Planning application
26/01189/PNADD6
Marina Springles Lane Titchfield Fareham Hampshire PO15 6RR
Proposal
First-floor extension
As published by the council, reference 26/01189/PNADD6
Timeline
Dates from the published record
-
5 Jun 2026
Received by Winchester
-
29 Jun 2026
Validated
Checked as complete and ready for consideration.
-
26 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Winchester for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About outline applications
How this application type works
An outline application tests the principle of developing a site before the detail is worked up. Some or all of the particulars, such as appearance, layout, scale, access and landscaping, are held back as reserved matters for later approval. Permission at outline stage does not by itself allow building to start; the reserved matters must be approved first.
Nearby applications
Within 500 metres
-
25/02433/DIC Awaiting decision
Moors Valley Fontley Road Titchfield Fareham Hampshire PO15 6QX
Discharge of conditions 4 (water efficiency calculator), 5 (SAP), 6 (BNG) and 7 (drainage) of planning application 25/00757/FUL
-
21/02536/LDC Granted
Lavender House Stables Fontley Road Titchfield Hampshire
Use of land for the siting of a mobile home for residential occupation
-
25/02084/TPO Granted
Woodland Adjacent To Lee Ground Lee Ground Titchfield Hampshire
Work to be carried out in accordance with the Woodland Management Plan. The plan identifies the path and area that are used by Forest School and defines a ?study area? which has been surveyed and documented (this consist of < 20% of the woodland). An overview of the work includes: Felling - within the study area Ash trees that exhibit significant signs of ash die back (Ash Tree Class 3 or 4 as per the Tree Council Ash Dieback Toolkit). Given the current monitoring (VTAs), most of the felling is planned to be done over the next 4 years, during non nesting seasons (late autumn to early spring). Should it be anticipated that over 5m3 would be felled in one season, then a felling licence would be sought. Due to the high density of the unmanaged woodland, additional Ash trees may be felled, to allow additional light in and space for the tall thin oaks to recover and achieve the typical broader, domed shape crown. Note: No oak trees are scheduled to be felled as part of the Management Plan Coppicing - Hazel will be coppiced progressively eventually forming a 5-10 year rotation, with the wood being used for Forest School and Bushcraft activities Non-native/invasive species removal - Remove cherry laurel and braken Control spreading flora - manage the spread of brambles and ivy, thin holly to maintain a natural balance. Additionally the woodland trust have provided native saplings which are being planted to created hedgerows boundaries rather than wire fences. Natural regeneration is anticipated in the areas that felling has taken place, with saplings being monitored and protected. The woodland trust would also be able to supply saplings if needed. Woodland Management Plan has been reviewed and endorsed by Marco Bartolini (Arboricultural Consultant) Arbor-Eco Consultancy
-
24/01717/HOU Granted
Timbers Lee Ground Titchfield Fareham Hampshire PO15 6RP
Single storey garden building
-
25/02497/LDP Awaiting decision
Oakridge Fontley Road Titchfield Fareham Hampshire PO15 6QS
Erection of single storey rear extension
-
21/02434/LDP Withdrawn
Oakridge Fontley Road Titchfield PO15 6QS
Single storey rear extension
Other outline applications
In Winchester
-
26/01193/SCREEN Decided
Land To The West Of Courtenay Road Winchester Hampshire
EIA Screening Opinion in relation to the proposed development comprises the erection of up to 158 dwellings (including affordable housing provision), landscaping, parking, public open space, improvement of existing access, drainage and all other necessary on site infrastructure, in accordance with Regulation 6 of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017
-
26/00824/SCOPE Decided
Central Winchester Development Tanner Street Winchester Hampshire
This EIA Scoping Report requests a Scoping Opinion of the LPA (in this instance, Winchester City Council) pursuant to Regulation 15 of the EIA Regulations. The EIA Scoping Report suggests a comprehensive scope of work based on the experience of the assembled team of specialists and knowledge of the site. The LPA and consultees are invited to consider the contents of this EIA Scoping Report and comment accordingly within the five-week period prescribed by the EIA Regulations.
-
26/01373/PNADD6 Awaiting decision
The Hollies Curdridge Lane Curdridge Southampton Hampshire SO32 2BH
For the provision of an additional floor to an existing single-storey dwelling resulting in a building with a maximum height of 9m
-
26/00908/PNSOL Granted
Winchester Sport And Leisure Park Bar End Road Winchester Hampshire SO23 9NR
To install a 190.08kWp Solar PV panels on the roof of on Winchester Sports & Leisure Park, consisting of 396 panels.
-
26/00909/PNSOL Granted
Chesil Lodge Chesil Street Winchester Hampshire SO23 0AH
To install a 51.45kWp Solar PV panels on the roof of on Chesil Lodge, consisting of 98 panels.