Planning application
30 Dursden Lane, Pewsey, SN9 5JN
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Discharge of conditions 3 (Dwelling Materials) and 4 (Boundary Wall Materials) relating to application PL/2024/04817.
As published by the council, reference PL/2026/01950
Application record
- Reference
- PL/2026/01950
- Type
- Approval of details reserved by a condition
- Status
- Closed
- Decision
- Granted As published: Approve
- Received
- 23 Mar 2026
- Validated
- 23 Mar 2026
- Decided
- 4 Jun 2026
- Ward
- Pewsey ED
- Parish
- Pewsey CP
- Postcode
- SN9 5JN
Timeline
Dates from the published record
-
23 Mar 2026
Received by Wiltshire
-
4 Jun 2026
Decision issued: Approve
-
12 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
6 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Wiltshire granted permission on 4 June 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Hollybush Lane, Highway banks both sides of lane, Pewsey, SN9 5JQ
Please refer to attached report by Uptons - Pewsey Hollybush Lane tree report April 2021.
Granted Trees 2 docs -
FAIRFIELD HOUSE, FAIRFIELD, PEWSEY, SN9 5JU
Demolition of existing lean-to & erection of replacement single-storey extension to east elevation. Formation of 3no. dormer windows to south elevation and 1no. flat roofed dormer to the north elevation. Erection of pool house.
Granted Householder Extension Loft or dormer +2 17 docsDomestic -
Fairfield Barn, Fairfield Farm, Pewsey, SN9 5JU
Inclusion of external flue and pv panels.
Withdrawn Householder 10 docsDomestic -
Fairfield Barn, Fairfield Farm, Pewsey, SN9 5JU
Variation of condition 2 (Approved plans) of PL/2022/06484 to allow minor amendments to the approved design, including the installation of solar panels, the addition of a flue and alterations to approved openings.
Granted Amendments 9 docs -
Fairfield Barn, Pewsey, SN9 5JU
Discharge of condition 8 (Wildlife Protection and Enhancement Scheme) relating to application PL/2022/06484.
Granted Conditions 6 docs -
Withy Tree Cottage, Knowle, Pewsey, SN9 5JH
Demolition of existing thatched cottage with replacement dwelling together with associated alterations and formation of parking
Refused Full applications Demolition 37 docsDomestic
Other condition discharge and variation applications
In Wiltshire
-
PL/2026/05414 Granted
Tottenham House and Estate, Grand Avenue, -, Savernake, SN8 3BE
Partial Discharge of Condition 3 (CEMP) relating to application PL/2025/03471
-
PL/2026/05047 Granted
Land Adjacent to Lambdown Terrace, Swinton Barracks, Perham Down, Wiltshire, SP11 9JN
Discharge of conditions 3 (Construction Management Plan), 9 (Construction Environmental Management Plan) and 10 (Landscape and Ecology Management Plan) relating to PL/2025/01089.
-
PL/2026/03861 Granted
Trowbridge Town Football Club, Woodmarsh, North Bradley, Trowbridge, BA14 0SA
Discharge of Conditions 4 (Landscape and Ecology Management Plan) & 5 (Surface Water Drainage Strategy) of PL/2025/07252.
-
PL/2026/05074 Granted
192 Norrington Gate, Broughton Gifford, SN12 8LW
Discharge of condition 12 (External Lighting) relating to application PL/2024/11175
-
PL/2026/03634 Granted
Land South East of 18 Midford Lane, Limpley Stoke, BA2 7GP
Discharge of Condition 13 of PL/2023/10970 in Relation to Scheme of Lighting and Spill Mitigation