Skip to content
PlanIndex Get alerts
Menu

Planning application

Flat CC 20 Westbourne Terrace London W2 3UP

Awaiting decision Westminster 26/05858/LBC Heritage and listed buildings

Works: Windows or glazing

Relates to 26/05857/FULL

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Replacement of three windows on the front of the property with double glazed timber framed windows; replacement of door and window to rear terrace; and, internal layout alterations. (Linked with 26/05857/FULL)

As published by the council, reference 26/05858/LBC

Application record

Reference
26/05858/LBC
Category
Heritage and listed buildings
Status
Pending
Received
26 Aug 2026
Validated
11 Sep 2026
Postcode
W2 3UP

Site history

Applications at this address on the Westminster register

This site has had 4 applications since 2026.

  • 26/06344/LBC Awaiting decision

    Flat CC 20 Westbourne Terrace London W2 3UP

    Construction of new lightweight balcony and access from existing bedroom. (Linked with 26/06343/FULL)

    Submitted 16 Sep 2026 Heritage and listed buildings
  • 26/06343/FULL Awaiting decision

    Flat CC 20 Westbourne Terrace London W2 3UP

    Construction of new lightweight balcony and access from existing bedroom. (Linked with 26/06344/LBC)

    Submitted 16 Sep 2026 Full applications
  • 26/05857/FULL Awaiting decision

    Flat CC 20 Westbourne Terrace London W2 3UP

    Replacement of three windows on the front of the property with double glazed timber framed windows; and, replacement of door and window to rear terrace. (Linked with 26/05858/LBC)

    Submitted 26 Aug 2026 Full applications

Timeline

Dates from the published record

  1. 26 Aug 2026

    Received by Westminster

  2. 11 Sep 2026

    Validated

    Checked as complete and ready for consideration.

  3. 11 Sep 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 6 November 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Westminster took a median of 91 days over the applications it decided in the last year.

Cases linked to this one on the register

  • 26/05857/FULL Awaiting decision

    Flat CC 20 Westbourne Terrace London W2 3UP

    Replacement of three windows on the front of the property with double glazed timber framed windows; and, replacement of door and window to rear terrace. (Linked with 26/05858/LBC)

    Submitted 26 Aug 2026 Full applications

1 later application on the register refers to this one:

  • 26/05857/FULL Awaiting decision

    Flat CC 20 Westbourne Terrace London W2 3UP

    Replacement of three windows on the front of the property with double glazed timber framed windows; and, replacement of door and window to rear terrace. (Linked with 26/05858/LBC)

    Submitted 26 Aug 2026 Full applications

What happens while it is decided

This application is with Westminster for determination, against a statutory target of eight weeks. Over the last year Westminster decided heritage and listed building applications in a median of 119 days. More in our guide to how long planning decisions take.

About heritage and listed building applications

Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Flat CC 20 Westbourne Terrace London W2 3UP

    26/05857/FULL Submitted 26 Aug 2026 50 yards away

    88% historically approved · decision due ~6 Nov

    Replacement of three windows on the front of the property with double glazed timber framed windows; and, replacement of door and window to rear terrace. (Linked with 26/05858/LBC)

    Awaiting decision Full applications Windows or glazing
  • 26 Westbourne Terrace London W2 3UP

    26/05905/TPO Submitted 27 Aug 2026 50 yards away

    1 x London plane: crown lift low hanging twiggy growth to 6m and cut back from property to give a clearance of 5m.

    Granted Trees
  • 20 Westbourne Terrace London W2 3UP

    26/05904/TPO Submitted 27 Aug 2026 50 yards away

    1 x London plane: crown lift low hanging twiggy growth to 6m and cut back from property to give a clearance of 5m.

    Granted Trees
  • Flat CC 20 Westbourne Terrace London W2 3UP

    26/06344/LBC Submitted 16 Sep 2026 50 yards away

    90% historically approved · decision due ~9 Dec

    Construction of new lightweight balcony and access from existing bedroom. (Linked with 26/06343/FULL)

    Awaiting decision Heritage and listed buildings
  • Flat CC 20 Westbourne Terrace London W2 3UP

    26/06343/FULL Submitted 16 Sep 2026 50 yards away

    88% historically approved · decision due ~9 Dec

    Construction of new lightweight balcony and access from existing bedroom. (Linked with 26/06344/LBC)

    Awaiting decision Full applications
  • 26 Smallbrook Mews London W2 3BN

    11/06983/ADFULL Submitted 20 Jul 2011 50 yards away

    Details of new windows and doors; brickwork and mortar; coping stone and rooflight pursuant to Condition 4 of planning permission dated 6 June 2011 (RN:11/00431).

    Granted Full applications Loft or dormer Windows or glazing 5 docs

In Westminster

  • 26/07529/LBC Awaiting decision

    69 Eaton Place London SW1X 8DF

    Installation of new cast iron water supply pipe on rear courtyard elevation. (Linked with 26/07528/FULL)

    Received 5 Nov, published by the council 6 Nov 2026 Heritage and listed buildings
  • 26/07509/LBC Awaiting decision

    Buckingham Palace The Mall London SW1A 1AA

    Replacement of existing security lighting to the Buckingham Palace Forecourt with 80 compact LED spotlights installed within the lantern clusters across 10 principal piers, with associated concealed cabling and reversible fixings. (Linked with 26/07508/FULL)

    Received 4 Nov, published by the council 5 Nov 2026 Heritage and listed buildings
  • 26/07473/LBC Awaiting decision

    Flat 3 82 New Cavendish Street London W1G 9TA

    Replacement windows to second floor level with vacuum, double glazing windows. (Linked with 26/07472/FULL)

    Received 3 Nov, published by the council 6 Nov 2026 Heritage and listed buildings
  • 26/07471/LBC Awaiting decision

    12 Queen Anne's Gate London SW1H 9AA

    Excavation of single-storey basement, internal reconfiguration and installation of modern services. (Linked with 26/07470/FULL)

    Received 3 Nov, published by the council 5 Nov 2026 Heritage and listed buildings
  • 26/07461/LBC Awaiting decision

    1 Savile Row London W1S 3JR

    Minor internal works comprising redecoration and upgrades to lighting, flooring and bathroom and kitchen facilities, together with external works including new lighting and signage.

    Received 3 Nov, published by the council 5 Nov 2026 Heritage and listed buildings