Planning application
The Old Tan House And Tan Home Ferry Road Bray Maidenhead
Works: Extension Windows or glazing Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Replacement front canopy, single storey front/side extension for boiler room and storage, single storey side extension with roof terrace and balustrade, single storey rear extension, extraction ducts, flu, acoustic screen to east elevation, alterations to fenestration, new shed and a single storey side/rear extension with canopy to Tan Home for a storage and recycling plant for the change of use of the existing dwelling to a Cookery School with a library, offices and first floor one bedroom apartment.
As published by the council, reference 21/01986/FULL
Application record
- Reference
- 21/01986/FULL
- Type
- Full
- Status
- Decided
- Decision
- Application Permitted
- Received
- 29 Jun 2021
- Validated
- 12 Jul 2021
- Decided
- 8 Feb 2022
- Ward
- Bray
- Parish
- Bray Parish
- Decision by
- Delegated
Timeline
Dates from the published record
-
29 Jun 2021
Received by Windsor and Maidenhead
-
12 Jul 2021
Validated
Checked as complete and ready for consideration.
-
8 Feb 2022
Decision issued: Application Permitted
-
3 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
39 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
The Old Tan House And Tan Home Ferry Road Bray Maidenhead
Details required by Condition 5 (Landscaping) of Planning Permission 21/01986 for Replacement front canopy, single storey front/side extension for boiler room and storage, single storey side extension with roof terrace and balustrade, single storey rear extension, extraction ducts, flu, acoustic screen to east elevation, alterations to fenestration, new shed and a single storey side/rear extension with canopy to Tan Home for a storage and recycling plant for the change of use of the existing dwelling to a Cookery School with a library, offices and first floor one bedroom apartment.
Granted Conditions Extension Windows or glazing 17 docsSmall domestic -
The Waterside Inn Ferry Road Bray Maidenhead SL6 2AT
(T2) Copper Beech - prune secondary and smaller branches to give up to 1.5m clearance from the houses (Rye Peck and Havelock), including chimney.
Granted Trees 7 docs -
The Waterside Inn Ferry Road Bray Maidenhead SL6 2AT
(T1) Willow - crown lift to the height of the main flat roof, which is approximately 40cm above the height of the hanging basket wall brackets; prune to give up to 1.5m clearance over the roof of the building; remove dead branches. (018/1972/TPO).
Granted Trees 7 docs -
Rivermere House Ferry Road Bray Maidenhead SL6 2AT
Single storey side extension, first floor front/side extension with undercroft and balcony, x2 first floor rear extensions with balcony above, enlargement of x2 rear dormers to allow insertion of doors and alterations to fenestration following demolition of existing element.
Refused Full applications Extension Loft or dormer +2 12 docsSmall domestic -
Tanners Ferry Road Bray Maidenhead SL6 2AT
Partial change of use from residential (Class C3) to residential (Class C3), ancillary offices, workshop and storage (Class E) in connection with the Waterside Inn (Part Retrospective).
Granted Full applications 17 docs -
Tanners Ferry Road Bray Maidenhead SL6 2AT
Details required by Conditions (2) (obsured glazing) (3) (noise mitigation measures) (5) (parking) (6) (cycle store) (7) (bin storage) of planning permission (25/02934/FULL) for (Partial change of use from residential (Class C3) to residential (Class C3), ancillary offices, workshop and storage (Class E) in connection with the Waterside Inn (Part Retrospective).
Granted Conditions Windows or glazing 9 docs
Other full applications applications
In Windsor and Maidenhead
-
26/01628/FULL Granted
25 Bannard Road Maidenhead SL6 4NP
Single storey rear extension following the demolition of the existing conservatory.
-
26/01384/FULL Granted
Stoney Vere Farm House Butchers Lane White Waltham Maidenhead SL6 3SD
Single storey side extension
-
26/01674/FULL Granted
50 Welley Road Wraysbury Staines TW19 5DJ
Detached annexe to be used ancillary to the main dwelling.
-
26/01312/FULL Refused
16 Whyteladyes Lane Cookham Maidenhead SL6 9NA
Hip to gable, 1no. front dormer, 1no. rear dormer and alterations to fenestration and relocation of PV panels.
-
26/01379/FULL Granted
Lotus Cottage Holyport Street Holyport Maidenhead SL6 2JR
Part single part two storey part first floor rear/side extension and alterations to fenestration.