Planning application
22/02666/CONDIT
The Old Tan House And Tan Home Ferry Road Bray Maidenhead
Proposal
Details required by Condition 5 (Landscaping) of Planning Permission 21/01986 for Replacement front canopy, single storey front/side extension for boiler room and storage, single storey side extension with roof terrace and balustrade, single storey rear extension, extraction ducts, flu, acoustic screen to east elevation, alterations to fenestration, new shed and a single storey side/rear extension with canopy to Tan Home for a storage and recycling plant for the change of use of the existing dwelling to a Cookery School with a library, offices and first floor one bedroom apartment.
As published by the council, reference 22/02666/CONDIT
Timeline
Dates from the published record
-
3 Oct 2022
Received by Windsor and Maidenhead
-
17 Mar 2023
Decision issued: Approve Discharge of Condition
-
27 Jul 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About conditions applications
How this application type works
This type of application deals with conditions attached to an existing permission, either by supplying the details a condition requires, called discharging it, or by asking to vary or remove one. It does not reopen the principle of the permission itself. Building often cannot lawfully start, or continue past a set stage, until the named conditions are discharged.
Nearby applications
Within 500 metres
-
26/01584/TCA Awaiting decision
The Waterside Inn Ferry Road Bray Maidenhead SL6 2AT
(T2) Copper Beech - prune secondary and smaller branches to give up to 1.5m clearance from the houses (Rye Peck and Havelock), including chimney.
-
26/01613/TPO Awaiting decision
The Waterside Inn Ferry Road Bray Maidenhead SL6 2AT
(T1) Willow - crown lift to the height of the main flat roof, which is approximately 40cm above the height of the hanging basket wall brackets; prune to give up to 1.5m clearance over the roof of the building; remove dead branches. (018/1972/TPO).
-
26/00813/CONDIT Granted
Tanners Ferry Road Bray Maidenhead SL6 2AT
Details required by Conditions (2) (obsured glazing) (3) (noise mitigation measures) (5) (parking) (6) (cycle store) (7) (bin storage) of planning permission (25/02934/FULL) for (Partial change of use from residential (Class C3) to residential (Class C3), ancillary offices, workshop and storage (Class E) in connection with the Waterside Inn (Part Retrospective).
-
22/03293/LBC Granted
Linum Cottage Ferry Road Bray Maidenhead SL6 2AT
Consent to retain replacement roof, and replacement rooflights.
-
22/03384/FULL Refused
Four Seasons Ferry Road Bray Maidenhead SL6 2AT
Erection of x1 new detached dwelling with x1 new detached garage and associated landscaping following demolition of existing dwelling and associated outbuildings.
-
22/03375/CONDIT Refused
Tudor House Vicarage Walk Bray Maidenhead SL6 2AE
Details required by condition 4 (WSI) of Planning Permission 22/01490/FULL for single storey extension to the north east elevation, part garage conversion and enlargement of the existing outbuilding with covered area and alterations to fenestration.
Other conditions applications
In Windsor and Maidenhead
-
26/01301/CONDIT Granted
Woolley Firs Cherry Garden Lane Littlewick Green Maidenhead SL6 3LJ
Details required by Condition 2 (Materials) of listed building consent 25/03015/LBC for a Consent to install permeable clay brick paving within the two lean-to areas.
-
26/01832/CONDIT Awaiting decision
Magnolia Cabin Fishery Road Maidenhead SL6 1UP
Details required by Condition 5 (Biodiversity Enhancements) of planning permission 26/01024/FULL for a single storey front extension following demolition of existing front element.
-
26/01360/CONDIT Granted
Land Bounded By Willow Path And The Limes And Windsor Road And Dedworth Road And Oakley Green Road Oakley Green Windsor
Details required by Condition 31 (CEMP) of planning permission 22/01354/OUT for an Outline application for access only to be considered at this stage with all other matters to be reserved for the construction of up to x320 new homes, land for a Special Educational Needs (SEN) school, a multi-functional community building alongside an area of strategic open space including play spaces and orchard planting together with associated landscaping, car parking, footpath/cycle connections and vehicular access on to Dedworth Road, following demolition of existing structures.
-
26/01814/CONDIT Awaiting decision
Land Bounded By Ascot Fire Station Station Hill And West of Hermitage Parade And South of High Street Ascot SL5 7HF
Details required by Condition 8 (Bat mitigation strategy) of planning permission 25/01050/FULL for the Redevelopment of existing site to provide 1,775m2 of commercial and community floorspace (mix of uses within Use Classes E, F1 and F2) and 101 dwellings with associated parking, access, open space, landscaping and other associated works. Provision of new public open space with associated hard and soft landscape works, new pedestrian and cycle paths and children's play area.
-
26/01821/CONDIT Awaiting decision
Old Boundary House And New Boundary House London Road Sunningdale Ascot
Details required by Condition 1 (External Appearance And landscaping); Condition 4 (Surface Water Drainage Scheme); Condition 5 (SuDS Hierarchy); Condition 7 (Tree Protection); Condition 12 (Cycle Parking Details); Condition 13 (Refuse Stoarage And Waste Management); Condition 19 (Biodiversity Enhancements) and Condition 24 (Balcony Screen Details) of planning permission 25/01493/OUT for an outline application for access, layout and scale only to be considered at this stage with all other matters to be reserved for the construction of 26 No. apartments, following demolition of the existing buildings.