Planning application
Legoland Windsor Resort Winkfield Road Windsor SL4 4AY
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Construction of a new building with associated works and infrastructure to create an indoor attraction - development to dovetail with planning permission 17/01878/OUT.
As published by the council, reference 22/01593/FULL
Application record
- Reference
- 22/01593/FULL
- Type
- Full
- Status
- Decided
- Decision
- Granted As published: Application Permitted
- Received
- 10 Jun 2022
- Validated
- 20 Jun 2022
- Decided
- 15 Feb 2023
- Ward
- Clewer And Dedworth East
- Parish
- Windsor Unparished
- Decision by
- Committee
- Postcode
- SL4 4AY
Site history
Applications at this address on the Windsor and Maidenhead register
This site has had 37 applications since 2020: 35 approved, 0 refused.
-
26/01718/TPO Granted
Legoland Windsor Resort Winkfield Road Windsor SL4 4AY
(T1) T001 - Willow - Re pollard to previous points by removal of up to 5m in branch length. (040/2016/TPO)
-
26/01717/TPO Withdrawn
Legoland Windsor Resort Winkfield Road Windsor SL4 4AY
(T1) T001 - Poplar - Fell. (T2) T002 - Oak - Remove 2 x dead limbs back to trunk, growing towards neighbouring property (003/1961/TPO).
-
26/01050/CPD Granted
Legoland Windsor Resort Winkfield Road Windsor SL4 4AY
Certificate of lawfulness to determine whether the proposed installation of plant and machinery in the form of a coaster ride with ancillary elements including operators cabin, loading platform and perimeter fencing is lawful.
-
26/00887/TPO Granted
Legoland Windsor Resort Winkfield Road Windsor SL4 4AY
Refer to tree report. (003/1963/TPO)
-
26/00362/DEM Granted
Legoland Windsor Resort Winkfield Road Windsor SL4 4AY
Prior notification for the demolition of the Viking River Splash Ride and associated buildings and structures.
-
25/03138/TPO Granted
Legoland Windsor Resort Winkfield Road Windsor SL4 4AY
(G1) 2 no. Cherry trees - Fell as close to ground level as possible. (T2) Hornbeam - Prune secondary and smaller branches to give up to 1.5m clearance to the barn, including over its roof. (T3) Sweet chestnut - Crown lift to provide 2.5m clearance over ride and 1m over roof. (003/1963/TPO)
-
24/02200/CONDIT Granted
Legoland Windsor Resort Winkfield Road Windsor SL4 4AY
Details required by Condition 24 (partial discharge) (BREEAM in relation to Holiday Village 1) of planning permission 17/01878/OUT for a Hybrid planning application seeking permission for the following Full (detailed) projects: Project 1 - the erection of 65 permanent semi-detached lodges (130 units) and 20 'barrels' with associated amenity facilities block to provide visitor accommodation, a central facilities 'hub' building, SUDS ponds, landscaping works (including equipped play areas) and associated infrastructure works ('Phase 1' of the holiday village); Project 2 - Reconfiguration of car parking and internal accesses and associated engineering/infrastructure works; Project 3 - Change of use of existing farm buildings from agricultural/'sui generis' use to Use Class D2, ancillary 'back of house'; accommodation and land for re-use by the theme park and the creation of one new access point from the existing car park and Project 4 - Extension and alterations to 'The Beginning' comprising new admissions building, extension to existing toilet facilities and new entrance portal. Permission for the following Outline projects: Project 5 - Construction of the '2019 attraction' comprising three 'attraction zones' for up to three new rides (one to be an indoor attraction and the other two to be uncovered or covered) with associated queue line areas, landscaping works and associated infrastructure; Project 6 - Construction of a new indoor ride on the 'Haunted House' site with associated queue line area, landscaping works and associated infrastructure; Project 7 - Extension to the existing 'Big Shop' LEGO store in 'The Beginning' area; Project 8 - Erection of up to 300 units of visitor accommodation ('Phases 2 and 3' of the holiday village) with two associated central facilities 'hub' buildings, SUDS ponds, landscaping, infrastructure works and car parking area.
-
24/01632/TPO Granted
Legoland Windsor Resort Winkfield Road Windsor SL4 4AY
Please see tree report and spreadsheet. (003/1963/TPO)
-
24/00891/FULL Granted
Legoland Windsor Resort Winkfield Road Windsor SL4 4AY
Upgrading of the arrival area, "The Beginning" at Windsor Resort, including external alterations to buildings, replacement and additional structures, landscaping and provision of associated infrastructure.
-
23/02320/CONDIT Granted
Legoland Windsor Resort Winkfield Road Windsor SL4 4AY
Details required by Conditions 4 (archaeology) and 6 (external lighting) of planning permission 22/01593/FULL for the construction of a new building with associated works and infrastructure to create an indoor attraction - development to dovetail with planning permission 17/01878/OUT.
Timeline
Dates from the published record
-
10 Jun 2022
Received by Windsor and Maidenhead
-
20 Jun 2022
Validated
Checked as complete and ready for consideration.
-
15 Feb 2023
Decision issued: Application Permitted
-
4 Aug 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
2 later applications on the register refer to this one:
-
23/02320/CONDIT Granted
Legoland Windsor Resort Winkfield Road Windsor SL4 4AY
Details required by Conditions 4 (archaeology) and 6 (external lighting) of planning permission 22/01593/FULL for the construction of a new building with associated works and infrastructure to create an indoor attraction - development to dovetail with planning permission 17/01878/OUT.
-
23/00925/CONDIT Granted
Legoland Windsor Resort Winkfield Road Windsor SL4 4AY
Details required by Condition 3 (Drainage) of planning permission 22/01593/FULL for the Construction of a new building with associated works and infrastructure to create an indoor attraction - development to dovetail with planning permission 17/01878/OUT.
Documents
Plans, drawings, consultee responses and the officer's report
53 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Windsor and Maidenhead granted permission on 15 February 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Legoland Windsor Resort Winkfield Road Windsor SL4 4AY
Details required by Conditions 4 (archaeology) and 6 (external lighting) of planning permission 22/01593/FULL for the construction of a new building with associated works and infrastructure to create an indoor attraction - development to dovetail with planning permission 17/01878/OUT.
Granted Conditions 8 docs -
Legoland Windsor Resort Winkfield Road Windsor SL4 4AY
Details required by Condition 3 (Drainage) of planning permission 22/01593/FULL for the Construction of a new building with associated works and infrastructure to create an indoor attraction - development to dovetail with planning permission 17/01878/OUT.
Granted Conditions 22 docs -
Legoland Windsor Resort Winkfield Road Windsor SL4 4AY
Upgrading of the arrival area, "The Beginning" at Windsor Resort, including external alterations to buildings, replacement and additional structures, landscaping and provision of associated infrastructure.
Granted Full applications 44 docs -
Legoland Winkfield Road Windsor
70% historically approved · decision due ~4 Feb
Erection of new building and associated works including infrastructure and landscaping following demolition of existing structures (Imagination Theatre).
Awaiting decision Full applications Demolition 50 docs -
Car Park Legoland Windsor Resort Winkfield Road Windsor SL4 4AY
G3 - x2 Oak - Prune to give up to 5.3m clearance directly over the internal access road and up to 2.5m clearance over the path (TPO 40 of 2016)
Granted Trees 7 docs -
Legoland Windsor Resort Winkfield Road Windsor SL4 4AY
Discharge of planning obligation (Travel Plan - Clause 2.1-2.2) in regards to planning application 17/01878/OUT for hybrid planning application seeking permission for the following Full (detailed) projects: Project 1 - the erection of 65 permanent semi-detached lodges (130 units) and 20 'barrels' with associated amenity facilities block to provide visitor accommodation, a central facilities 'hub' building, SUDS ponds, landscaping works (including equipped play areas) and associated infrastructure works ('Phase 1' of the holiday village); Project 2 - Reconfiguration of car parking and internal accesses and associated engineering/infrastructure works; Project 3 - Change of use of existing farm buildings from agricultural/'sui generis' use to Use Class D2, ancillary 'back of house'; accommodation and land for re-use by the theme park and the creation of one new access point from the existing car park and Project 4 - Extension and alterations to 'The Beginning' comprising new admissions building, extension to existing toilet facilities and new entrance portal. Permission for the following Outline projects: Project 5 - Construction of the '2019 attraction' comprising three 'attraction zones' for up to three new rides (one to be an indoor attraction and the other two to be uncovered or covered) with associated queue line areas, landscaping works and associated infrastructure; Project 6 - Construction of a new indoor ride on the 'Haunted House' site with associated queue line area, landscaping works and associated infrastructure; Project 7 - Extension to the existing 'Big Shop' LEGO store in 'The Beginning' area; Project 8 - Erection of up to 300 units of visitor accommodation ('Phases 2 and 3' of the holiday village) with two associated central facilities 'hub' buildings, SUDS ponds, landscaping, infrastructure works and car parking area.
Granted Conditions Extension 7 docsMajor scheme
Other full applications
In Windsor and Maidenhead
-
26/02029/FULL Granted
5 Kimber Close Windsor SL4 4BJ
Single storey rear extension.
-
26/01955/FULL Granted
2 Holmlea Road Datchet Slough SL3 9HQ
Change of use from a dwellinghouse (Use Class C3) to a children's home (Use Class C2) for up to three children, together with conversion of the garage to an office with an en-suite facilities and alterations to fenestration.
-
26/01121/FULL Granted
Zain House 15 Wilton Crescent Windsor SL4 4YJ
Single storey side/front extension, first floor extension over existing side element with 1no. Juliet balcony and 1no. Juliet balcony to existing rear elevation.
-
26/01977/FULL Granted
9 St Marks Place Windsor SL4 3BG
Garage conversion and alterations to fenestration.
-
26/01804/FULL Granted
16 Devereux Road Windsor SL4 1JJ
Installation of air conditioning compressor unit to the first floor side elevation.