Planning application
Graham Oliver Gallery, 97 Brown Street, Salisbury, SP1 2BA
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Non-Material Amendment to planning application PL/2025/04423 - To install services to bedroom 4.
As published by the council, reference PL/2025/08452
Application record
- Reference
- PL/2025/08452
- Type
- Non-Material Amendment
- Status
- Closed
- Decision
- Granted As published: Approve with Conditions
- Received
- 11 Nov 2025
- Validated
- 11 Nov 2025
- Decided
- 1 Dec 2025
- Ward
- Salisbury Harnham East ED
- Parish
- Salisbury CP
- Postcode
- SP1 2BA
Site history
Applications at this address on the Wiltshire register
This site has had 2 applications since 2025: 2 approved, 0 refused.
-
PL/2025/08450 Granted
Graham Oliver Gallery, 97 Brown Street, Salisbury, SP1 2BA
To install services to a bedroom to create an ensuite relating to planning application PL/2025/04423
Timeline
Dates from the published record
-
11 Nov 2025
Received by Wiltshire
-
1 Dec 2025
Decision issued: Approve with Conditions
-
12 Aug 2026
Added to PlanIndex
What this grant of permission means
Wiltshire granted permission on 1 December 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About amendment applications
An amendment application makes limited changes to a permission that already exists; anything beyond modest adjustment needs a fresh application. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
97 BROWN STREET, SALISBURY, SP1 2BA
Discharge of conditions 4 and 6 of PL/2025/04423 - Conversion of 6 bed HMO to 7 bed HMO - River Avon SAC and New Forest Special Area of Conservation
Granted Conditions 5 docs -
91 Brown Street, Salisbury, SP1 2BA
Installation of four solar panels within a concealed internal roof valley and associated works
Granted Heritage and listed buildings 15 docs -
91 Brown Street, Salisbury, SP1 2BA
Installation of four solar panels within a concealed internal roof valley and associated works
Granted Householder 16 docsDomestic -
Graham Oliver Gallery, 97 Brown Street, Salisbury, SP1 2BA
To install services to a bedroom to create an ensuite relating to planning application PL/2025/04423
Granted Heritage and listed buildings 9 docs -
50 Trinity Street, Salisbury, SP1 2BD
Replacement of existing single storey conservatory with new single storey structure on same footprint
Granted Lawful development Extension 7 docsSmall domestic -
31 Trinity Street, Salisbury, SP1 2BD
Proposed change from C3 Residential to C4 HMO for between 3-6 un related individuals.
Granted Lawful development 7 docs
Other amendment applications
In Wiltshire
-
PL/2026/05332 Granted
Fairfield Barn, Fairfield Farm, Pewsey, SN9 5JU
Variation of condition 2 (Approved plans) of PL/2022/06484 to allow minor amendments to the approved design, including the installation of solar panels, the addition of a flue and alterations to approved openings.
-
PL/2026/01316 Granted
Widham Barn, 27 Widham, Purton, Swindon, SN5 4EW
Vary Condition 2 to PL/2024/01523 Barn conversion re-design - Proposed Extension to approve barn conversion with associated ancillary development comprising the erection of a new garage outbuilding and landscaping
-
PL/2026/01724 Granted
Poulton Mill, Poulton Hill, Marlborough, SN8 2LN
Variation of condition 2 (Approved Plans) relating to application PL/2021/04663 - To regularise several changes in the design of the equine building.
-
PL/2026/03379 Withdrawn
Cemetery Gate Copse, Off Holt Road, Wiltshire, BA15 1TS
Removal Condition 3 on PL/2026/01852 - The removal of the existing 3no antennas and 1no. cabinet; the installation of 6no. antennas, 1no. 300mm and 1no. 600mm dishes, 18 ERS units and 1no. GPS module mounted on the existing 25m mast; the installation of 1
-
PL/2026/03881 Granted
Ropers Field , Little Somerford, Chippenham, SN15 5JX
Variation of condition 1 of PL/2022/08414 (approved plans) to reduce the size of the implement store