Withdrawn before a decision, so it carries no planning weight. A revised scheme can be submitted at any time.
Proposal
(T1) T001 - Poplar - Fell. (T2) T002 - Oak - Remove 2 x dead limbs back to trunk, growing towards neighbouring property (003/1961/TPO).
As published by the council, reference 26/01717/TPO
Application record
- Reference
- 26/01717/TPO
- Type
- Works To Trees Covered by TPO
- Status
- Decided
- Decision
- Withdrawn As published: Application Withdrawn
- Received
- 14 Jul 2026
- Validated
- 5 Aug 2026
- Decided
- 1 Sep 2026
- Ward
- Clewer And Dedworth East
- Parish
- Windsor Unparished
- Postcode
- SL4 4AY
Site history
Applications at this address on the Windsor and Maidenhead register
This site has had 37 applications since 2020: 35 approved, 0 refused.
-
26/01718/TPO Granted
Legoland Windsor Resort Winkfield Road Windsor SL4 4AY
(T1) T001 - Willow - Re pollard to previous points by removal of up to 5m in branch length. (040/2016/TPO)
-
26/01050/CPD Granted
Legoland Windsor Resort Winkfield Road Windsor SL4 4AY
Certificate of lawfulness to determine whether the proposed installation of plant and machinery in the form of a coaster ride with ancillary elements including operators cabin, loading platform and perimeter fencing is lawful.
-
26/00887/TPO Granted
Legoland Windsor Resort Winkfield Road Windsor SL4 4AY
Refer to tree report. (003/1963/TPO)
-
26/00362/DEM Granted
Legoland Windsor Resort Winkfield Road Windsor SL4 4AY
Prior notification for the demolition of the Viking River Splash Ride and associated buildings and structures.
-
25/03138/TPO Granted
Legoland Windsor Resort Winkfield Road Windsor SL4 4AY
(G1) 2 no. Cherry trees - Fell as close to ground level as possible. (T2) Hornbeam - Prune secondary and smaller branches to give up to 1.5m clearance to the barn, including over its roof. (T3) Sweet chestnut - Crown lift to provide 2.5m clearance over ride and 1m over roof. (003/1963/TPO)
-
24/02200/CONDIT Granted
Legoland Windsor Resort Winkfield Road Windsor SL4 4AY
Details required by Condition 24 (partial discharge) (BREEAM in relation to Holiday Village 1) of planning permission 17/01878/OUT for a Hybrid planning application seeking permission for the following Full (detailed) projects: Project 1 - the erection of 65 permanent semi-detached lodges (130 units) and 20 'barrels' with associated amenity facilities block to provide visitor accommodation, a central facilities 'hub' building, SUDS ponds, landscaping works (including equipped play areas) and associated infrastructure works ('Phase 1' of the holiday village); Project 2 - Reconfiguration of car parking and internal accesses and associated engineering/infrastructure works; Project 3 - Change of use of existing farm buildings from agricultural/'sui generis' use to Use Class D2, ancillary 'back of house'; accommodation and land for re-use by the theme park and the creation of one new access point from the existing car park and Project 4 - Extension and alterations to 'The Beginning' comprising new admissions building, extension to existing toilet facilities and new entrance portal. Permission for the following Outline projects: Project 5 - Construction of the '2019 attraction' comprising three 'attraction zones' for up to three new rides (one to be an indoor attraction and the other two to be uncovered or covered) with associated queue line areas, landscaping works and associated infrastructure; Project 6 - Construction of a new indoor ride on the 'Haunted House' site with associated queue line area, landscaping works and associated infrastructure; Project 7 - Extension to the existing 'Big Shop' LEGO store in 'The Beginning' area; Project 8 - Erection of up to 300 units of visitor accommodation ('Phases 2 and 3' of the holiday village) with two associated central facilities 'hub' buildings, SUDS ponds, landscaping, infrastructure works and car parking area.
-
24/01632/TPO Granted
Legoland Windsor Resort Winkfield Road Windsor SL4 4AY
Please see tree report and spreadsheet. (003/1963/TPO)
-
24/00891/FULL Granted
Legoland Windsor Resort Winkfield Road Windsor SL4 4AY
Upgrading of the arrival area, "The Beginning" at Windsor Resort, including external alterations to buildings, replacement and additional structures, landscaping and provision of associated infrastructure.
-
23/02320/CONDIT Granted
Legoland Windsor Resort Winkfield Road Windsor SL4 4AY
Details required by Conditions 4 (archaeology) and 6 (external lighting) of planning permission 22/01593/FULL for the construction of a new building with associated works and infrastructure to create an indoor attraction - development to dovetail with planning permission 17/01878/OUT.
-
23/01927/CONDIT Granted
Legoland Windsor Resort Winkfield Road Windsor SL4 4AY
Details required by Condition 7, part discharge (Materials) and Condition 8, part discharge (Construction Environmental Management Plan) of planning permission 17/01878/OUT for a Hybrid planning application seeking permission for the following Full (detailed) projects: Project 1 - the erection of 65 permanent semi-detached lodges (130 units) and 20 'barrels' with associated amenity facilities block to provide visitor accommodation, a central facilities 'hub' building, SUDS ponds, landscaping works (including equipped play areas) and associated infrastructure works ('Phase 1' of the holiday village); Project 2 - Reconfiguration of car parking and internal accesses and associated engineering/infrastructure works; Project 3 - Change of use of existing farm buildings from agricultural/'sui generis' use to Use Class D2, ancillary 'back of house'; accommodation and land for re-use by the theme park and the creation of one new access point from the existing car park and Project 4 - Extension and alterations to 'The Beginning' comprising new admissions building, extension to existing toilet facilities and new entrance portal. Permission for the following Outline projects: Project 5 - Construction of the '2019 attraction' comprising three 'attraction zones' for up to three new rides (one to be an indoor attraction and the other two to be uncovered or covered) with associated queue line areas, landscaping works and associated infrastructure; Project 6 - Construction of a new indoor ride on the 'Haunted House' site with associated queue line area, landscaping works and associated infrastructure; Project 7 - Extension to the existing 'Big Shop' LEGO store in 'The Beginning' area; Project 8 - Erection of up to 300 units of visitor accommodation ('Phases 2 and 3' of the holiday village) with two associated central facilities 'hub' buildings, SUDS ponds, landscaping, infrastructure works and car parking area.
Timeline
Dates from the published record
-
14 Jul 2026
Received by Windsor and Maidenhead
-
5 Aug 2026
Validated
Checked as complete and ready for consideration.
-
24 Aug 2026
Added to PlanIndex
-
1 Sep 2026
Decision issued: Application Withdrawn
Documents
Plans, drawings, consultee responses and the officer's report
8 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat withdrawal means
The applicant withdrew this application before Windsor and Maidenhead decided it, and is free to submit a revised scheme at any time. More in our guide to what happens after a planning decision.
About tree works applications
Applications for works to trees cover protected trees: consent under a tree preservation order, or six weeks notice for trees in a conservation area. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
-
Legoland Windsor Resort Winkfield Road Windsor SL4 4AY
See Tree Condition Assessment (as amended via email exchange on 5.10.2020)
Granted Trees 8 docs -
Legoland Winkfield Road Ascot SL4 4AY
Consultation from the Royal Borough of Windsor and Maidenhead for the following proposal: Scoping opinion for an Environmental Impact Assessment for the following development at Legoland, Windsor: 1. New Visitor Accommodation 2. Reconfiguration of car park and internal access 3. Change of use of existing farm buildings 4. New/replacement rides and visitor attractions
Decided Outline 2 docs -
Legoland Windsor Winkfield Road Windsor Berkshire SL4 4AY
Development of a new ride to replace the existing Loki's Labyrinth attraction, including erection of new building, entrance portal, courtyard, temple and associated queue line, infrastructure and landscaping.
Decided 1 doc -
Legoland Windsor Resort Hotel Winkfield Road Windsor Berkshire SL4 4AY
Construction of a holiday village and alterations to parking.
Withdrawn -
Legoland Windsor Resort Winkfield Road Windsor Berkshire SL4 4AY
Hybrid planning application seeking permission for the following Full (detailed) projects: Project 1 - the erection of 65 permanent semi-detached lodges (130 units) and 20 'barrels' with associated amenity facilities block to provide visitor accommodation, a central facilities 'hub' building, SUDS ponds, landscaping works (including equipped play areas) and associated infrastructure works ('Phase 1' of the holiday village); Project 2 - Reconfiguration of car parking and internal accesses and associated engineering/infrastructure works; Project 3 - Change of use of existing farm buildings from agricultural/'sui generis' use to Use Class D2, ancillary 'back of house'; accommodation and land for re-use by the theme park and the creation of one new access point from the existing car park and Project 4 - Extension and alterations to 'The Beginning' comprising new admissions building, extension to existing toilet facilities and new entrance portal. Permission for the following Outline projects: Project 5 - Construction of the '2019 attraction' comprising three 'attraction zones' for up to three new rides (one to be an indoor attraction and the other two to be uncovered or covered) with associated queue line areas, landscaping works and associated infrastructure; Project 6 - Construction of a new indoor ride on the 'Haunted House' site with associated queue line area, landscaping works and associated infrastructure; Project 7 - Extension to the existing 'Big Shop' LEGO store in 'The Beginning' area; Project 8 - Erection of up to 300 units of visitor accommodation ('Phases 2 and 3' of the holiday village) with two associated central facilities 'hub' buildings, SUDS ponds, landscaping, infrastructure works and car parking area.
Decided Extension 103 docsMajor scheme
Other tree works applications
In Windsor and Maidenhead
-
26/02457/TPO Awaiting decision
Chadwicke House Sunning Avenue Sunningdale Ascot SL5 9PW
(T1) Beech - selectively reduce the northern side of the crown by up to 2m, reducing the crown spread in this area from approximately 15m to 13m, reduction will target the longest sections of the crown, pruning back to suitable growth points and crown lift to approximately 5m above ground level. (033/2005/TPO).
-
26/01945/TCA Granted
Chandlers Pinkneys Drive Maidenhead SL6 6QD
(T1) Spruce - Fell.
-
26/01392/TCA Granted
3 Camden Road Maidenhead SL6 6HA
T1 Cherry - prune to give 5.3m clearance directly over the road, 2.5m clearance over the pavement, prune to give up to 1m clearance to the front elevation of the house, and to provide up to 0.3m clearance to the overhead telephone wires removing secondary branches and smaller growth only; and crown lift to 2.5m above ground level, T2, T3 and T4 - Leyland cypress hedge - fell, T5 - Willow - fell and T6 - Whitebeam - fell.
-
26/02215/TCA Granted
20 King Stable Street Eton Windsor SL4 6AB
Magnolia grandiflora - fell.
-
26/02448/TPO Awaiting decision
Green Shadows Hancocks Mount Ascot SL5 9PQ
(T2) - Sweet Chestnut - Reduce two branches, branch A by 2.5m and branch B by 3m, overhanging the roof and chimney and to a distance of 1m from the house, leaving a final height of 17m and width perpendicular to the house from 15m to 12m. (003/1990/TPO).