Skip to content
PlanIndex Get alerts
Menu

Planning application

Beaver Creek Horsell Common Horsell Woking Surrey GU21 4YA

Decided Woking PLAN/2024/0817 General Permitted Development Extensions

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Decided. The decision notice on the council portal carries the outcome in full, including any conditions.

Proposal

Prior notification for a single storey rear extension to extend a maximum depth of 8m, maximum height of 4m and a maximum height of eaves of 2.5m.

As published by the council, reference PLAN/2024/0817

Application record

Reference
PLAN/2024/0817
Type
General Permitted Development Extensions
Status
Decided
Decision
GPD Extension (Conditional)
Received
11 Nov 2024
Validated
11 Nov 2024
Decided
17 Dec 2024
Ward
Horsell
Decision by
Delegated
Postcode
GU21 4YA

Timeline

Dates from the published record

  1. 11 Nov 2024

    Received by Woking

  2. 17 Dec 2024

    Decision issued: GPD Extension (Conditional)

  3. 31 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, registered in London

37 applications on PlanIndex · across 14 councils · 94% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

16 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

After the decision

The process from here

The council has decided this application; the published outcome sits in the record above and the decision notice on the council portal carries the detail, including any conditions.

If permission was granted, work must normally begin within three years of the decision. If it was refused, the applicant can appeal within the statutory time limit or submit a revised scheme.

About prior approval applications

How this application type works

Prior approval applications arise where permitted development rights already grant the principle of the work, such as larger home extensions, changes of use to housing or agricultural buildings. The council may only consider the specific matters set out in the rules, for example transport, flooding or appearance, and in many classes the work may proceed if the council does not respond within the deadline, commonly 56 days.

More on prior approval applications in our guide

Nearby applications

Within 500 metres

  • Shaws Farm Horsell Common Horsell Woking Surrey GU21 4XZ

    PLAN/2026/0496 Submitted 31 Jul 2026 182m away

    86% historically approved · decision due ~25 Sep

    Certificate of Lawful Development (existing use) for the retention of a rear orangery extension to the dwelling.

    Awaiting decision Extension
    Domestic
  • Field 1700 Horsell Common Horsell Woking Surrey

    PLAN/2022/1077 Submitted 9 Dec 2022 210m away

    Change of use of equestrian building to general storage

    Granted Full applications 19 docs
  • Bourne Meadows Horsell Common Horsell Woking Surrey GU21 4YB

    PLAN/2025/0880 Submitted 27 Nov 2025 285m away

    Demolition of existing external boiler shed and erection of single storey rear extension. Replacement rooflights to existing single storey rear projection. Replacement of existing corrugated plastic roof over rear terrace with metal framed glazed canopy, erection of a first-floor rear extension. Partial raising of existing roof ridge and erection of 3no rear roof dormers. Alterations to ground floor rear fenestration.

    Refused Householder Extension Loft or dormer +2 20 docs
    Small domestic

In Woking

  • PLAN/2026/0352 Decided

    6 Lakeside Close St Johns Woking Surrey GU21 8UN

    Prior notification for a single storey rear extension to extend a maximum depth of 4m, maximum height of 4m and a maximum height of eaves of 3m.

    8 May 2026 Prior approval
  • PLAN/2026/0309 Decided

    159 Walton Road Woking Surrey GU21 5DU

    Prior notification for a single storey rear extension to extend a maximum depth of 6m, maximum height of 3.10m and a maximum height of eaves of 3m.

    22 Apr 2026 Prior approval
  • PLAN/2026/0267 Decided

    201 Walton Road Woking Surrey GU21 5DX

    Prior notification for a single storey rear extension to extend a maximum depth of 6m, maximum height of 3.2m and a maximum height of eaves of 3m.

    2 Apr 2026 Prior approval
  • PLAN/2026/0220 Refused

    Runtley Wood Farm Runtley Wood Lane Sutton Green Guildford Surrey

    Prior Approval under Part 6 Class A of the Town and County Planning (General Permitted Development) (England) Order 2015 (as amended) for the erection of two agricultural barns to replace the existing.

    16 Mar 2026 Prior approval
  • PLAN/2026/0082 Decided

    Greystones Berry Lane Worplesdon Guildford Surrey GU3 3PU

    Prior notification for a single storey rear extension to extend a maximum depth of 8m, maximum height of 3.5m and a maximum height of eaves of 3.2m.

    3 Feb 2026 Prior approval