Planning application
Crabwood Reservoir Sarum Road Winchester Hampshire
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Construction and operation of a new below ground potable (treated) water transfer pipeline between Crab Wood Water Service Reservoir (WSR) and Micheldever Road WSR, and associated development including a Motor Control Centre (MCC) kiosk at Crab Wood WSR and a Water Booster Station kiosk, MCC kiosk and transformer kiosk at Micheldever Road WSR and necessary service connections, along with temporary access arrangements, construction compounds and laydown areas
As published by the council, reference 26/00379/FUL
Application record
- Reference
- 26/00379/FUL
- Type
- Full Application
- Status
- Current
- Received
- 25 Feb 2026
- Validated
- 25 Feb 2026
- Ward
- BADGER FARM AND OLIVERS BATTERY WARD
- Parish
- Hursley
Timeline
Dates from the published record
-
25 Feb 2026
Received by Winchester
-
26 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 22 April 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Winchester took a median of 60 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Adams Hendry Consulting Ltd Agent, registered in Winchester
Active · incorporated 1999 · Winchester
100 applications on PlanIndex · across 21 councils · 99% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
193 documents on file for this application
- NATIONAL HIGHWAYS
- HCC HIGHWAYS
- HCC MINERALS AND WASTE
- LITTLETON AND HARESTOCK PARISH COUNCIL
- ADDITIONAL INFORMATION - ECOL & EP
- HSE
- WCC ARCHAEOLOGY HISTORIC ENVIRONMENT TEAM
- WCC HISTORIC ENVIRONMENT
- GODFREY DAY MAP 1- OBJECTION
- GODFREY DAY MAP 2 - OBJECTION
- GODFREY DAY - OBJECTION
- SGN CONSULTATION UPDATE
- MR KIM PARKER-OBJECTS(FULL)
- MRS JEAN JONES-OBJECTS(FULL)
- WSI MAIN COMPOUND
- WSI FOR WEST OF BRANSBURY LANE AND WEST OF THE ANDYKE
- HCC LLFA
- RICHARD ABELL - NEUTRAL
- NATURAL ENGLAND
- NATIONAL HIGHWAYS
- ENVIRONMENT AGENCY
- WCC ECOLOGY
- WCC _ ENV HEALTH
- HCC - MINERALS AND WASTE
- WCC LANDSCAPE TEAM
- APPLICATION FORM - WITHOUT PERSONAL DATA
- ES VOL 1 CHAPTER 2 PART 2 PROPOSED SCHEME
- ES VOL 1 CHAPTER 2 PART 3 PROPOSED SCHEME
- ES VOL 1 CHAPTER 3 ALTERNATIVES
- ES VOL 1 CHAPTER 4 EIA APPROACH
- ES VOL 1 CHAPTER 5 PART 1 BIODIVERSITY
- ES VOL 1 CHAPTER 5 PART 2 BIODIVERSITY
- ES VOL 1 CHAPTER 7 WATER
- ES VOL 1 CHAPTER 8 NAT RES & LAND QUALITY
- ES VOL 1 CHAPTER 9 TRAFFIC & ACCESS
- ES VOL 1 CHAPTER 10 PART 2 NOISE & VIBRATION
- ES VOL 1 CHAPTER 10 PART 3 NOISE & VIBRATION
- ES VOL 1 CHAPTER 11 CLIMATE & GG
- ES VOL 1 CHAPTER 12 AGRICULTURE & SOILS
- ES VOL 1 CHAPTER 13 CUMULATIVE EFFECTS
- ES VOL 1 CHAPTER 14 SUMMARY
- ES VOL 2 APPENDIX 1.1 PART 1 EIA SCOPE
- ES VOL 2 APPENDIX 1.1 PART 2 EIA SCOPE
- ES VOL 2 APPENDIX 1.1 PART 3 EIA SCOPE
- ES VOL 2 APPENDIX 1.1 PART 4 EIA SCOPE
- ES VOL 2 APPENDIX 1.1 PART 5 EIA SCOPE
- ES VOL 2 APPENDIX 1.1 PART 6 EIA SCOPE
- ES VOL 2 APPENDIX 1.1 PART 7 EIA SCOPE
- ES VOL 2 APPENDIX 1.1 PART 8 EIA SCOPE
- ES VOL 2 APPENDIX 1.1 PART 9 EIA SCOPE
- ES VOL 2 APPENDIX 1.2 SCOPING OPINIONS
- ES VOL 2 APPENDIX 1.3 COMPETENCE OF EXPERTS
- ES VOL 2 APPENDIX 4.1 RESPONSE TO EIA SCOPING OPINIONS
- ES VOL 2 APPENDIX 4.2 LEGISLATION & GUIDANCE
- ES VOL 2 APPENDIX 4.3 CULTURAL HERITAGE TECHNICAL NOTE
- ES VOL 2 APPENDIX 5.1 HRA SCREENING ASSESSMENT
- ES VOL 2 APPENDIX 5.2 GREAT CRESTED NEWT SURVEY REPORT
- ES VOL 2 APPENDIX 5.3 PART 1 ARBORICULTURAL
- ES VOL 2 APPENDIX 5.3 PART 2 ARBORICULTURAL
- ES VOL 2 APPENDIX 5.5 AQUATIC HABITAT
- ES VOL 2 APPENDIX 5.6 AQUATIC ECOLOGY REPORT
- ES VOL 2 APPENDIX 5.7 DORMOUSE SURVEY PART 1
- ES VOL 2 APPENDIX 5.7 DORMOUSE SURVEY PART 2
- ES VOL 2 APPENDIX 5.8 BAT SURVEY
- ES VOL 2 APPENDIX 5.9 RIPARIAN MAMMAL
- ES VOL 2 APPENDIX 5.10 VALIDATION WALK OVER SURVEY REPORT
- ES VOL 2 APPENDIX 5.11 ARBORICULTURAL METHOD STATEMENT
- ES VOL 2 APPENDIX 6.1 LVIA METHODOLOGY
- ES VOL 2 APPENDIX 6.2 PART 1 LVIA BASELINE PHOTOGRPAHY
- ES VOL 2 APPENDIX 6.2 PART 2 LVIA BASELINE PHOTO
- ES VOL 2 APPENDIX 6.2 PART 3 LVIA BASELINE PHOTO
- ES VOL 2 APPENDIX 6.2 PART 4 LVIA BASELINE PHOTO
- ES VOL 2 APPENDIX 6.3 LVIA VIEWPOINT ASSESSMENT
- ES VOL 2 APPENDIX 7.1 FLOOD RISK ASSESSMENT
- ES VOL 2 APPENDIX 7.2 FLOOD RISK ASSESSMENT
- ES VOL 2 APPENDIX 7.3 HYDROGEOLOGICAL IMPACT ASSESSMENT
- ES VOL 2 APPENDIX 8.1 PART 1 GEOTHECH & GEOENV RISK
- ES VOL 2 APPENDIX 8.1 PART 2 GEOTECH & GEOENV
- ES VOL 2 APPENDIX 8.1 PART 3 GEOTECH PRELIM RISK ASSESSMENT
- ES VOL 2 APPENDIX 8. 1 PART 4 GEOTECH PRELIM RISK ASSESSMENT
- ES VOL 2 APPENDIX 8.1 PART 5 GEOTECH PRELIM RISK ASSESSMENT
- ES VOL 2 APPENDIX 8.1 PART 6 GEOTECH PRELIM RISK ASSESSMENT
- ES VOL 2 APPENDIX 8.1 PART 7 GEOTECH PRELIM RISK ASSESSMENT
- ES VOL 2 APPENDIX 8.1 PART 8 GEOTECH PRELIM RISK ASSESSMENT
- ES VOL 2 APPENDIX 8.1 PART 9 GEOTECH PRELIM RISK ASSESSMENT
- ES VOL 2 APPENDIX 8.2 PART 1 GROUND INVESTIGATION
- ES VOL 2 APPENDIX 8.2 PART 2 GROUND INVESTIGATION REPORT
- ES VOL 2 APPENDIX 8.2 PART 3 GROUND INVESTIGATION REPORT
- ES VOL 2 APPENDIX 8.2 PART 4 GROUND INVESTIGATION REPORT
- ES VOL 2 APPENDIX 8.2 PART 5 GROUND INVESTIGATION REPORT
- ES VOL 2 APPENDIX 8.2 PART 6 GROUND INVESTIGATION REPORT
- ES VOL 2 APPENDIX 8.2 PART 7 GROUND INVESTIGATION
- ES VOL 2 APPENDIX 8.3: GROUND INVESTIGATION TECHNICAL NOTE
- ES VOL 2 APPENDIX 9.1: ATC AND PROW SURVEY LOCATIONS
- ES VOL 2 APPENDIX 10.1 BASELINE NOISE MONITORING DATA
- ES VOL 2 APPENDIX 10.2 NOISE AND VIBRATION ASSESSMENTS
- ES VOL 2 APPENDIX 13.1 LONG LIST OF COMMITTED DEVELOPMENTS
- ES VOL 2 APPENDIX 14.1 MITIGATION REGISTER
- ES VOL 3 NON TECHNICAL SUMMARY NTS
- BNG REPORT PART 1
- BNG REPORT PART 2
- BNG REPORT PART 3
- BNG REPORT PART 4
- BNG REPORT PART 5
- LEMP PART 1
- LEMP PART 2
- AIR QUALITY ASSESSMENT
- ARCHAEOLOGY DETAILED GRADIOMETER SURVEY REPORT
- GEOPHYSICAL DETAILED GRADIOMETER SURVEY - PART 2.
- GEOPHYSICAL DETAILED GRADIOMETER SURVEY - PART 3
- HEBDA PART 1 OF 6 HISTORIC ENVIRONMENT DESK BASED ASSESSMENT
- ARCHAEOLOGY UNKNOWN 4
- HEBDA PART 3 OF 6 HISTORIC ENVIRONMENT DESK BASED ASSESSMENT
- HEBDA PART 4 OF 6 HISTORIC ENVIRONMENT DESK BASED ASSESSMENT
- HEBDA PART 5 OF 6 HISTORIC ENVIRONMENT DESK BASED ASSESSMENT
- HEBDA PART 6 OF 6 HISTORIC ENVIRONMENT DESK BASED ASSESSMENT
- ARCHAEOLOGY WSI WEST OF BRANSBURY LANE
- ARCHAEOLOGY WSI CEMETERY WEST OF LITTLETON LANE
- ARCHAEOLOGY WSI LAND WEST OF BARTON STACEY,
- ARCHAEOLOGY WSI SOUTH OF DEAN LANE,
- ARCHAEOLOGY WSI EAST OF LANHAM LANE,
- ARCHAEOLOGY WSI EAST OF LITTLETON HOUSE
- ARCHAEOLOGY WSI LAND SOUTH OF MICHELDEVER ROAD,
- ARCHAEOLOGY WSI PART 1 EX-PIG FARM AND DAIRY FARM
- ARCHAEOLOGY WSI PART 2 EX-PIG FARM AND DAIRY FARM PART
- ARCHAEOLOGICAL EVALUATION PART 1
- ARCHAEOLOGICAL EVALUATIONPART 2
- ARCHAEOLOGICAL EVALUATION PART 3
- ARCHAEOLOGY PALEOLITHIC GEO PART 1
- ARCHAEOLOGY PALEOLITHIC GEO PART 2
- ARCHAEOLOGY PALEOLITHO GEO PART 3
- ARCHAEOLOGY MITIGATION STRATEGY PART 1
- ARCHAEOLOGY MIGIATION STRATEGY PART 2
- BIODIVERSITY METRIC CALCULATION TOOL
- BNG CONDITION SURVEY
- ES VOL 1 CHAPTER 6 LANDSCAPE AND VISUAL
- ES VOL 1 CHAPTER 10 PART 1 NOISE & VIBRATION
- TRANSPORT ASSESSMENT PART 2 OF 4
- TRANSPORT ASSESSMENT PART 3 OF 4
- TRANSPORT ASSESSMENT PART 4 OF 4
- ES VOL 1 TABLE OF CONTENTS
- ES VOL 1 CHAPTER 2 PART 1 PROPOSED DEVELOPMENT
- CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN (CEMP)
- ES VOL 1 CHAPTER 1 INTRODUCTION
- CRAB WOOD WSR EXISTING SITE LAYOUT
- CRAB WOOD WSR PROPOSED SITE LAYOUT
- MICHELDEVER ROAD WSR EXISTING SITE LAYOUT
- MICHELDEVER ROAD WSR PROPOSED SITE LAYOUT
- CRAB WOOD WSR ELEVATIONS
- CRAB WOOD WSR PROPOSED MCC ELEVATION
- MICHELDEVER ROAD WSR PROPOSED MCC ELEVATION
- MICHELDEVER ROAD WSR PROPOSED PUMP KIOSK ELEVATION
- MICHELDEVER ROAD WSR ELEVATIONS
- APPLICATION AREA WINCHESTER
- APPLICATION AREA TEST VALLEY BOROUGH
- SUB ROUTE LOCATION PLAN SHEET 1 OF 17
- SUB ROUTE LOCATION PLAN SHEET 2 OF 17
- SUB ROUTE LOCATION PLAN SHEET 3 OF
- SUB ROUTE LOCATION PLAN SHEET 4 OF 17
- SUB ROUTE LOCATION PLAN SHEET 5 OF 17
- SUB ROUTE LOCATION PLAN SHEET 6 OF 17
- SUB ROUTE LOCATION PLAN SHEET 7 OF 17
- SUB ROUTE LOCATION PLAN SHEET 8 OF 17
- SUB ROUTE LOCATION PLAN SHEET 9 OF 17
- SUB ROUTE LOCATION PLAN SHEET 10 OF 17
- SUB ROUTE LOCATION PLAN SHEET 11 OF 17
- SUB ROUTE LOCATION PLAN SHEET 12 OF 17
- SUB ROUTE LOCATION PLAN SHEET 13 OF 17
- SUB ROUTE LOCATION PLAN SHEET 14 OF 17
- SUB ROUTE LOCATION PLAN SHEET 15 OF 17
- SUB ROUTE LOCATION PLAN SHEET 16 OF 17
- SUB ROUTE LOCATION PLAN SHEET 17 OF 17
- MICHELDEVER ROAD DEMOLITION PLAN
- CRAB WOOD WSR EXISTING ELEVATIONS
- MICHELDEVER ROAD WSR EXISTING ELEVATIONS
- MAIN TEMPORARY COMPOUND EXISTING LAYOUT
- MAIN TEMPORARY COMPOUND INDICATIVE PROPOSED LAYOUT
- TEMPORARY SATELLITE COMPOUND EXISTING PLAN
- TEMPORARY SATELLITE COMPOUND INDICATIVE PROPOSED PLAN
- MICHELDEVER ROAD WSR ALM CONNECTION TO RESERVOIR DETAILS
- CRABWOOD WSR ALM CONNECTION TO RESERVOIR DETAILS
- CRABWOOD WSR TO MICHELDEVER ROAD WSR PIPELINE TYPICAL WORKING STRIPS
- CRABWOOD WSR TO MICHELDEVER ROAD WSR PIPELINE - VALVE CHAMBER DETAILS
- TRANSPORT ASSESSMENT PART 1 OF 4
- SITE LOCATION PLAN
- PLANNING DRAWING LOCAL AUTHORITY APPLICAITON AREA
- PLANNING DRAWING ALM KEY ROUTE LOCATION PLAN
- SCHEDULE OF MATERIALS
- COMMUNITY INFRASTRUCTURE LEVY - COMPLETED FORM
- PLANNING STATEMENT
- STATEMENT OF COMMUNITY INVOLVEMENT
- STATEMENT OF COMMUNITY INVOLVEMENT
- COVER LETTER DUPLICATE
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Winchester for determination, against a statutory target of eight weeks. Over the last year Winchester decided full applications in a median of 105 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Other full applications
In Winchester
-
26/02177/FUL Awaiting decision
Denmead Community Centre School Lane Denmead Waterlooville Hampshire PO7 6LU
Full planning application for siting an InPost Parcel Locker
-
26/02122/FUL Awaiting decision
69 St Georges Street Winchester Hampshire SO23 8BG
Redecoration of the shopfront with associated works.
-
26/02062/FUL Awaiting decision
13 Pemerton Road Winchester Hampshire SO22 6EU
The construction of a single-storey contemporary garden building to provide a dedicated home working space.
-
26/00776/FUL Withdrawn
Old Hyde House 75 Hyde Street Winchester Hampshire SO23 7DW
The works proposed involve the dismantling and rebuilding of a section of the boundary wall, and the removal of two existing trees to facilitate the proposed works.
-
26/01526/FUL Granted
Winchester College Kingsgate Street Winchester Hampshire SO23 9PF
Conversion and refurbishment (including reconfiguring the layout and installing a mezzanine floor) of the Fives Courts (Grade II listed) to create seven new classrooms, associated facilities and th...