Skip to content
PlanIndex Get alerts
Menu

Planning application

Elm Trees Altwood Bailey Maidenhead SL6 4PQ

Refused Windsor and Maidenhead 25/03143/FULL Full

Works: Loft or dormer

Refused. Only the applicant can appeal, within the statutory time limit, and a revised scheme can be submitted instead.

Proposal

Hip to gable and 1no. rear dormer to facilitate a loft conversion.

As published by the council, reference 25/03143/FULL

Application record

Reference
25/03143/FULL
Type
Full
Status
Decided
Decision
Refuse
Received
28 Nov 2025
Validated
16 Dec 2025
Decided
10 Feb 2026
Ward
Boyn Hill
Parish
Maidenhead Unparished
Decision by
Delegated
Postcode
SL6 4PQ

Timeline

Dates from the published record

  1. 28 Nov 2025

    Received by Windsor and Maidenhead

  2. 16 Dec 2025

    Validated

    Checked as complete and ready for consideration.

  3. 10 Feb 2026

    Decision issued: Refuse

  4. 11 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

9 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What refusal means

The process from here

The council refused this application for the reasons set out on the decision notice, which the council portal holds in full. Only the applicant can appeal a refusal; the time limit runs from the decision date and is shorter for householder schemes.

Refusal does not prevent a fresh attempt. Applicants often address the reasons for refusal and resubmit, so a refused scheme is not necessarily the end of proposals for the site.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Elm Trees Altwood Bailey Maidenhead SL6 4PQ

    26/01653/FULL Submitted 6 Jul 2026 0m away

    71% historically approved · decision due ~1 Oct

    Hip to gable loft conversion with 1no. rear dormer, 2 no. front rooflights and 2 no. rear rooflights

    Awaiting decision Full applications Loft or dormer 13 docs
  • The Hollies Altwood Bailey Maidenhead SL6 4PQ

    21/00932/FULL Submitted 24 Mar 2021 40m away

    Two storey side extension, single storey rear extension and single storey front extension.

    Granted Full applications Extension 7 docs
    Small domestic
  • Dodbrook Altwood Bailey Maidenhead SL6 4PQ

    22/01405/FULL Submitted 25 May 2022 119m away

    Replacement and enlargement of existing canopy on front south elevation.

    Granted Full applications 6 docs
  • Vanwall Residences Vanwall Road Maidenhead SL6 4GH

    26/01488/PT20AA Submitted 17 Jun 2026 126m away

    Application for prior approval for construction of one additional storey to the building to provide 16 additional dwellings.

    Granted 19 docs
  • Land At Costain House Vanwall Road Maidenhead

    26/01400/FULL Submitted 8 Jun 2026 129m away

    71% historically approved · decision due ~13 Aug

    Erection of a 5-6 storey building comprising 62 residential dwellings (Use Class C3), together with associated public open space, vehicular parking, and access from Vanwall Road

    Awaiting decision Full applications 81 docs
  • Costain House Vanwall Business Park Vanwall Road Maidenhead SL6 4UB

    26/00639/PT20AA Submitted 10 Mar 2026 129m away

    Application for prior approval for construction of one additional storey to the building to provide 9 additional dwellings.

    Granted 23 docs

In Windsor and Maidenhead

  • 26/01628/FULL Granted

    25 Bannard Road Maidenhead SL6 4NP

    Single storey rear extension following the demolition of the existing conservatory.

    3 Jul 2026 Full applications
  • 26/01384/FULL Granted

    Stoney Vere Farm House Butchers Lane White Waltham Maidenhead SL6 3SD

    Single storey side extension

    4 Jun 2026 Full applications
  • 26/01674/FULL Granted

    50 Welley Road Wraysbury Staines TW19 5DJ

    Detached annexe to be used ancillary to the main dwelling.

    9 Jul 2026 Full applications
  • 26/01312/FULL Refused

    16 Whyteladyes Lane Cookham Maidenhead SL6 9NA

    Hip to gable, 1no. front dormer, 1no. rear dormer and alterations to fenestration and relocation of PV panels.

    27 May 2026 Full applications
  • 26/01379/FULL Granted

    Lotus Cottage Holyport Street Holyport Maidenhead SL6 2JR

    Part single part two storey part first floor rear/side extension and alterations to fenestration.

    4 Jun 2026 Full applications