPLICATIONFORMREDACTED
- SITE PLAN
- LOCATION PLAN
- PROPOSED ELEVATIONS
- EXISTING ELEVATIONS
- PROPOSED GROUND FLOOR PLAN
- EXISTING ROOF PLAN
- EXISTING GROUND FLOOR PLAN
- ARBORICULTURAL DEVELOPMENT REPORT
- APPENDIX 1 - GUIDANCE FOR TREE PROTECTION MEASURES
- APPENDIX 2 - GUIDANCE FOR WORKING IN ROOT PROTECTION AREAS (RPAS)
- APPENDIX 3 - SPECIAL SURFACE CONSTRUCTIONS WITHIN TREE RPAS
- APPENDIX 4 - KEY
- APPENDIX 5 - CASCADE CHART FOR TREE QUALITY ASSESSMENT
- APPENDIX 6 - REFERENCES
- PROPOSED ROOF PLAN
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Woking for determination, against a statutory target of eight weeks. Over the last year Woking's median decision took 56 days. More in our guide to how long planning decisions take.
About this record
The published feed does not state which type of application this is; the register entry on Woking's portal will say. Our guide explains the common types.
Nearby applications
Within 0.3 miles
-
Woking And Horsell Cricket Club Horsell Moor Horsell Woking Surrey GU21 4NQ
86% historically approved · decision due ~19 Oct
Provision of new Padel court with canopy over and associated floodlights, relocation of cricket nets, replacement of access gates on Arthurs Bridge Road frontage and new pedestrian gate.
Awaiting decision -
Goldsworth Road Industrial Estate Woking Surrey
Removal of condition 6 (additional/mezzanine floors) of Planning Permission PLAN/2025/0745 (Demolition of existing buildings on site. Redevelopment of the site to provide a self storage facility (Class B8) alongside associated access works, car parking, landscaping and other works.) to allow additional floors to be inserted into the building
Granted Conditions Demolition 24 docs -
Goldsworth Road Industrial Estate Woking Surrey
Demolition of existing buildings on site. Redevelopment of the site to provide a self storage facility (Class B8) alongside associated access works, car parking, landscaping and other works.
Granted Full applications Demolition 106 docs -
17 Mabel Street Woking Surrey GU21 6NN
Erection of a single storey rear infill extension.
Granted Householder Extension 13 docsSmall domestic -
17 Mabel Street Woking Surrey GU21 6NN
Retention of single storey rear infill extension to dwelling.
Granted Householder Extension 12 docsSmall domestic -
60 Horsell Moor Horsell Woking Surrey GU21 4NN
Erection of a two storey side and rear extension.
Granted Householder Extension 14 docsDomestic