Planning application

2026/0975/FPA

Kendal Nutricare Ltd Farley Health Products Ltd Lake District Business Park Mint Bridge Road KENDAL LA9 6NL

Decided Westmorland and Furness Full Application

Proposal

Variation of Condition 2 (Approved Plans and Documents) attached to planning permission SL/2023/0163 (New building on existing car park to house a spray dryer, existing covered walkway to be enclosed to create new access corridor, car park spaces to be reconfigured to suit building position (MAJOR APPLICATION)

As published by the council, reference 2026/0975/FPA

Timeline

Dates from the published record

  1. 12 May 2026

    Received by Westmorland and Furness

  2. 22 Jun 2026

    Validated

    Checked as complete and ready for consideration.

  3. 27 Jul 2026

    Added to PlanIndex

After the decision

The process from here

The council has decided this application; the published outcome sits in the record above and the decision notice on the council portal carries the detail, including any conditions.

If permission was granted, work must normally begin within three years of the decision. If it was refused, the applicant can appeal within the statutory time limit or submit a revised scheme.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 2026/0975/FPA Decided

    Kendal Nutricare Ltd Farley Health Products Ltd Lake District Business Park Mint Bridge Road KENDAL LA9 6NL

    Variation of Condition 2 (Approved Plans and Documents) attached to planning permission SL/2023/0163 (New building on existing car park to house a spray dryer, existing covered walkway to be enclosed to create new access corridor, car park spaces to be reconfigured to suit building position (MAJOR APPLICATION)

    12 May 2026 0m away Full applications
  • 2026/0759/DISC Refused

    Farley Health Products Ltd Lake District Business Park Mint Bridge Road Kendal LA9 6NL

    Application for the approval of details reserved by condition 5 (external cladding) attached to planning permission SL/2023/0163

    15 Apr 2026 0m away Conditions
  • 2026/0759/DISC Refused

    Farley Health Products Ltd Lake District Business Park Mint Bridge Road Kendal LA9 6NL

    Application for the approval of details reserved by condition 5 (external cladding) attached to planning permission SL/2023/0163

    15 Apr 2026 0m away Conditions

In Westmorland and Furness

  • 2026/1029/FPA Granted

    6 Brogden Street ULVERSTON LA12 7AH

    Demolition and reinstatement of principal elevation wall and associated works (part retrospective)

    18 May 2026 Full applications
  • 2026/1007/FPA Granted

    Romanway Plumpton PENRITH CA11 9NS

    Erection of a building over an existing collecting yard.

    14 May 2026 Full applications
  • 2026/1023/FPA Granted

    3 Jingling Lane Kirkby Lonsdale CARNFORTH LA6 2AW

    Variation of condition 2 (approved plans) attached to planning permission 2025/2283/HOU (Demolition of outbuildings, alterations and extensions to dwelling with associated site works. Widen current vehicular access)

    15 May 2026 Full applications
  • 2026/0779/FPA Granted

    Monkcastle Farm Monkcastle Southwaite CARLISLE CA4 0PZ

    Erection of a replacement livestock shed.

    20 Apr 2026 Full applications
  • 2026/0761/FPA Granted

    7 New Road KENDAL LA9 4AY

    Replacement windows to the front and rear elevations

    15 Apr 2026 Full applications