Planning application
Land To The West of The Briary And East of The Eton Wick Road Chapel And Lychgate Eton Wick Road Eton Windsor
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Consent for the alterations and re-building of wall to the west of the Briary and east of the Eton Wick Road Chapel and Lychgate including relocation of the postbox in connection with proposed new boarding house development at Briary End, Briary Cottage and The Briary.
As published by the council, reference 21/03514/LBC
Application record
- Reference
- 21/03514/LBC
- Type
- Listed Building Consent
- Status
- Decided
- Decision
- Granted As published: Application Permitted
- Received
- 26 Nov 2021
- Validated
- 9 Dec 2021
- Decided
- 5 Aug 2022
- Ward
- Eton And Castle
- Parish
- Eton Town Council
- Decision by
- Delegated
Timeline
Dates from the published record
-
26 Nov 2021
Received by Windsor and Maidenhead
-
9 Dec 2021
Validated
Checked as complete and ready for consideration.
-
5 Aug 2022
Decision issued: Application Permitted
-
16 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
37 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Windsor and Maidenhead granted permission on 5 August 2022, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About heritage and listed building applications
Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
The Briary And Briary End And Briary Cottage And Cotton Hall House And Eton Wick Chapel Eton Wick Road Eton Windsor
The redevelopment of the site comprising of the erection of a Boarding House containing 55 bedrooms (Class C2) including staff accommodation, car parking and associated facilities to be linked to the existing building (The Briary). Single storey side/rear extension, single storey infill extension and alterations toThe Briary following demolition of the existing two cottages (Briary End and Briary Cottage) and associated outbuildings. Erection of a new garage and wall linked to the Boarding House and relocation of the gates within the curtilage of Cotton Hall and works to the wall enclosing the Chapel and Lychgate and resiting of a post box. Relocation of the existing vehicular access, new loading bay and associated highways works to Eton Wick Road and associated hard and soft landscaping.
Granted Full applications Extension Demolition 181 docsSmall domestic -
The Briary And Briary End And Briary Cottage And Cotton Hall House And Eton Wick Chapel Eton Wick Road Eton Windsor
Details required by Condition 2 (Building recording) and 15 (non-native species method statement) of planning permission 21/03536/FULL for the redevelopment of the site comprising of the erection of a Boarding House containing 55 bedrooms (Class C2) including staff accommodation, car parking and associated facilities to be linked to the existing building (The Briary). Single storey side/rear extension, single storey infill extension and alterations toThe Briary following demolition of the existing two cottages (Briary End and Briary Cottage) and associated outbuildings. Erection of a new garage and wall linked to the Boarding House and relocation of the gates within the curtilage of Cotton Hall and works to the wall enclosing the Chapel and Lychgate and resiting of a post box. Relocation of the existing vehicular access, new loading bay and associated highways works to Eton Wick Road and associated hard and soft landscaping.
Granted Conditions Extension Demolition 11 docsSmall domestic -
The Briary And Briary End And Briary Cottage And Cotton Hall House And Eton Wick Chapel Eton Wick Road Eton Windsor
Certificate of lawfulness to determine whether planning permission 21/03536/FULL has lawfully commenced/implemented.
Granted Lawful development 8 docs -
The Briary And Briary End And Briary Cottage Eton Wick Road Eton Windsor
(T1) (07G4) Conifer - remove layered limb due to limb failure at 2m.
Granted Trees 7 docs -
Briary Cottage Eton Wick Road Eton Windsor SL4 6ET
(06K7) Yew - cut back crown from building extremities at Briary Cottage to give a final distance from tips of up to 2.5m.
Granted Trees 5 docs -
Burnham Thorpe Eton Wick Road Eton Windsor SL4 6ET
04KC - Beech - Selective tip reduction of up to 3m laterally on the NNE / NE side of crown and crown lift up to 3m from ground level.
Granted Trees 5 docs
Other heritage and listed building applications
In Windsor and Maidenhead
-
26/01323/LBC Withdrawn
De Vere Beaumont Estate Burfield Road Old Windsor Windsor SL4 2JJ
Consent for 8 no. EV Chargers in existing hotel car park
-
26/01425/LBC Granted
Harte And Garter Hotel High Street Windsor SL4 1PQ
Consent for internal works including demolition works, new subdivisions, installation of secondary glazing, installation of new services, removal of redundant plant equipment, installation of new plant equipment, new service lift, to facilitate the creation of additional bedrooms.
-
26/01909/LBC Withdrawn
60 Grove Road Windsor SL4 1HS
Consent for a replacement outbuilding ancillary to the main dwelling.
-
26/02393/LBC Awaiting decision
Flat 1 Hodgson House Eton College Slough Road Eton Windsor SL4 6DE
Consent for a wall mounted Electric Vehicle Charger.
-
26/01697/LBC Granted
Bisham Abbey Bisham Village Marlow Road Bisham Marlow SL7 1RR
Consent for roof repairs including renewal of the lead coverings to Roofs O1, O2 and O3, replacement of the modern Roof M with a new lead roof, localised repairs to other lead and felt roofs, and replacement of defective clay roof tiles. Localised repairs to masonry, windows, joinery, rainwater goods and soil pipes. Replacement of the external fire escape stair and installation of new roof access hatches and permanent mansafe systems to facilitate future inspection and maintenance.