Skip to content
PlanIndex Get alerts
Menu

Planning application

Center Parcs Whinfell Forest Penrith CA10 2DW

Decided Westmorland and Furness 2026/1621/FPA Full Application

Works: Extension Trees

Decided. The decision notice on the council portal carries the outcome in full, including any conditions.

Proposal

External landscaping works to 53 holiday lodges to include extension of patios, paved areas and new pergolas, and removal of 8 trees.

As published by the council, reference 2026/1621/FPA

Application record

Reference
2026/1621/FPA
Type
Full Application
Status
Consultation Started
Decision
Pending
Received
18 Aug 2026
Validated
18 Aug 2026
Ward
Eden and Lyvennet Vale
Parish
Brougham
Decision by
Delegated
Postcode
CA10 2DW

Comment by 17 September 2026

The council is taking comments on this application until then. Comments go to Westmorland and Furness through their own planning portal.

Timeline

Dates from the published record

  1. 18 Aug 2026

    Received by Westmorland and Furness

  2. 31 Aug 2026

    Added to PlanIndex

  3. 8 Sep 2026

    Status changed to Consultation Started

    Previously Valid.

Documents

Plans, drawings, consultee responses and the officer's report

25 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

After the decision

The process from here

The council has decided this application; the published outcome sits in the record above and the decision notice on the council portal carries the detail, including any conditions.

If permission was granted, work must normally begin within three years of the decision. If it was refused, the applicant can appeal within the statutory time limit or submit a revised scheme.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Center Parcs Whinfell Forest Whinfell Forest Penrith CA10 2DW

    2026/0839/DISC Submitted 23 Apr 2026 0m away

    Application for the approval of details reserved by condition 3 (Production of a 10 year Habitat Management and Monitoring Plan (HMMP)), attached to approval 2025/0215/FPA.

    Decided Conditions 3 docs
  • Land adjacent the Outdoor Activity Centre Center Parcs Penrith Whinfell Forest Village CA10 2DW

    2026/1298/DISC Submitted 25 Jun 2026 0m away

    Application for the approval of details reserved by conditions 3 (Habitat Management and Monitoring Plan) and 5 (Construction Environmental Management Plan) attached to approval 2024/1270/FPA (Removal of existing tanks and structure and construction of new water storage tanks, a single storey pump dosing building, a single storey storage building, retaining walls and bases).

    Decided Conditions 4 docs
    Small domestic
  • Center Parcs Whinfell Forest Village Whinfell PENRITH CA10 2DW

    2026/0283/DISC Submitted 5 Feb 2026 0m away

    Application for the approval of details reserved by conditions 3 (Construction Environmental Management Plan (CEMP)), 4 (production of a 30 year Habitat Management and Monitoring Plan (the HMMP)), 7 (replacement tree planting scheme) 8 (tree protection) and the Biodiversity Gain Deemed Condition, attached to approval 2025/1225/FPA.

    Decided Conditions 11 docs
  • Center Parcs Whinfell Forest Village Whinfell PENRITH CA10 2DW

    2026/0562/FPA Submitted 16 Mar 2026 0m away

    Proposed external landscaping works to 112 existing holiday lodges to include extension of patios, paved areas and new pergolas, and removal of 22 trees.

    Granted Full applications Extension Trees 64 docs
  • Center Parcs Whinfell Forest Village Whinfell PENRITH CA10 2DW

    2026/0695/FPA Submitted 1 Apr 2026 0m away

    Installation of adventure nets and kiosk with associated infrastructure.

    Granted Full applications 12 docs
  • Center Parcs Whinfell Forest Village Whinfell PENRITH CA10 2DW

    2026/0562/FPA Submitted 16 Mar 2026 0m away

    Proposed external landscaping works to 112 existing holiday lodges to include extension of patios, paved areas and new pergolas, and removal of 22 trees.

    Granted Full applications Extension Trees 64 docs

In Westmorland and Furness

  • 2026/0955/FPA Granted

    Town Head Farm Unthank Skelton PENRITH CA11 9TG

    Agricultural storage building.

    8 May 2026 Full applications
  • 2026/1271/FPA Granted

    Crayston Shap PENRITH CA10 2NU

    Change of use of field barn and attached buildings to create a dwellinghouse with associated operations.

    19 Jun 2026 Full applications
  • 2026/1067/FPA Granted

    Mount Pleasant Farm Brough KIRKBY STEPHEN CA17 4DX

    Proposed general purpose agricultural building to include use as a facility to winter cattle on disused agricultural hardstanding.

    22 May 2026 Full applications
  • 2026/1695/FPA Decided

    Kings Arms Hotel 7 Market Street Kirkby Lonsdale Carnforth LA6 2AU

    Removal of existing fresh air intake fan and grille from front ground-floor kitchen window, reinstatement of the timber window, and relocation of intake ducting through an existing low-level opening.

    27 Aug 2026 Full applications
  • 2026/1691/FPA Decided

    Former Duddon Valley Medical Practice Askew Gate Brow Kirkby-In-Furness LA17 7TE

    Change of use from GP surgery (Use Class E) to a dwellinghouse (Use Class C3) with associated alterations including new and altered window and door openings, a raised rear deck and steps, and landscaping works.

    27 Aug 2026 Full applications