Skip to content
PlanIndex Get alerts
Menu

Planning application

33 Carr Lane Lowton Warrington WA3 1AF

Awaiting decision Wigan A/25/100120/FULL Full Details

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Change of use from single dwelling (use Class C3) to a childrens residential home for up to 3 children (Use Class C2) together with installation of new driveway

As published by the council, reference A/25/100120/FULL

Application record

Reference
A/25/100120/FULL
Type
Full Details
Status
Registered
Received
3 Dec 2025
Validated
18 Dec 2025
Ward
Lowton East
Parish
Golborne And Lowton Township
Postcode
WA3 1AF

Timeline

Dates from the published record

  1. 3 Dec 2025

    Received by Wigan

  2. 18 Dec 2025

    Validated

    Checked as complete and ready for consideration.

  3. 21 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 12 February 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Wigan took a median of 78 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

11 documents on file for this application

  • TREES AND WOODLANDS OFFICER Consultee Reply · 12 May 2026
  • AMENDED SITE PLAN Plans and Drawings · 17 Feb 2026
  • ONLINE COMMENT Public Comment · 28 Jan 2026
  • ONLINE COMMENT Public Comment · 25 Jan 2026
  • TRANSPORT POLICY Consultee Reply · 19 Jan 2026
  • APPLICATIONFORMREDACTED Application Form · 03 Dec 2025
  • 33CL L90001 SITE LOCATION AND REDLINE PLAN REV A Location Plan · 03 Dec 2025
  • 33CL L20001 EX PROP GROUND FLOOR PLANS REV A Plans and Drawings · 03 Dec 2025
  • 33CL L20002 EX PROP FIRST FLOOR PLANS REV A Plans and Drawings · 03 Dec 2025
  • 33CL L21001 EX PROP EXTERNAL ELEVATIONS REV A Plans and Drawings · 03 Dec 2025
  • 33CL L21002 EX PROP EXTERNAL ELEVATIONS REV A Plans and Drawings · 03 Dec 2025

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Wigan for determination, against a statutory target of eight weeks. Over the last year Wigan decided full applications in a median of 153 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

In Wigan

  • 109 Shevington Moor Standish Wigan WN6 0SE

    Change of use of residential property to childrens day nursery (Use Class E(f)) including demolition and removal of existing blockwork staircase to basement, brick chimney and flat roof porch on the northern (rear) facade; removal of dilapidated steel structure on the (southern) front façade; erection of a replacement flat roof porch to rear (northern), first floor terrace with obscure glazing and metal staircase on the northwestern side; demolition and removal of concrete areas to the eastern (rear) and eastern (side) garden areas; removal of the northern (rear) outbuilding/garage on the eastern side and planters to the front; and layout 9 car parking spaces

    5 Jan 2026 Full applications
  • Leigh St Johns Church Of England Primary School Kirkhall Lane Leigh WN7 1RY

    Single storey extension and new external ramp

    1 Jul 2026 Full applications
  • 169 Shevington Lane Shevington Wigan WN6 8AD

    Erection of a new detached dormer bungalow, garage to front and outbuilding to rear, with landscaping, following demolition of existing bungalow and garage

    15 Apr 2026 Full applications
  • 3 Maple Avenue Hindley Green Wigan WN2 4LS

    Change of use from single dwelling (Use Class C3) to a childrens residential home for up to two children (Use Class C2) (Retrospective Application)

    17 Feb 2026 Full applications
  • 5 Kilshaw Court Kilshaw Street Pemberton Wigan WN5 8EA

    Construction of a new external hard standing area for external material storage

    15 Apr 2026 Full applications