Planning application
Costa Coffee Unit 56 Windsor Royal Station Jubilee Arch Windsor SL4 1PJ
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
To create a kitchen by erecting a partition, front and back bar counter, erection of a boundary wall outside and signage.
As published by the council, reference 21/00999/FULL
Application record
- Reference
- 21/00999/FULL
- Type
- Full
- Status
- Decided
- Decision
- Application Permitted
- Received
- 31 Mar 2021
- Validated
- 30 Apr 2021
- Decided
- 24 Jun 2021
- Ward
- Eton And Castle
- Parish
- Windsor Unparished
- Decision by
- Delegated
- Postcode
- SL4 1PJ
Site history
Applications at this address on the Windsor and Maidenhead register
This site has had 3 applications since 2021: 3 approved, 0 refused.
-
21/01000/ADV Granted
Costa Coffee Unit 56 Windsor Royal Station Jubilee Arch Windsor SL4 1PJ
Consent to display x2 externally illuminated fascia signs, x2 non-illuminated wall mounted sign, x1 menu box.
-
21/00995/LBC Granted
Costa Coffee Unit 56 Windsor Royal Station Jubilee Arch Windsor SL4 1PJ
Consent to erect a partition to create a kitchen area, to drill a hole into the back wall in order to take the extraction duct out above roof level, to box in majority of the existing wall panelling and fireplaces in order to protect them and also run services without damaging the existing panelling, to build a front and back bar to serve customers, to build a boundary wall in the forecourt to create a sitting area and to replace the existing signage with similar size internally illuminated ones.
Timeline
Dates from the published record
-
31 Mar 2021
Received by Windsor and Maidenhead
-
30 Apr 2021
Validated
Checked as complete and ready for consideration.
-
24 Jun 2021
Decision issued: Application Permitted
-
3 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
23 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Windsor and Maidenhead granted permission on 24 June 2021, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Costa Coffee Unit 56 Windsor Royal Station Jubilee Arch Windsor SL4 1PJ
Consent to erect a partition to create a kitchen area, to drill a hole into the back wall in order to take the extraction duct out above roof level, to box in majority of the existing wall panelling and fireplaces in order to protect them and also run services without damaging the existing panelling, to build a front and back bar to serve customers, to build a boundary wall in the forecourt to create a sitting area and to replace the existing signage with similar size internally illuminated ones.
Granted Heritage and listed buildings 21 docsSmall domestic -
Costa Coffee Unit 56 Windsor Royal Station Jubilee Arch Windsor SL4 1PJ
Consent to display x2 externally illuminated fascia signs, x2 non-illuminated wall mounted sign, x1 menu box.
Granted Advertising 11 docs -
Unit 56 Windsor Royal Station Jubilee Arch Windsor SL4 1PJ
Consent to display 2no. internally illuminated fascia signs, 7no. non illuminated wall mounted signs and 1no. digital menu box.
Granted Advertising 15 docs -
CAFFÈ NERO Unit 58-59 Windsor Royal Railway Station Jubilee Arch Windsor SL4 1PJ
82% historically approved · decision due ~17 Sep
Consent for the demolition of the existing free-standing Caffe Nero unit.
Awaiting decision Heritage and listed buildings Demolition 14 docs -
Gourmet Burger Kitchen Unit 60 And 61 Windsor Royal Station Jubilee Arch Windsor SL4 1PJ
Consent to display 4no. non illuminated fascia signs, 2no. externally illuminated hanging signs, 2no. banners and window vinyls.
Refused Advertising Windows or glazing 12 docs -
Gourmet Burger Kitchen Unit 60 And 61 Windsor Royal Station Jubilee Arch Windsor SL4 1PJ
Consent to display x4 internally illuminated fascia signs, x1 externally illuminated projecting sign and x2 non-illuminated banner signs.
Refused Advertising 11 docs
Other full applications
In Windsor and Maidenhead
-
26/00685/FULL Granted
Blossoms Broomfield Park Sunningdale Ascot SL5 0JT
Relocation of front entrance door, new front canopy, single storey side infill extension, part single part two storey rear extension, first floor side extension, 1no. front dormer and alterations to fenestration and external finishes following demolition of existing elements.
-
26/01566/FULL Refused
20 Victoria Road Eton Wick Windsor SL4 6LY
New front boundary treatment, piers and gates (part retrospective).
-
26/01732/FULL Granted
27 Hemsdale Maidenhead SL6 6SL
Enlargement and conversion of the existing garage, single storey side/rear extension and alterations to fenestration.
-
26/01676/FULL Granted
51 Upper Village Road Ascot SL5 7AJ
Single storey side/rear extension.
-
26/01227/FULL Granted
92 Kennel Ride Ascot SL5 7NW
Two storey side extension with canopy, single storey rear extension alterations to fenestration and a detached outbuilding ancillary to the main dwelling.