Planning application
St Pauls Bridge Upper High Street Winchester Hampshire
Relates to 22/02527/FUL
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Discharge of condition 4 of planning application 22/02527/FUL
As published by the council, reference 23/01232/DIC
Application record
- Reference
- 23/01232/DIC
- Type
- Details in Compliance
- Status
- Decided
- Decision
- Granted As published: Application Permitted
- Received
- 19 May 2023
- Validated
- 19 May 2023
- Decided
- 6 Jun 2023
- Ward
- ST PAUL WARD
- Parish
- Winchester Town
- Decision by
- Delegated Decision
Site history
Applications at this address on the Winchester register
This site has had 3 applications since 2022: 3 approved, 0 refused.
-
24/02760/DIC Granted
St Pauls Bridge Upper High Street Winchester Hampshire
Discharge of conditions 2 and 4 - 23/02952/FUL
-
22/02527/FUL Granted
St Pauls Bridge Upper High Street Winchester Hampshire
Replacement of railings on bridge and partially along railway boundary on connecting highways
Timeline
Dates from the published record
-
19 May 2023
Received by Winchester
-
6 Jun 2023
Decision issued: Application Permitted
-
14 Nov 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
-
22/02527/FUL Granted
St Pauls Bridge Upper High Street Winchester Hampshire
Replacement of railings on bridge and partially along railway boundary on connecting highways
Who's behind it
Company information only, from the register and Companies House
Network Rail Infrastructure Ltd Agent, registered in London
Active · incorporated 1994 · London
159 applications on PlanIndex · across 45 councils · 98% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
3 documents on file for this application
A planning file usually holds the application form, the consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWorking a patch? Trade sends you every new job in your area each morning. 14 days free.
What this grant of permission means
Winchester granted permission on 6 June 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
St Pauls Bridge Upper High Street Winchester Hampshire
Replacement of railings on bridge and partially along railway boundary on connecting highways
-
St Pauls Bridge Upper High Street Winchester Hampshire
Discharge of conditions 2 and 4 - 23/02952/FUL
Granted Conditions 5 docs -
2 St Pauls Hill Winchester SO22 5AB
Side extension, alterations to elevations, chimney removal and new woodburner flue
Granted Householder Extension 11 docsDomestic -
Street Record Station Road Winchester Hampshire
Proposed 15.0m Phase 8 Monopole C/W wrapround Cabinet at base and associated ancillary works.
Refused Telecoms 34 docs -
St Pauls Medical Practice Alison Way Winchester Hampshire SO22 5DD
96% historically approved · decision due ~27 Jul
(On open land between Alison Way, Clifton Terrance + St Paul's Hill w3w. untruth.orbited.decorated) T11 - Plum Tip reduce the crown overall by 1m back to suitable growth points to reduce the windsa...
-
St Pauls Medical Practice Alison Way Winchester Hampshire SO22 5DD
T003 (Holly) - reduce back from adjacent structures to create 2-2.5 metre clearance. T004 (silver Birch) - crown raise to 2.5 metres over access road. Reduce canopy by up to 1 metre, back to suitable growth point to maintain clearance from adjacent structures. T006 (Silver Birch) - crown raise to 2.5 metres. T007 (Willow) - remove to ground level due to direct impact to street light and road signs. G001 (Smokebush/cotoneaster) - crown raise to 2.5 metres to facilitate parking bays. Reduce branches away from structures to provide 0.5 metre clearance.
Other condition discharge and variation applications
In Winchester
-
26/02081/DIC Awaiting decision
The Gorse 111 Main Road Colden Common Winchester Hampshire SO21 1TB
Discharge of conditions 3 (materials), 4 part a (water efficiency), 5 (BNG), 6 (HMMP), 7 (finished floor level), 9 (Landscape), 14, 16 and 17 (Trees), 19 (southern water drainage), 20 (climate change mitiigation) of planning application 26/00049/FUL
-
26/02069/DIC Awaiting decision
Berewood Phase 1 Hambledon Road Denmead Hampshire
Discharge of condition 4 (details of the connection to the multiuse greenway) and 11 (maintenance of all roads) of application 25/01354/REM
-
26/02056/DIC Awaiting decision
Queens Head Portsmouth Road Fishers Pond Hampshire
Discharge of Condition(s) 10 (Verication of Remidial Strategy (Geogolgy)) for application 26/00106/VAR.
-
26/02054/DIC Awaiting decision
Kings School Romsey Road Winchester Hampshire SO22 5PN
Discharge of condition 10(surface water details) and 15 (Construction Traffic Management Plan) of application 25/02160/FUL
-
26/02042/DIC Awaiting decision
Land To The East Of Sun Lane Alresford Hampshire
Discharge of condition 8 (Compliance Check Report) for application 21/01731/REM