Planning application
25/02487/PNSOL
Unit 3, 4, 6 And Part Ground Floor Unit 6 Ring Tower Centre Moorside Road Winchester Hampshire
Proposal
PV Solar installation
As published by the council, reference 25/02487/PNSOL
Timeline
Dates from the published record
-
5 Dec 2025
Received by Winchester
-
29 Jan 2026
Decision issued: Prior Approval Not Required
-
26 Jul 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About outline applications
How this application type works
An outline application tests the principle of developing a site before the detail is worked up. Some or all of the particulars, such as appearance, layout, scale, access and landscaping, are held back as reserved matters for later approval. Permission at outline stage does not by itself allow building to start; the reserved matters must be approved first.
Nearby applications
Within 500 metres
-
25/02098/FUL Granted
Block B Gentian House Moorside Road Winchester Hampshire SO23 7RX
Continuation of use of building as B8 use for period of up to 5 years.
-
21/01767/FUL Granted
Unit 20 Moorside Road Winchester Hampshire SO23 7RX
Extension of existing warehouse for self-storage purposes in Use Class B8; reconfiguration of yard and loading area and alterations to northern elevation of existing building.
-
26/01103/AVC Granted
Martins Of Winchester Easton Lane Winchester Hampshire SO23 7SL
5m Pylon sign Illuminated
-
26/01221/FUL Awaiting decision
IAC House And Partnership House Moorside Road Winchester Hampshire SO23 7RX
Ground investigation, remediation and associated works following demolition of building to slab level under 26/00867/DEM
-
26/00867/DEM Granted
IAC House And Partnership House Moorside Road Winchester Hampshire SO23 7RX
I.A.C House
-
CS/23/94649 Decided
M3 Junction 9 Improvements, Winchester, SO23 7RS
National Highways submission: M3 Junction 9 Improvements scheme
Other outline applications
In Winchester
-
26/01193/SCREEN Decided
Land To The West Of Courtenay Road Winchester Hampshire
EIA Screening Opinion in relation to the proposed development comprises the erection of up to 158 dwellings (including affordable housing provision), landscaping, parking, public open space, improvement of existing access, drainage and all other necessary on site infrastructure, in accordance with Regulation 6 of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017
-
26/00824/SCOPE Decided
Central Winchester Development Tanner Street Winchester Hampshire
This EIA Scoping Report requests a Scoping Opinion of the LPA (in this instance, Winchester City Council) pursuant to Regulation 15 of the EIA Regulations. The EIA Scoping Report suggests a comprehensive scope of work based on the experience of the assembled team of specialists and knowledge of the site. The LPA and consultees are invited to consider the contents of this EIA Scoping Report and comment accordingly within the five-week period prescribed by the EIA Regulations.
-
26/01373/PNADD6 Awaiting decision
The Hollies Curdridge Lane Curdridge Southampton Hampshire SO32 2BH
For the provision of an additional floor to an existing single-storey dwelling resulting in a building with a maximum height of 9m
-
26/00908/PNSOL Granted
Winchester Sport And Leisure Park Bar End Road Winchester Hampshire SO23 9NR
To install a 190.08kWp Solar PV panels on the roof of on Winchester Sports & Leisure Park, consisting of 396 panels.
-
26/00909/PNSOL Granted
Chesil Lodge Chesil Street Winchester Hampshire SO23 0AH
To install a 51.45kWp Solar PV panels on the roof of on Chesil Lodge, consisting of 98 panels.