Skip to content
PlanIndex Get alerts
Menu

Planning application

Kings Worthy House London Road Kings Worthy Hampshire

Awaiting decision Winchester 26/01945/LIS

Works: Extension Loft or dormer Small domestic

Read from the description, not a valuation. How we read the register

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Reinstatement of missing lead roofs on front and rear bows, SW side addition and front porch, replace 2 rooflights in rear roof valleys, replace UPVC rainwater goods with cast iron, structural repa...

As published by the council, reference 26/01945/LIS

Application record

Reference
26/01945/LIS
Status
Current
Received
21 Sep 2026
Validated
21 Sep 2026
Ward
THE WORTHYS WARD
Parish
Kings Worthy Parish Council

Timeline

Dates from the published record

  1. 21 Sep 2026

    Received by Winchester

  2. 6 Oct 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 16 November 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Winchester took a median of 59 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

30 documents on file for this application

  • APPLICATION FORM - WITHOUT PERSONAL DATA Application Form · 21 Sep 2026
  • HERITAGE, PLANNING AND JUDGEMENT STATEMENT Background Papers · 21 Sep 2026
  • SITE PHOTOS Background Papers · 21 Sep 2026
  • HISTORIC PLANS Background Papers · 21 Sep 2026
  • HERITAGE IMAGE EVIDENCE Background Papers · 21 Sep 2026
  • DESIGN AND ACCESS STATEMENT Background Papers · 21 Sep 2026
  • THE LOCATION PLAN Drawing · 21 Sep 2026
  • BIODIVERSITY CHECKLIST Background Papers · 21 Sep 2026
  • EXISTING BLOCK PLAN OF THE SITE Drawing · 21 Sep 2026
  • EXISTING FLOOR PLANS Drawing · 21 Sep 2026
  • EXISTING ROOF PLAN Drawing · 21 Sep 2026
  • ELEVATIONS Drawing · 21 Sep 2026
  • SCHEDULE OF WORKS Background Papers · 21 Sep 2026
  • ROOF DETAIL Drawing · 21 Sep 2026
  • ROOF PLAN Drawing · 21 Sep 2026
  • FIRST FLOOR PLAN Drawing · 21 Sep 2026
  • BASEMENT AND GROUND FLOOR PLAN Drawing · 21 Sep 2026
  • SECOND FLOOR PLAN Drawing · 21 Sep 2026
  • SOFFIT DETAIL Drawing · 21 Sep 2026
  • INTERIOR DETAIL DRAWING A/B Drawing · 21 Sep 2026
  • STRUCTURAL SURVEY Background Papers · 21 Sep 2026
  • NOTES Drawing · 21 Sep 2026
  • HELIFIX BARS - METHOD STATEMENT Drawing · 21 Sep 2026
  • PROPOSED GROUND FLOOR PLAN SHEET 1 Drawing · 21 Sep 2026
  • PROPOSED GROUND FLOOR PLAN SHEET 3 Drawing · 21 Sep 2026
  • PROPOSED GROUND FLOOR PLAN SHEET 2 Drawing · 21 Sep 2026
  • HELIBAR SPECIFICATION Background Papers · 21 Sep 2026
  • ACOUSTIC ROLL SPECIFICATION Background Papers · 21 Sep 2026
  • ROCKWOOL SLABS Background Papers · 21 Sep 2026
  • COVERING LETTER Background Papers · 21 Sep 2026

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Winchester for determination, against a statutory target of eight weeks. Over the last year Winchester's median decision took 59 days. More in our guide to how long planning decisions take.

About this record

The published feed does not state which type of application this is; the register entry on Winchester's portal will say. Our guide explains the common types.