Planning application

3/25/9006

Morland Wastewater Treatment Works (WwTW) North of Little Appleby Lane Morland Penrith CA10 3AZ

Granted Westmorland and Furness Minerals & Waste Application view via https://planning.cumbria.gov.uk/

Proposal

Extension to Wastewater Treatment Works to accommodate a new inlet works with associated infrastructure, ground level changes, fencing and hardstanding, and new access track.

As published by the council, reference 3/25/9006

Timeline

Dates from the published record

  1. 28 Apr 2026

    Received by Westmorland and Furness

  2. 23 Jun 2026

    Decision issued: Approved

  3. 27 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About other applications

How this application type works

This application sits outside the common categories, which can include county matters such as minerals and waste, works by statutory undertakers, demolition notifications and other less frequent procedures. The council record linked below sets out the specific procedure that applies, and the description above is taken directly from the published register.

More on other applications in our guide

Nearby applications

Within 500 metres

  • 3/25/9006 Granted

    Morland Wastewater Treatment Works (WwTW) North of Little Appleby Lane Morland Penrith CA10 3AZ

    Extension to Wastewater Treatment Works to accommodate a new inlet works with associated infrastructure, ground level changes, fencing and hardstanding, and new access track.

    28 Apr 2026 0m away Other
  • 2026/1038/FPA Granted

    The Crown Inn Morland Penrith CA10 3AZ

    Alterations and porch extension.

    19 May 2026 245m away Full applications
  • 2026/1038/FPA Granted

    The Crown Inn Morland Penrith CA10 3AZ

    Alterations and porch extension.

    19 May 2026 245m away Full applications
  • 2025/1301/HOU Decided

    3 High Street Morland PENRITH CA10 3AS

    Creation of driveway.

    9 Jul 2025 366m away Householder
  • 2025/1286/HOU Decided

    2 High Street Morland Penrith CA10 3AS

    Creation of driveway.

    4 Jul 2025 366m away Householder
  • 23/0571 Refused

    LAND BEHIND TANGLEWOOD, HIGH STREET, MORLAND, PENRITH, CA10 3AS

    Discharge of conditions 5 (shared access), 6 (access and parking), 10 (tree protection), 12 (surface water drainage scheme), 13 (construction surface water management plan), 14 (Flood Defence consent), 15 (drainage) and 16 (sustainable drainage management and maintenance plan), attached to approval 16/0682.

    17 Aug 2023 366m away Conditions

In Westmorland and Furness

  • 2026/1279/OHLI Granted

    Railway Cottages Long Marton APPLEBY-IN-WESTMORLAND CA16 6BY

    Notification under The Electricity Act 1989 Overhead Lines (Exemption) (England and Wales) Regulations 2009 for replacement electricity pole.

    18 Jun 2026 Other
  • 3/25/9004 Decided

    Land to the East of the Kirkby Thore Works Kirkby Thore Penrith CA10 1XU

    Erection of Rock Store Building and associated ancillary development (Retrospective)

    16 Jul 2026 Other
  • 3/25/9005 Decided

    Land to the South-East of the Kirkby Thore Works Kirkby Thore Penrith CA10 1XU

    Construction of a trailer park and HVO/adblue refuelling point and associated ancillary development (Retrospective)

    16 Jul 2026 Other
  • B18/2026/0286 Decided

    St Columbas Roman Catholic School, Church Lane, Barrow-In-Furness, Cumbria, LA14 3AD

    Single storey detached nursery building within site boundary of existing primary school.

    15 Jul 2026 Other
  • B21/2026/0299 Decided

    7 Welbeck Close Barrow-In-Furness Cumbria LA13 9UU

    Demolition of existing rear conservatory and construction of a two storey pitched roof rear extension

    15 Jul 2026 Other