Skip to content
PlanIndex Get alerts
Menu

Planning application

6 Inverness Terrace London W2 3HU

Awaiting decision Westminster 26/06360/FULL Full applications

Works: Extension Loft or dormer

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Erection of a new mansard roof extension at roof level - new fifth floor. Relocation of plant room to existing rear ground floor flat roof. (Linked with 26/06361/LBC)

As published by the council, reference 26/06360/FULL

Application record

Reference
26/06360/FULL
Category
Full applications
Status
Pending
Received
17 Sep 2026
Validated
17 Sep 2026
Postcode
W2 3HU

Site history

Applications at this address on the Westminster register

This site has had 4 applications since 2026.

  • 26/06361/LBC Awaiting decision

    6 Inverness Terrace London W2 3HU

    Erection of a new mansard roof extension at roof level - new fifth floor. Relocation of plant room to existing rear ground floor flat roof. (Linked with 26/06360/FULL)

    Submitted 17 Sep 2026 Heritage and listed buildings
  • 26/06378/FULL Awaiting decision

    6 Inverness Terrace London W2 3HU

    Construction of a rear fourth floor closet wing extension (to match the existing fourth floor closet wings at 2 and 4 Inverness Terrace). (Linked to 26/06379/LBC)

    Submitted 17 Sep 2026 Full applications
  • 26/06379/LBC Awaiting decision

    6 Inverness Terrace London W2 3HU

    Construction of a rear fourth floor closet wing extension (to match the existing fourth floor closet wings at 2 and 4 Inverness Terrace). (Linked to 26/06378/FULL)

    Submitted 17 Sep 2026 Heritage and listed buildings

Timeline

Dates from the published record

  1. 17 Sep 2026

    Received by Westminster

  2. 24 Sep 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 12 November 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Westminster took a median of 86 days over the applications it decided in the last year.

Cases linked to this one on the register

1 later application on the register refers to this one:

  • 26/06361/LBC Awaiting decision

    6 Inverness Terrace London W2 3HU

    Erection of a new mansard roof extension at roof level - new fifth floor. Relocation of plant room to existing rear ground floor flat roof. (Linked with 26/06360/FULL)

    Submitted 17 Sep 2026 Heritage and listed buildings

What happens while it is decided

This application is with Westminster for determination, against a statutory target of eight weeks. Over the last year Westminster decided full applications in a median of 119 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 6 Inverness Terrace London W2 3HU

    26/06361/LBC Submitted 17 Sep 2026 50 yards away

    90% historically approved · decision due ~12 Nov

    Erection of a new mansard roof extension at roof level - new fifth floor. Relocation of plant room to existing rear ground floor flat roof. (Linked with 26/06360/FULL)

    Awaiting decision Heritage and listed buildings Extension Loft or dormer
  • 6 Inverness Terrace London W2 3HU

    26/06378/FULL Submitted 17 Sep 2026 50 yards away

    88% historically approved · decision due ~12 Nov

    Construction of a rear fourth floor closet wing extension (to match the existing fourth floor closet wings at 2 and 4 Inverness Terrace). (Linked to 26/06379/LBC)

    Awaiting decision Full applications Extension
  • 6 Inverness Terrace London W2 3HU

    26/06379/LBC Submitted 17 Sep 2026 50 yards away

    90% historically approved · decision due ~12 Nov

    Construction of a rear fourth floor closet wing extension (to match the existing fourth floor closet wings at 2 and 4 Inverness Terrace). (Linked to 26/06378/FULL)

    Awaiting decision Heritage and listed buildings Extension
  • Hyde Park Studio Apartments 8 - 18 Inverness Terrace London W2 3HU

    25/05416/LBC Submitted 1 Aug 2025 50 yards away

    Erection of single storey rear fourth floor extensions to the existing closet wings x 6 to provide 6 x C1 Units. (Linked with 25/05415/FULL)

    Withdrawn Heritage and listed buildings Extension 4 docs
    Small domestic
  • Hyde Park Studio Apartments 8 - 18 Inverness Terrace London W2 3HU

    25/05415/FULL Submitted 1 Aug 2025 50 yards away

    Erection of single storey rear fourth floor extensions to the existing closet wings x 6 to provide 6 x C1 Units. (Linked with 25/05416/LBC)

    Withdrawn Full applications Extension 35 docs
    Small domestic
  • Hyde Park Studio Apartments 8 - 18 Inverness Terrace London W2 3HU

    26/02541/FULL Submitted 17 Apr 2026 50 yards away

    88% historically approved · decision due ~17 Jul

    Erection of single storey extension at rear fourth floor level to rear of 16 Inverness Terrace, in association with the installation of a lift from lower ground to fourth floor level. (Linked with 26/02542/LBC)

    Awaiting decision Full applications Extension 45 docs
    Small domestic

In Westminster

  • 26/05984/FULL Decided

    41 Sutherland Street London SW1V 4JX

    Replacement of front, side and rear windows with double glazed timber framed sash windows and replacement of a door with a double glazed timber framed door.

    Received 2 Sep, published by the council 11 Sep 2026 Full applications
  • 26/06134/FULL Decided

    Flat 10H Hyde Park Mansions Cabbell Street London NW1 5BG

    Replacement of front and rear second floor level windows with slim-profile double-glazed panels, retaining the existing window and door frames.

    Received 8 Sep, published by the council 15 Sep 2026 Full applications
  • 26/07258/FULL Awaiting decision

    16A Croxley Road London W9 3HL

    Installation of air to air heat pumps to offices and bedrooms.

    Received 22 Oct, published by the council 23 Oct 2026 Full applications
  • 26/07193/FULL Awaiting decision

    98 Victoria Street London SW1E 5JL

    Shopfront alterations. (Linked with 26/07194/ADV)

    Received 21 Oct, published by the council 22 Oct 2026 Full applications
  • 26/07187/FULL Awaiting decision

    Ground Floor Flat 151 Portnall Road London W9 3BN

    Erection of a single storey rear extension.

    Received 21 Oct, published by the council 22 Oct 2026 Full applications