Skip to content
PlanIndex Get alerts
Menu

Planning application

Boot And Shoe Inn Berrier Road Greystoke Penrith CA11 0TP

Awaiting decision Lake District National Park 2026/1749/LBC Listed Building Consent

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Internal alterations to include, removal of a section of non original fixed seating, an adjoining non-original and non-structural low level timber screen wall and a decorative timber post in the bar area. Alterations to the bar servery back counters, refurbishment of toilets, formation of a shower enclosure within an existing first floor ensuite; and formation of a kitchenette within the private accommodation, and associated redecoration works, floor finishes, joinery repairs, furniture and lighting.

As published by the council, reference 2026/1749/LBC

Application record

Reference
2026/1749/LBC
Type
Listed Building Consent
Status
Consultation Started
Received
7 Sep 2026
Validated
7 Sep 2026
Ward
Greystoke and Ullswater
Parish
Greystoke
Decision by
Delegated
Postcode
CA11 0TP

Site history

Applications at this address on the Lake District National Park register

This site has had 2 applications since 2025.

  • 2025/0474/FPA Awaiting decision

    Boot And Shoe Inn Berrier Road Greystoke Penrith CA11 0TP

    Retrospective application for the retention of covered area containing chiller and freezer units with retrofitted acoustic hoods.

    Submitted 10 Mar 2025 Full applications

Timeline

Dates from the published record

  1. 7 Sep 2026

    Received by Lake District National Park

  2. 22 Sep 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 2 November 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Lake District National Park took a median of 54 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

14 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Lake District National Park for determination, against a statutory target of eight weeks. Over the last year Lake District National Park decided heritage and listed building applications in a median of 77 days. More in our guide to how long planning decisions take.

About heritage and listed building applications

Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

In Lake District National Park

  • 7/2026/5464 Granted

    Barrow Wife, Cartmel Fell, Grange-over-Sands, LA11 6NZ

    Replacement window to SW gable

    Received 17 Aug, published by the council 27 Aug 2026 Heritage and listed buildings
  • 2026/1606/LBC Granted

    64 Highgate KENDAL LA9 4TF

    Listed Building Consent for alterations to the internal modern lobby screen to replace the door

    Received 13 Aug, published by the council 28 Aug 2026 Heritage and listed buildings
  • 2026/1539/LBC Granted

    Clock Tower 3 Boarbank Farm Boarbank Lane Allithwaite GRANGE-OVER-SANDS LA11 7QU

    Listed Building Consent for replacement external timber double doors with painted timber double doors of matching design, proportions and appearance, incorporating double glazed units

    Received 3 Aug, published by the council 9 Aug 2026 Heritage and listed buildings
  • 2026/1357/LBC Granted

    The Old Bar Cavendish Street Cartmel GRANGE-OVER-SANDS LA11 6QA

    Retrospective Listed Building Consent for internal alterations to the second floor accommodation, installation of timber top-hung sash windows in place of approved timber sliding sash windows on the side and rear elevations of the property, minor repositioning of an approved rooflight, and lowering of the ground floor level.

    Received 6 Jul, published by the council 27 Jul 2026 Heritage and listed buildings
  • 2026/1537/LBC Granted

    White House Langwathby PENRITH CA10 1LW

    Listed building consent for the replacement of two open fires with wood burning stoves and surrounds.

    Received 31 Jul, published by the council 9 Aug 2026 Heritage and listed buildings