Planning application
Field 1700 Horsell Common Horsell Woking Surrey
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Change of use of equestrian building to general storage
As published by the council, reference PLAN/2022/1077
Application record
- Reference
- PLAN/2022/1077
- Type
- Full Planning Application
- Status
- Decided
- Decision
- Permitted
- Received
- 9 Dec 2022
- Validated
- 9 Dec 2022
- Decided
- 9 Mar 2023
- Ward
- Horsell
- Decision by
- Delegated
Timeline
Dates from the published record
-
9 Dec 2022
Received by Woking
-
9 Mar 2023
Decision issued: Permitted
-
31 Jul 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, a design practice registered in Kingston Upon Thames
38 applications on PlanIndex · across 15 councils · 58% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
19 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Shaws Farm Horsell Common Horsell Woking Surrey GU21 4XZ
86% historically approved · decision due ~25 Sep
Certificate of Lawful Development (existing use) for the retention of a rear orangery extension to the dwelling.
Awaiting decision ExtensionDomestic -
Beaver Creek Horsell Common Horsell Woking Surrey GU21 4YA
Prior notification for a single storey rear extension to extend a maximum depth of 8m, maximum height of 4m and a maximum height of eaves of 2.5m.
Decided Prior approval Extension 16 docsSmall domestic -
Bourne Meadows Horsell Common Horsell Woking Surrey GU21 4YB
Demolition of existing external boiler shed and erection of single storey rear extension. Replacement rooflights to existing single storey rear projection. Replacement of existing corrugated plastic roof over rear terrace with metal framed glazed canopy, erection of a first-floor rear extension. Partial raising of existing roof ridge and erection of 3no rear roof dormers. Alterations to ground floor rear fenestration.
Refused Householder Extension Loft or dormer +2 20 docsSmall domestic
Other full applications applications
In Woking
-
PLAN/2026/0114 Granted
3 Abbot House Onslow Crescent Woking Surrey GU22 7AX
Proposed loft conversion with rear dormer. Insertion of front and side rooflights.
-
PLAN/2026/0167 Granted
St Edward Orthodox Church Cyprians Avenue Cemetery Pales Brookwood Woking Surrey GU24 0BL
Erection of a single storey side extension to accommodate disabled access and lift.
-
PLAN/2026/0163 Granted
Land Adjacent To White Walls Bracken Close Woking Surrey
Erection of a two-storey detached house.
-
PLAN/2025/0917 Granted
Gorse Hill Hook Heath Road Woking Surrey GU22 0QF
Demolition of existing single storey structure and erection of new two-storey hotel accommodation building (Use Class C1), with associated hard and soft landscaping.
-
PLAN/2026/0230 Granted
Land At Pumping Station Bonners Close Westfield Woking Surrey
Erection of 2no 2-bedroom semi-detached dwellings and associated parking and landscaping.