Planning application
Elm Trees Altwood Bailey Maidenhead SL6 4PQ
Works: Loft or dormer
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Hip to gable loft conversion with 1no. rear dormer, 2 no. front rooflights and 2 no. rear rooflights
As published by the council, reference 26/01653/FULL
Application record
- Reference
- 26/01653/FULL
- Type
- Full
- Status
- Awaiting decision
- Received
- 6 Jul 2026
- Validated
- 6 Aug 2026
- Ward
- Boyn Hill
- Parish
- Maidenhead Unparished
- Postcode
- SL6 4PQ
Timeline
Dates from the published record
-
6 Jul 2026
Received by Windsor and Maidenhead
-
6 Aug 2026
Validated
Checked as complete and ready for consideration.
-
24 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 1 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Windsor and Maidenhead took a median of 55 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
13 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
The process from here
This application is with Windsor and Maidenhead for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Elm Trees Altwood Bailey Maidenhead SL6 4PQ
Hip to gable and 1no. rear dormer to facilitate a loft conversion.
Refused Full applications Loft or dormer 9 docs -
The Hollies Altwood Bailey Maidenhead SL6 4PQ
Two storey side extension, single storey rear extension and single storey front extension.
Granted Full applications Extension 7 docsSmall domestic -
Dodbrook Altwood Bailey Maidenhead SL6 4PQ
Replacement and enlargement of existing canopy on front south elevation.
Granted Full applications 6 docs -
Vanwall Residences Vanwall Road Maidenhead SL6 4GH
Application for prior approval for construction of one additional storey to the building to provide 16 additional dwellings.
Granted 19 docs -
Land At Costain House Vanwall Road Maidenhead
71% historically approved · decision due ~13 Aug
Erection of a 5-6 storey building comprising 62 residential dwellings (Use Class C3), together with associated public open space, vehicular parking, and access from Vanwall Road
Awaiting decision Full applications 81 docs -
Costain House Vanwall Business Park Vanwall Road Maidenhead SL6 4UB
Application for prior approval for construction of one additional storey to the building to provide 9 additional dwellings.
Granted 23 docs
Other full applications applications
In Windsor and Maidenhead
-
26/01628/FULL Granted
25 Bannard Road Maidenhead SL6 4NP
Single storey rear extension following the demolition of the existing conservatory.
-
26/01384/FULL Granted
Stoney Vere Farm House Butchers Lane White Waltham Maidenhead SL6 3SD
Single storey side extension
-
26/01674/FULL Granted
50 Welley Road Wraysbury Staines TW19 5DJ
Detached annexe to be used ancillary to the main dwelling.
-
26/01312/FULL Refused
16 Whyteladyes Lane Cookham Maidenhead SL6 9NA
Hip to gable, 1no. front dormer, 1no. rear dormer and alterations to fenestration and relocation of PV panels.
-
26/01379/FULL Granted
Lotus Cottage Holyport Street Holyport Maidenhead SL6 2JR
Part single part two storey part first floor rear/side extension and alterations to fenestration.