Planning application
Costa Coffee Unit 56 Windsor Royal Station Jubilee Arch Windsor SL4 1PJ
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Consent to erect a partition to create a kitchen area, to drill a hole into the back wall in order to take the extraction duct out above roof level, to box in majority of the existing wall panelling and fireplaces in order to protect them and also run services without damaging the existing panelling, to build a front and back bar to serve customers, to build a boundary wall in the forecourt to create a sitting area and to replace the existing signage with similar size internally illuminated ones.
As published by the council, reference 21/00995/LBC
Application record
- Reference
- 21/00995/LBC
- Type
- Listed Building Consent
- Status
- Decided
- Decision
- Application Permitted
- Received
- 30 Mar 2021
- Validated
- 30 Apr 2021
- Decided
- 24 Jun 2021
- Ward
- Eton And Castle
- Parish
- Windsor Unparished
- Decision by
- Delegated
- Postcode
- SL4 1PJ
Site history
Applications at this address on the Windsor and Maidenhead register
This site has had 3 applications since 2021: 3 approved, 0 refused.
-
21/00999/FULL Granted
Costa Coffee Unit 56 Windsor Royal Station Jubilee Arch Windsor SL4 1PJ
To create a kitchen by erecting a partition, front and back bar counter, erection of a boundary wall outside and signage.
-
21/01000/ADV Granted
Costa Coffee Unit 56 Windsor Royal Station Jubilee Arch Windsor SL4 1PJ
Consent to display x2 externally illuminated fascia signs, x2 non-illuminated wall mounted sign, x1 menu box.
Timeline
Dates from the published record
-
30 Mar 2021
Received by Windsor and Maidenhead
-
30 Apr 2021
Validated
Checked as complete and ready for consideration.
-
24 Jun 2021
Decision issued: Application Permitted
-
3 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
21 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Windsor and Maidenhead granted permission on 24 June 2021, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About heritage and listed building applications
Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Costa Coffee Unit 56 Windsor Royal Station Jubilee Arch Windsor SL4 1PJ
To create a kitchen by erecting a partition, front and back bar counter, erection of a boundary wall outside and signage.
Granted Full applications 23 docsSmall domestic -
Costa Coffee Unit 56 Windsor Royal Station Jubilee Arch Windsor SL4 1PJ
Consent to display x2 externally illuminated fascia signs, x2 non-illuminated wall mounted sign, x1 menu box.
Granted Advertising 11 docs -
Unit 56 Windsor Royal Station Jubilee Arch Windsor SL4 1PJ
Consent to display 2no. internally illuminated fascia signs, 7no. non illuminated wall mounted signs and 1no. digital menu box.
Granted Advertising 15 docs -
CAFFÈ NERO Unit 58-59 Windsor Royal Railway Station Jubilee Arch Windsor SL4 1PJ
82% historically approved · decision due ~17 Sep
Consent for the demolition of the existing free-standing Caffe Nero unit.
Awaiting decision Heritage and listed buildings Demolition 14 docs -
Gourmet Burger Kitchen Unit 60 And 61 Windsor Royal Station Jubilee Arch Windsor SL4 1PJ
Consent to display 4no. non illuminated fascia signs, 2no. externally illuminated hanging signs, 2no. banners and window vinyls.
Refused Advertising Windows or glazing 12 docs -
Gourmet Burger Kitchen Unit 60 And 61 Windsor Royal Station Jubilee Arch Windsor SL4 1PJ
Consent to display x4 internally illuminated fascia signs, x1 externally illuminated projecting sign and x2 non-illuminated banner signs.
Refused Advertising 11 docs
Other heritage and listed building applications
In Windsor and Maidenhead
-
26/01211/LBC Granted
Ann Duels House Holyport Street Holyport Maidenhead SL6 2JR
Consent to replace 8 No. casements in 3 windows on the front elevation
-
26/01557/LBC Granted
Wiggington House High Street Eton Windsor
Consent for roof works to include the following replacements to the existing roof: roof tiles, 4no. dormer lead roof coverings, timber facing boards, fascia and soffits, rainwater goods and 1no. chimney pot for 1- 5 and 12 -13 Wiggington House.
-
26/01084/LBC Refused
St Marks Hospital 112 St Marks Road Maidenhead SL6 6DU
Consent for the retention of works to Blocks 6 and 8, including replacement of internal doors, erection of subdividing walls, installation of new DDA-compliant toilet, replacement of external DDA ramp, installation of window opening to internal partition and proposed replaced of external double doors to Block 6.
-
26/01367/LBC Refused
St Marks Hospital 112 St Marks Road Maidenhead SL6 6DU
Consent for alteration to the front entrance door to Block 6.
-
26/02102/LBC Awaiting decision
The Gate House 105 High Street Hurley Maidenhead SL6 5NB
Consent for works to the party wall to install insulation including the removal and replacement of timber boarding with existing or new, and for works to repair and replace the lath and plaster ceiling in relation to the approved garage conversion.