Skip to content
PlanIndex Get alerts
Menu

Planning application

Cypress Point Uplands Road Denmead PO7 6HF

Granted Winchester 20/01086/HOU Householder Application

Works: Extension Loft or dormer Roofing Windows or glazing Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Proposed Single Storey Rear Extension, Proposed Two Storey, Single Storey and First Floor Extensions, Alterations to the Existing Roof (including new dormers, raising ridge height, etc), Proposed Canopy Porch, Partial Garage Conversion and Alterations to Fenestration

As published by the council, reference 20/01086/HOU

Application record

Reference
20/01086/HOU
Type
Householder Application
Status
Decided
Decision
Granted As published: Application Permitted
Received
29 May 2020
Validated
29 May 2020
Decided
23 Jul 2020
Ward
DENMEAD WARD
Parish
Denmead Parish Council
Decision by
Delegated Decision
Postcode
PO7 6HF

Timeline

Dates from the published record

  1. 29 May 2020

    Received by Winchester

  2. 23 Jul 2020

    Decision issued: Application Permitted

  3. 2 Oct 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

PMG Building Design&Consultancy Ltd Agent, a design practice registered in Fareham

Active · incorporated 2003 · Fareham

51 applications on PlanIndex · across 10 councils · 98% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

10 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Winchester granted permission on 23 July 2020, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About householder applications

Householder applications cover work to an existing house and its garden, such as extensions, lofts and outbuildings, and cannot create a separate dwelling or change what the building is used for. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Wimborne Uplands Road Denmead PO7 6HF

    20/01501/HOU Submitted 16 Jul 2020 50 yards away

    Construction of an oak framed garage

    Granted Householder 7 docs
    Domestic
  • Guelder Cottage Uplands Road Denmead PO7 6HE

    21/01204/HOU Submitted 5 May 2021 50 yards away

    Installation of 1no clear-glazed Velux window in existing bathroom along the eastern side elevation.

    Granted Householder Loft or dormer Windows or glazing 11 docs
    Domestic
  • Rookesbury Uplands Road Denmead PO7 6HF

    21/01994/TPO Submitted 26 Jul 2021 100 yards away

    T1 Oak- crown reduce by around 2-3 meters back to suitable growth points. Remove lower epicormic shoots. Remove any major deadwood. Reason is general maintenance, also the tree has signs of potential ganoderma as a bracket has been located at the base of the tree (picture in attachments) however the bracket has been pulled of by a neighbouring shrub so has lost its colour and is hard to identify what exact bracket it is from. This could cause problem in the future, however a general crown reduction will help reduce the risk until re assessed at a later date if needed.

    Granted Trees 3 docs
  • Timbers Uplands Road Denmead Waterlooville Hampshire PO7 6HE

    20/01787/HOU Submitted 19 Aug 2020 100 yards away

    Construction of double bay car port and roof storage (access via loft ladder)

    Granted Householder 6 docs
    Domestic
  • Beresford House Thompsons Lane Denmead PO7 6NB

    21/01605/TPO Submitted 8 Jun 2021 100 yards away

    T1 - English oak - The tree has been historically reduced throughout the entire canopy. This pruning has lead to an abundance of exterior growth which has been shaded out by new outer canopy growth resulting in excessive deadwood. Reduce the lateral spread by no more than 1m from the tips blending to 0.5m at the top. Remove all deadwood down to 20mm in diameter or longer than 0.5m in length. (REF ONLY)

    Granted Trees 3 docs
  • Lawnswood Uplands Road Denmead Waterlooville Hampshire PO7 6HF

    22/00511/TPO Submitted 7 Mar 2022 100 yards away

    T1 Oak tree- the tree is within close proximity to the buildings. So a general maintenance prune on the tree is required to stop encroachment over the property. To reduce back to old pruning points and remove epicormic growth from the lower half of the tree.

    Granted Trees 3 docs

In Winchester

  • 26/02132/HOU Awaiting decision

    24 Cranworth Road Winchester Hampshire SO22 6SE

    Side extension replacing existing conservatory, reconfiguration of windows to provide new doors, new patio and removal of chimney stack.

    Received 15 Oct, published by the council 20 Oct 2026 Householder
  • 26/02131/HOU Awaiting decision

    Dawson New Farm Road Alresford Hampshire SO24 9QP

    Erection of a single-storey side and front extension and installation of Velux windows in the existing roof.

    Received 14 Oct, published by the council 19 Oct 2026 Householder
  • 26/02119/HOU Awaiting decision

    49 Church Lane Colden Common Winchester Hampshire SO21 1TW

    Proposed rear extension and roof conversion

    Received 14 Oct, published by the council 20 Oct 2026 Householder
  • 26/02108/HOU Awaiting decision

    Little Fontley Fontley Road Titchfield Fareham Hampshire PO15 6QS

    Enlargement of existing dormer window to east facing elevation of main roof

    Received 13 Oct, published by the council 21 Oct 2026 Householder
  • 26/02098/HOU Awaiting decision

    Zeina Winchester Road Waltham Chase Southampton Hampshire SO32 2LX

    Front porch

    Received 12 Oct, published by the council 19 Oct 2026 Householder