Skip to content
PlanIndex Get alerts
Menu

Planning application

Land Off Abbotstone Road Fobdown Hampshire

Granted Winchester 25/01730/DIC Details in Compliance

Works: Trees Domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Original application: 24/02780/FUL Conditions: 10, 13, 14, 17, 18 and 21 Design Stage SAP calculation demonstrating that the development will achieve a Dwelling Emission Rate (DER) at least 19% lower than the 2013 Part L Target Emission Rate (TER). Water efficiency calculator confirming predicted internal water use of no more than 105 litres per person per day. Confirmation that protective measures (fencing) have been installed in accordance with the Arboricultural Method Statement (Ref: 1396.bjh.Jan25) and Tree Protection Plan (Ref: BJH03/04). Notification to the Local Planning Authority that protective measures have been installed and a request for site inspection by the Arboricultural Officer to confirm compliance with the approved Arboricultural Method Statement and Tree Protection Plan. Confirmation of appointment of Bernie Harverson (author of the approved Arboricultural Method Statement) as the supervising arboricultural consultant. Utility Services Layout Plan showing the location of all existing and proposed utility services (gas, electricity, water, drainage, and communications) in relation to the approved development. Detailed surface water drainage strategy, drawings, and specifications prepared by the drainage consultant.

As published by the council, reference 25/01730/DIC

Application record

Reference
25/01730/DIC
Type
Details in Compliance
Status
Decided
Decision
Granted As published: Application Permitted
Received
25 Aug 2025
Validated
25 Aug 2025
Decided
5 Nov 2025
Ward
ALRESFORD AND ITCHEN VALLEY WARD
Parish
Old Alresford Parish Council
Decision by
Delegated Decision
Postcode
SO24 9TD

Timeline

Dates from the published record

  1. 25 Aug 2025

    Received by Winchester

  2. 5 Nov 2025

    Decision issued: Application Permitted

  3. 12 Aug 2026

    Added to PlanIndex

Cases linked to this one on the register

  • Application: 24/02780/FUL (Decided)

Documents

Plans, drawings, consultee responses and the officer's report

11 documents on file for this application

  • DECISION NOTICE Decision Notice · 05 Nov 2025
  • TREE OFFICER Consultee Comment · 23 Oct 2025
  • WCC DRAINAGE ENGINEER Consultee Comment · 16 Oct 2025
  • UTILITY PLAN Drawing · 09 Sep 2025
  • APPLICATION FORM - WITHOUT PERSONAL DATA Application Form · 25 Aug 2025
  • SITE LAYOUT FOUL AND SURFACE WATER DRAINAGE Drawing · 25 Aug 2025
  • DRAINAGE DESIGN REPORT Background Papers · 25 Aug 2025
  • ADDITIONAL PLANS Drawing · 25 Aug 2025
  • WATER EFFICIENCY CALCULATOR Background Papers · 25 Aug 2025
  • BREL COMPLIANCE REPORT Background Papers · 25 Aug 2025
  • TREE PROTECTION INSTALLATION Background Papers · 25 Aug 2025

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Winchester granted permission on 5 November 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

In Winchester

  • 26/01788/DIC Awaiting decision

    Land East Of Darnel Road Waterlooville Hampshire

    Discharge of conditions 7 (Site plan and access visibility splays), 8 (Drainage strategy and catchment layout), 9 (Construction Traffic Management Plan), 11 (Employment and skills plan), 13 (Proposed materials), 25 (Proposed On-Street Parking Control Plan), and 27 (Site sections and Topographic surveys) for application 21/01005/FUL

    Received 27 Aug, published by the council 29 Sep 2026 Conditions
  • 26/00171/DIC Granted

    Shedfield House Dairy Sandy Lane Shedfield Hampshire

    Discharge of conditions 4 (drainage) and 5A (Partial discharge of archaeology) of planning application 25/01056/FUL

    Received 29 Jan, published by the council 26 Jul 2026 Conditions
  • 26/01730/DIC Awaiting decision

    Sutton Scotney Services Southbound A34 Sutton Scotney Winchester Hampshire SO21 3JY

    Discharge Condition 3 (External Sample Details), 4 (Construction Management Plan), 8 (Details of Chemical and Petrol Storage), 9 (Surface water disposal scheme), 10 (Foul water disposal scheme) for application 26/00072/FUL

    Received 20 Aug, published by the council 27 Aug 2026 Conditions
  • 26/01707/DIC Awaiting decision

    Hangar Nurseries Thompsons Lane Owslebury Winchester Hampshire SO21 1JH

    Discharge conditions 5 (Biodiversity gain plan), 6 (Habitat Management and Monitoring Plan), 10 (details of biodiversity enhancement measures) and 12 (Details of surface water drainage measures) for application 26/00036/FUL

    Received 18 Aug, published by the council 26 Aug 2026 Conditions
  • 26/01709/DIC Awaiting decision

    The Happy Farm Winchester Road Waltham Chase Southampton Hampshire SO32 2LL

    Discharge conditions 3 (Materials), 4 (Consult Southern Water), 6 (Construction Environmental Management Plan), 8 (Protective Measures), 11 (Supervision of Construction Activity) and 16 (Flood Resilience and Resistance Strategy) for applications 25/02530/FUL

    Received 18 Aug, published by the council 1 Sep 2026 Conditions