Skip to content
PlanIndex Get alerts
Menu

Planning application

Royal Albert Hall Kensington Gore London SW7 2AP

Awaiting decision Westminster 26/05836/LBC Heritage and listed buildings

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Installation of a telecommunications cable within a Grade I listed building to provide fibre connectivity.

As published by the council, reference 26/05836/LBC

Application record

Reference
26/05836/LBC
Category
Heritage and listed buildings
Status
Pending
Received
25 Aug 2026
Validated
25 Aug 2026
Postcode
SW7 2AP

Timeline

Dates from the published record

  1. 25 Aug 2026

    Received by Westminster

  2. 28 Aug 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 20 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Westminster took a median of 61 days over the applications it decided in the last year.

What happens while it is decided

The process from here

This application is with Westminster for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About heritage and listed buildings applications

How this application type works

Heritage applications concern listed buildings and conservation areas. Listed building consent is needed for works, inside or out, that affect the special interest of a listed building, and carrying out such works without consent is a criminal offence. The council weighs harm to the heritage asset against any public benefit of the proposal.

More on heritage and listed buildings applications in our guide

Nearby applications

Within 500 metres

  • Royal Albert Hall Kensington Gore London SW7 2AP

    26/05962/LBC Submitted 1 Sep 2026 0m away

    90% historically approved · decision due ~27 Oct

    Variation of condition 2 of listed building consent dated 26 March 2024 (RN: 24/00820/LBC) for the: Erect temporary access scaffolding platform at high level in the auditorium to inspect the condition of the plaster ceilings and main cornices. NAMELY, to allow the gantry to remain in place until December 2028.

    Awaiting decision Heritage and listed buildings
  • Royal Albert Hall Kensington Gore London SW7 2AP

    26/01816/ADFULL Submitted 20 Mar 2026 0m away

    87% historically approved · decision due ~20 May

    Details of handrails pursuant to condition 4 of planning permission dated 10th April 2025 (RN:25/01035/FULL). Linked with 26/01817/ADLBC

    Awaiting decision Full applications 5 docs
  • Royal Albert Hall Kensington Gore London SW7 2AP

    26/01817/ADLBC Submitted 19 Mar 2026 0m away

    90% historically approved · decision due ~20 May

    Details of handrails pursuant to condition 3 of listed building consent dated 10th April 2025 (RN:25/01036/LBC). Linked with 26/01816/ADFULL

    Awaiting decision Conditions 5 docs
  • Royal Albert Hall Kensington Gore London SW7 2AP

    26/01738/FULL Submitted 18 Mar 2026 0m away

    87% historically approved · decision due ~13 May

    Installation of a pavement ventilation grille. (Linked to 26/01739/LBC)

    Awaiting decision Full applications 16 docs
  • Royal Albert Hall Kensington Gore London SW7 2AP

    26/01739/LBC Submitted 18 Mar 2026 0m away

    90% historically approved · decision due ~13 May

    Internal alterations at Basement Level 1 and installation of a pavement ventilation grille. (Linked to 26/01738/FULL)

    Awaiting decision Heritage and listed buildings 16 docs
  • Royal Albert Hall Kensington Gore London SW7 2AP

    26/01717/CLLB Submitted 17 Mar 2026 0m away

    89% historically approved · decision due ~15 May

    Internal refurbishment to create new facilities/mezzanine for the cleaning department within the existing B2 loading bay.

    Awaiting decision 7 docs

In Westminster

  • 26/06025/LBC Awaiting decision

    House Of Commons Palace Of Westminster Parliament Square London SW1A 0AA

    Installation of new and replacement electronic equipment within Speaker. (Linked with 26/06024/FULL)

    3 Sep 2026 Heritage and listed buildings
  • 26/05971/LBC Awaiting decision

    House Of Commons Palace Of Westminster Parliament Square London SW1A 0AA

    Automation of door at principal floor level.

    1 Sep 2026 Heritage and listed buildings
  • 26/05962/LBC Awaiting decision

    Royal Albert Hall Kensington Gore London SW7 2AP

    Variation of condition 2 of listed building consent dated 26 March 2024 (RN: 24/00820/LBC) for the: Erect temporary access scaffolding platform at high level in the auditorium to inspect the condition of the plaster ceilings and main cornices. NAMELY, to allow the gantry to remain in place until December 2028.

    1 Sep 2026 Heritage and listed buildings
  • 26/05970/LBC Awaiting decision

    Norman Shaw Building South Victoria Embankment London SW1A 2HZ

    Replacement and installation of 16 electronic access control systems to Norman Shaw South

    1 Sep 2026 Heritage and listed buildings
  • 26/05943/LBC Awaiting decision

    1 Barton Street London SW1P 3NG

    Use of the building as F1(a) Education, along with associated internal and external alterations. (Linked with 26/05942/FULL)

    1 Sep 2026 Heritage and listed buildings