Planning application
Buildings C19 and C21, BAE Systems, Bridge Road, Barrow-in-Furness, Cumbria LA14 1AF
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Erection of new packaged fire pump house and 2 number fire water storage tanks and supporting concrete base and associated pipework.
As published by the council, reference B18/2021/0420
Application record
- Reference
- B18/2021/0420
- Status
- Permitted
- Decision
- Granted As published: APPCOND
- Received
- 13 May 2021
- Validated
- 13 May 2021
- Decided
- 18 Aug 2021
- Postcode
- LA14 1AF
Timeline
Dates from the published record
-
13 May 2021
Received by Westmorland and Furness
-
18 Aug 2021
Decision issued: APPCOND
-
15 Aug 2026
Added to PlanIndex
What this grant of permission means
Westmorland and Furness granted permission on 18 August 2021, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About this record
The published feed does not state which type of application this is; the register entry on Westmorland and Furness's portal will say. Our guide explains the common types.
Nearby applications
Within 0.3 miles
-
Car Park to rear of Waterside House, Bridge Road Barrow-In-Furness Cumbria LA14 1AF
Siting of a single-storey, temporary Portakabin building used as a drug and alcohol test centre. The application seeks 104 weeks temporary planning permission.
Granted Full applicationsSmall domestic -
BAE Systems Bridge Road Barrow-in-Furness Cumbria LA14 1AF
92% historically approved · decision due ~9 Sep
Application for the installation of security fencing, lighting and associated works.
Awaiting decision -
BAE Systems, Steam Generation Facility, Bridge Road, Barrow-in-Furness, Cumbria, LA14 1AF
Application for a Minor Material Amendment under Section 73 for variation of condition no. 7 to allow for alternative drainage details to be provided, where Sustainable Urban Drainage Scheme (SuDS) are impractical, and to discharge the submitted drainage details, removal of condition no. 12 as it would no longer be applicable to planning permission 2022/0295 (Erection of a steam generation facility (SGF), the installation of a new retaining wall with fence, a nitrogen compound and associated works).
Granted ConditionsSmall domestic -
BAE Systems, Steam Generation Facility, Bridge Road, Barrow-in-Furness, Cumbria, LA14 1AF
Application for a Minor Material Amendment under Section 73 for variation of condition no. 7 to allow for alternative drainage details to be provided, where Sustainable Urban Drainage Scheme (SuDS) are impractical, and to discharge the submitted drainage details, removal of condition no. 12 as it would no longer be applicable to planning permission 2022/0295 (Erection of a steam generation facility (SGF), the installation of a new retaining wall with fence, a nitrogen compound and associated works).
Granted ConditionsSmall domestic -
Buildings C19 and C21, BAE Systems, Bridge Road, Barrow-in-Furness, Cumbria LA14 1AF
Erection of new packaged fire pump house and 2 number fire water storage tanks and supporting concrete base and associated pipework.
Granted -
BAE Systems Bridge Road Barrow-In-Furness Cumbria LA14 1AF
94% historically approved · decision due ~12 Aug
New permanent modular office and storage building within existing industrial site.
Awaiting decision